Size: 1592
Comment:
|
Size: 1597
Comment:
|
Deletions are marked like this. | Additions are marked like this. |
Line 18: | Line 18: |
* The design is ongoing by Hirata-san. The updated design is [[https://naoacjp-my.sharepoint.com/personal/naoatsu_hirata_nao_ac_jp/_layouts/15/onedrive.aspx?id=%2Fpersonal%2Fnaoatsu%5Fhirata%5Fnao%5Fac%5Fjp%2FDocuments%2FShare%2F250516%5FIRM%E3%83%80%E3%83%B3%E3%83%91%E3%83%BC%E8%B3%87%E6%96%99%5F%E9%AB%98%E6%A9%8B%E3%81%95%E3%82%93&ct=1747887714124&or=OWA%2DNT%2DMail&cid=b9720ca4%2Db1c1%2D4c23%2D61d0%2D71dc8a30441f&ga=1|here]]. The efficiency of the actuator was measured ([[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=16608|report]]). | * The design work is ongoing by Hirata-san. The updated design is [[https://naoacjp-my.sharepoint.com/personal/naoatsu_hirata_nao_ac_jp/_layouts/15/onedrive.aspx?id=%2Fpersonal%2Fnaoatsu%5Fhirata%5Fnao%5Fac%5Fjp%2FDocuments%2FShare%2F250516%5FIRM%E3%83%80%E3%83%B3%E3%83%91%E3%83%BC%E8%B3%87%E6%96%99%5F%E9%AB%98%E6%A9%8B%E3%81%95%E3%82%93&ct=1747887714124&or=OWA%2DNT%2DMail&cid=b9720ca4%2Db1c1%2D4c23%2D61d0%2D71dc8a30441f&ga=1|here]]. The efficiency of the actuator was measured ([[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=16608|report]]). |
Contents
VIS Meeting
Date: 2025/5/23 10:00-
Participants:
Topics
Type-A
- ACCs for the IP controls.
Evaluation of the FLDACC with DGS in ATC is ongoing. The present status is here.
Type-B/Bp
- IRM damper for Type-B.
- Enclosure for the SG card in an independent box.
- Tanaka-san made a prototype box. A 1U panel was prepared to mount the box.
- IP for Type-Bp.
Type-C
- Active isolation table for OMC.
- The review was held on May 8th.
The new geophone pre-amp. was evaluated (report).
- We are finding a substitute for the L4-C geophone. There are some candidates ([[|report]]).
- Small Type-C suspensions with mini-GAS.
R&D
Discussion
Next meeting
- 2025/6/6 10:00-