Contents
VIS Meeting
Date: 2025/5/23 10:00-
Participants:
Topics
Type-A
- ACCs for the IP controls.
Evaluation of the FLDACC with DGS in ATC is ongoing. The present status is here.
Type-B/Bp
- IRM damper for Type-B.
- Enclosure for the SG card in an independent box.
- Tanaka-san made a prototype box. A 1U panel was prepared to mount the box.
- IP for Type-Bp.
Type-C
- Active isolation table for OMC.
- Small Type-C suspensions with mini-GAS.
R&D
Discussion
Next meeting
- 2025/6/6 10:00-