Contents
VIS Meeting
Date: 2025/10/10 10:00-
Participants:
Topics
Type-A
- ACCs for the IP controls.
Evaluating the FLDACC with DGS in ATC (report). Noise budget was made.
Type-B/Bp
- IRM damper for Type-B.
- Hirata-san assembled the delivered parts. Installation into the SRM chamber was scheduled in March 9-19.
- Enclosure for the SG card in an independent box.
The prototype box was mounted in a 1U rack.
- IP for Type-Bp.
- Started a design.
Type-C
- Active isolation table for OMC.
New geophone (SM-700C) was delivered and evaluated (report).
- The new geophone pod has been ordered.
It is necessary to adjust the tilt of the table with FRs. The space to embed the FR is considered (estimation).
- Small Type-C suspensions with mini-GAS.
R&D
Discussion
Next meeting
- 2025/10/10 10:00-
