Differences between revisions 7 and 8
Revision 7 as of 2026-01-28 14:48:34
Size: 1295
Comment:
Revision 8 as of 2026-01-30 10:47:58
Size: 1342
Comment:
Deletions are marked like this. Additions are marked like this.
Line 5: Line 5:
Date: 2026/1/30 10:00- Date: 2026/1/30 10:00-10:45
Line 9: Line 9:
Participants: Participants: Sato, Yokozawa, Washimi, Akutsu, Takahashi


VIS Meeting

Date: 2026/1/30 10:00-10:45

Zoom

Participants: Sato, Yokozawa, Washimi, Akutsu, Takahashi

Topics

Type-A

  • Height adjustment
    • Summary of the warming up is here.

  • Oplev
    • Check the amount of light in the power outage.
  • ACCs for the IP controls.
    • TF measurements of the folded pendulum are planned.

Type-B/Bp

  • Mirror replacement and IRM damper.
    • Installation in SRM is scheduled on 3/9-19. The detailed plan is under discussion.

  • New FLDACC
    • Preparing for SRM. Tuning and washing the parts are ongoing.

  • SG card box.
    • Preparing for the boxes with a 1U rack panel.
  • IP for Type-Bp.
    • Started a design.

Type-C

  • Active isolation table for OMC.
    • Sato-san is investigating the manufacturing process for the maraging blade.
  • Small Type-C suspensions with mini-GAS.

R&D

  • The modification of the Type-A tower toward O6.
  • Fabian is making a Python version of Sumcom.

Discussion

Next meeting

  • 2026/2/13 10:00-

KAGRA/Subgroups/VIS/VISMinutes20260130 (last edited 2026-01-30 10:47:58 by RyutaroTakahashi)