Contents
VIS Meeting
Date: 2026/1/30 10:00-10:45
Participants: Sato, Yokozawa, Washimi, Akutsu, Takahashi
Topics
Type-A
- Height adjustment
Summary of the warming up is here.
- Oplev
- Check the amount of light in the power outage.
- ACCs for the IP controls.
- TF measurements of the folded pendulum are planned.
Type-B/Bp
- Mirror replacement and IRM damper.
Installation in SRM is scheduled on 3/9-19. The detailed plan is under discussion.
- New FLDACC
Preparing for SRM. Tuning and washing the parts are ongoing.
- SG card box.
- Preparing for the boxes with a 1U rack panel.
- IP for Type-Bp.
- Started a design.
Type-C
- Active isolation table for OMC.
- Sato-san is investigating the manufacturing process for the maraging blade.
- Small Type-C suspensions with mini-GAS.
R&D
- The modification of the Type-A tower toward O6.
- Fabian is making a Python version of Sumcom.
Discussion
Next meeting
- 2026/2/13 10:00-