|
⇤ ← Revision 1 as of 2026-03-26 08:57:08
Size: 1212
Comment:
|
← Revision 2 as of 2026-03-26 08:58:31 ⇥
Size: 1206
Comment:
|
| Deletions are marked like this. | Additions are marked like this. |
| Line 17: | Line 17: |
| * Installation in SRM * [[https://www.notion.so/SRM-replacement-2ff43f9c5c608064a42acd2f0e7821eb|Notion page]] |
* Installation in SRM ([[https://www.notion.so/SRM-replacement-2ff43f9c5c608064a42acd2f0e7821eb|Notion page]]) |
| Line 28: | Line 27: |
| * Active isolation table for OMC. * [[https://www.notion.so/OMC-VIS-KAGRA-common-2c043f9c5c6080648a56f1944365003e|Notion page]] |
* Active isolation table for OMC. ([[https://www.notion.so/OMC-VIS-KAGRA-common-2c043f9c5c6080648a56f1944365003e|Notion page]]) |
Contents
VIS Meeting
Date: 2026/3/27 10:00-
Participants:
Topics
Type-A
- ACCs for the IP controls.
- TF measurements of the folded pendulum are necessary.
Type-B/Bp
Installation in SRM (Notion page)
- SG card box.
- One box was installed in the SRM rack.
- IP for Type-Bp.
- Started a design.
Type-C
Active isolation table for OMC. (Notion page)
- The prototype of the maraging blades has been manufactured.
- Small Type-C suspensions with mini-GAS.
R&D
- Development of a hybrid low-frequency vibration isolation system. Kakenhi (Kiban-B) has been approved.
- Modification of the Type-A tower toward O6.
Discussion
Next meeting
- 2026/4/10 10:00-
