Contents
VIS Meeting
Date: 2026/3/27 10:00-
Participants:
Topics
Type-A
- ACCs for the IP controls.
- TF measurements of the folded pendulum are necessary.
Type-B/Bp
Installation in SRM (Notion page)
- SG card box.
- One box was installed in the SRM rack.
- IP for Type-Bp.
- Started a design.
Type-C
Active isolation table for OMC. (Notion page)
- The prototype of the maraging blades has been manufactured.
- Small Type-C suspensions with mini-GAS.
R&D
- Development of a hybrid low-frequency vibration isolation system. Kakenhi (Kiban-B) has been approved.
- Modification of the Type-A tower toward O6.
Discussion
Next meeting
- 2026/4/10 10:00-
