Attachment 'KAGRAvi_minute_2012Aug22.txt'
Download 1 KAGRA vibration isolation meeting (22nd of August 2012)
2
3 Attendees: Takahashi, Uchiyama, Hennes, Yamamoto
4
5 Ryutaro: In the last week, the type B prototype arrived at Kashiwa.
6 At first, the intermediate mass and bottom filter were delivered. Next,
7 the recoil mass and so on were delivered.
8 We must order jigs and support sturctures to assemble the payload. He is
9 preparing
10 the order. The payload will be assmbled but not be connected to the pre
11 isolator
12 at first.
13
14 Eric: Nikhef people will visit Japan on the beginning of the October for
15 the ELiTES meeting.
16 Eric and other people would like to discuss and do something in Japan
17 before or
18 after meeting. Kentaro Somiya origanizes the plan. We can tell him some
19 ideas if we have.
Attached Files
To refer to attachments on a page, use attachment:filename, as shown below in the list of files. Do NOT use the URL of the [get] link, since this is subject to change and can break easily.You are not allowed to attach a file to this page.