Download 1 KAGRA vibration isolation meeting (29th of August 2012)
2
3 Attendees: DeSalvao, Takahashi, Majorana, Sekiguchi, Uchiyama
4
5 Riccardo: He stays in Scotland and, with Nicholas Lockerbie, optimized the
6 design of the OSEM
7 for the intermediate mass and finished it.
8 (Riccardo's commnet after meeting: Yesterday we found a problem with the new LED,
9 had to return to the old LED, we are redesigning the supports)
10
11 Nick would like to join KAGRA collaboration. Riccardo prepares the
12 application.
13 And they continue the optimization of the OSEM for the test mass.
14 Riccardo will also try the cryogenic test for the OSEM. Kazuhiro pointed
15 out that
16 the Si pin diode does not work at low temperauter but the InGaAs works.
17 (Riccardo' comment: Nick points out that PIN Si diodes only slow down
18 with temperature, due to lower
19 mobility of the front electro implanted ions, and may be still OK at 20 K, he will
20 test)
21 Riccardo visited Glasgow University. Now, they have a plan to
22 study the silicon breaking point.
23 Ryutaro asked whether Riccardo has the design of the circuit of the shadow
24 sensor.
25 Nick sent the design of the drive for the LED. The design for the readout
26 is the same as
27 that of LIGO.
28
29 Ettore:
30 He will arrive at Japan on the 29th of the Spetember and leave on the 14th
31 of the October.
32 On the 17th and 18th of the September, he will visit IMPEX and Moltech.
33 Kazuhiro will
34 send the list of questions before his visit and discuss it with Ettore.
35
36 Takanori: In order to attend the ELiTES thermal noise workshop, he stayed
37 at Jena
38 in Germany. While he stayed in Germany, the driver for the LVDT actutor
39 was delivered.
40 He checked it on this Monday. The power supply and (D-sub) connectors are
41 necessary.
42
43 Ettore: Did somebody test the amplifier of the Geophone ? Although Ryutaro
44 received it,
45 he did not check yet. Riccardo suggested that it is better to check before
46 Alessandro
47 will visit Japan.
48
49 Ryutaro submitted the application of Ettore to JSPS.
50 The application from Ettore is not necessary.
51
52 Ryutaro:
53 The payload prototype was delivered. But the jigs to assemble are
54 necessary and were ordered.
55