Line 1: Line 1:
||'''[[LCGT|PROJECT TOP]]''' ||[[LCGT/subgroup/analysis|GW Analysis]] ||[[LCGT/subgroup/ifo|Interferometer]] ||[[LCGT/subgroup/vacuum|Vacuum & Cryostat]] ||[[LCGT/subgroup/laser|Laser & Optics]] ||[[LCGT/subgroup/vis|Seismic Isolator]] ||[[LCGT/subgroup/infra|Infrastructure]] ||

## page was renamed from LCGT/subgroup/vis
Line 8: Line 6:
 . Member: T. Uchiyama(ICRR), R. De''''''Salvo(Univ. of Sannio), H. Ishizaki(NAOJ), A. Takamori(ERI), E. Majorana(INFN), T. Sekiguchi(ICRR), K. Yamamoto(ICRR)  . Member: T. Uchiyama(ICRR), R. DeSalvo(Univ. of Sannio), H. Ishizaki(NAOJ), A. Takamori(ERI), E. Majorana(INFN), T. Sekiguchi(ICRR), K. Yamamoto(ICRR)
Line 14: Line 12:
=== The ??th (5 September, 2012) ===
 . [[attachment:KAGRAvi_minute_2012Sep5|Minute]]

=== The ??th (29 September, 2012) ===
 . [[attachment:KAGRAvi_minute_2012Aug29.txt|Minute]]

=== The ??th (22 September, 2012) ===
 . [[attachment:KAGRAvi_minute_2012Aug22.txt|Minute]]

=== The ??th (15 September, 2012) ===
 . No meeting (summer vacation)

=== The ??th (8 September, 2012) ===
 . [[attachment:KAGRAvi_minute_2012Aug08.txt|Minute]]

=== The ??th (1 September, 2012) ===
 . [[attachment:KAGRAvi_minute_2012Aug01.txt|Minute]]

=== The 24th (28 September, 2011) ===
 . [[attachment:KAGRA/Subgroups/VIS/modal_0928.pdf|Modal Analysis of Tripod by Takanori]]

=== The 23th (15 September, 2011) ===
 . [[attachment:KAGRA/Subgroups/VIS/TypeB_sim_0915.pdf|Simulation on TypeB by Takanori]]

=== The 22th (7 September, 2011) ===
 . [[attachment:KAGRA/Subgroups/VIS/Type-B_system_rycy.pdf|Z-Assembly for RM by Riccardo]]
 . [[attachment:KAGRA/Subgroups/VIS/Type-B_system_bs.pdf|Z-Assembly for BS by Riccardo]]
 . [[attachment:KAGRA/Subgroups/VIS/TypeB_sim_0907.pdf|Simulation on TypeB by Takanori]]

=== The 21th (31 August, 2011) ===
=== The 20th (24 August, 2011) ===
=== The 19th (10 August, 2011) ===
=== The 18th (27 July, 2011) ===
 . [[attachment:KAGRA/Subgroups/VIS/PayloadB_0727.pdf|Design of Type-B payload by Riccardo]]

=== The 17th (20 July, 2011) ===
=== The 16th (13 July, 2011) ===
 . [[attachment:KAGRA/Subgroups/VIS/SR2-PR2_0711.pdf|SR2-PR2 recoil mass by Riccardo]]
 . [[attachment:KAGRA/Subgroups/VIS/angle_0713.pdf|Angular fluctuation of TM by Takanori]]

=== The 15th (6 July, 2011) ===
 . [[attachment:KAGRA/Subgroups/VIS/2type_0701.pdf|Type-B payload model by Sekiguchi]]

=== The 14th (29 June, 2011) ===
 . [[attachment:KAGRA/Subgroups/VIS/kapton_0627.pdf|Kapton Wire by Sekiguchi]]

=== The 13th (22 June, 2011) ===
 . [[http://tamago.mtk.nao.ac.jp/ishizaki/LCGT/kaptonwire/cable.pdf|Kapton Wire by Ishizaki]]

=== The 12th (15 June, 2011) ===
=== The 11th (8 June, 2011) ===
 . [[attachment:KAGRA/Subgroups/VIS/minute0608.pdf|Minute]]

=== The 10th (1 June, 2011) ===
 . [[attachment:KAGRA/Subgroups/VIS/damping0601.pdf|Mode damping study by Takanori]]
Line 15: Line 69:
Line 17: Line 70:
 . [[attachment:LCGT/subgroup/vis/magicwand.png|Magic wands by Takanori]]
 . [[attachment:LCGT/subgroup/vis/Check110512.pdf|Heavier test mass by Ettore and Takanori]]
 . [[attachment:KAGRA/Subgroups/VIS/magicwand.png|Magic wands by Takanori]]
 . [[attachment:KAGRA/Subgroups/VIS/Check110512.pdf|Heavier test mass by Ettore and Takanori]]
Line 21: Line 74:
 . [[attachment:LCGT/subgroup/vis/rep110511.pdf|Report by Takanori]]  . [[attachment:KAGRA/Subgroups/VIS/rep110511.pdf|Report by Takanori]]
Line 24: Line 77:
 . [[attachment:LCGT/subgroup/vis/dimension110427.docx|Payload dimensions by Riccardo]]  . [[attachment:KAGRA/Subgroups/VIS/dimension110427.docx|Payload dimensions by Riccardo]]
Line 27: Line 80:
 . [[attachment:LCGT/subgroup/vis/3D_model.pdf|Parameter Configuration by Ettore]]  . [[attachment:KAGRA/Subgroups/VIS/3D_model.pdf|Parameter Configuration by Ettore]]
Line 30: Line 83:
 . [[attachment:LCGT/subgroup/vis/LCGT_PAY_10-30.pdf|Parameter Configuration by Ettore]]  . [[attachment:KAGRA/Subgroups/VIS/LCGT_PAY_10-30.pdf|Parameter Configuration by Ettore]]
Line 33: Line 86:
 . [[attachment:LCGT/subgroup/vis/10-30_April06.docx|Simulation by Ettore]]
 . [[attachment:LCGT/subgroup/vis/sequence110406.pdf|Installation sequence by Riccardo]]
 . [[attachment:KAGRA/Subgroups/VIS/10-30_April06.docx|Simulation by Ettore]]
 . [[attachment:KAGRA/Subgroups/VIS/sequence110406.pdf|Installation sequence by Riccardo]]
Line 37: Line 90:
 . [[attachment:LCGT/subgroup/vis/coordinate110330.pdf|Coordinate system by Ryutaro]]
 . [[attachment:LCGT/subgroup/vis/110330_isasA.pdf|Simulation by Takanori]]
 . [[attachment:KAGRA/Subgroups/VIS/coordinate110330.pdf|Coordinate system by Ryutaro]]
 . [[attachment:KAGRA/Subgroups/VIS/110330_isasA.pdf|Simulation by Takanori]]
Line 41: Line 94:
 . [[attachment:LCGT/subgroup/vis/memo110323.txt|Comments by Riccardo]]
 . [[attachment:LCGT/subgroup/vis/report110323.doc|Status report by Riccardo]]
 . [[attachment:LCGT/subgroup/vis/sim110323.pptx|Simulation by Ettore]]
 . [[attachment:KAGRA/Subgroups/VIS/memo110323.txt|Comments by Riccardo]]
 . [[attachment:KAGRA/Subgroups/VIS/report110323.doc|Status report by Riccardo]]
 . [[attachment:KAGRA/Subgroups/VIS/sim110323.pptx|Simulation by Ettore]]
Line 46: Line 99:
 . [[attachment:LCGT/subgroup/vis/Tower-a.pdf|Design for Type-A system]]
 . [[attachment:LCGT/subgroup/vis/filter-chain.pdf|Detail of filter's chain]]
 . [[attachment:KAGRA/Subgroups/VIS/Tower-a.pdf|Design for Type-A system]]
 . [[attachment:KAGRA/Subgroups/VIS/filter-chain.pdf|Detail of filter's chain]]
Line 53: Line 106:
 . [[attachment:LCGT/subgroup/vis/Modeling6.ppt|Model vs. Measurement in TAMA-SAS]]
 . [[attachment:LCGT/subgroup/vis/chamber-AB.pdf|Design of Type-A,B chamber (rev.)]]
 . [[attachment:KAGRA/Subgroups/VIS/Modeling6.ppt|Model vs. Measurement in TAMA-SAS]]
 . [[attachment:KAGRA/Subgroups/VIS/chamber-AB.pdf|Design of Type-A,B chamber (rev.)]]
Line 57: Line 110:
 . 10月15日(木) 13:00-14:30 天文台大会議室 ([[attachment:LCGT/subgroup/vis/minutes5.pdf|議事録]])
 . [[attachment:LCGT/subgroup/vis/Modeling5.ppt|LCGT-SAS Modeling 5 (Type-B,C)]]
 . [[attachment:LCGT/subgroup/vis/chamber-A.pdf|Design of Type-A chamber]]
 . 10月15日(木) 13:00-14:30 天文台大会議室 ([[attachment:KAGRA/Subgroups/VIS/minutes5.pdf|議事録]])
 . [[attachment:KAGRA/Subgroups/VIS/Modeling5.ppt|LCGT-SAS Modeling 5 (Type-B,C)]]
 . [[attachment:KAGRA/Subgroups/VIS/chamber-A.pdf|Design of Type-A chamber]]
Line 62: Line 115:
 . 10月1日(木) 13:00-15:00 東京大学理学部1号館445号室 ([[attachment:LCGT/subgroup/vis/minutes-b.pdf|議事録]])
 . [[attachment:LCGT/subgroup/vis/brest.pdf|メモ]]
 . 10月1日(木) 13:00-15:00 東京大学理学部1号館445号室 ([[attachment:KAGRA/Subgroups/VIS/minutes-b.pdf|議事録]])
 . [[attachment:KAGRA/Subgroups/VIS/brest.pdf|メモ]]
Line 66: Line 119:
 . 9月3日(木) 15:00-16:30 天文台輪講室 ([[attachment:LCGT/subgroup/vis/minutes4.pdf|議事録]])
 . [[attachment:LCGT/subgroup/vis/Modeling3.ppt|LCGT-SAS Modeling 3 (Gain boost)]]
 . [[attachment:LCGT/subgroup/vis/Modeling4.pdf|LCGT-SAS Modeling 4 (Vertical, Pitch)]]
 . [[attachment:LCGT/subgroup/vis/ICDsas2.doc|ICD update]] ([[attachment:ICDsas2.pdf|PDF]])
 . 9月3日(木) 15:00-16:30 天文台輪講室 ([[attachment:KAGRA/Subgroups/VIS/minutes4.pdf|議事録]])
 . [[attachment:KAGRA/Subgroups/VIS/Modeling3.ppt|LCGT-SAS Modeling 3 (Gain boost)]]
 . [[attachment:KAGRA/Subgroups/VIS/Modeling4.pdf|LCGT-SAS Modeling 4 (Vertical, Pitch)]]
 . [[attachment:KAGRA/Subgroups/VIS/ICDsas2.doc|ICD update]] ([[attachment:ICDsas2.pdf|PDF]])
Line 72: Line 125:
 . 8月6日(木) 15:00-16:30 天文台輪講室 ([[attachment:LCGT/subgroup/vis/minutes3.pdf|議事録]])
 . [[attachment:LCGT/subgroup/vis/Modeling2.ppt|LCGT-SAS Modeling 2]]
 . [[attachment:LCGT/subgroup/vis/RandD2.pdf|低温懸架のR&Dについて]]
 . 8月6日(木) 15:00-16:30 天文台輪講室 ([[attachment:KAGRA/Subgroups/VIS/minutes3.pdf|議事録]])
 . [[attachment:KAGRA/Subgroups/VIS/Modeling2.ppt|LCGT-SAS Modeling 2]]
 . [[attachment:KAGRA/Subgroups/VIS/RandD2.pdf|低温懸架のR&Dについて]]
Line 77: Line 130:
 . 7月16日(木) 15:00-16:30 天文台輪講室 ([[attachment:LCGT/subgroup/vis/minutes2.pdf|議事録]])
 . [[attachment:LCGT/subgroup/vis/Modeling1.ppt|LCGT-SAS Modeling]]
 . [[attachment:LCGT/subgroup/vis/RandD.pdf|LCGT-SASのR&Dについて]]
 . 7月16日(木) 15:00-16:30 天文台輪講室 ([[attachment:KAGRA/Subgroups/VIS/minutes2.pdf|議事録]])
 . [[attachment:KAGRA/Subgroups/VIS/Modeling1.ppt|LCGT-SAS Modeling]]
 . [[attachment:KAGRA/Subgroups/VIS/RandD.pdf|LCGT-SASのR&Dについて]]
Line 82: Line 135:
 . 6月3日(水) 17:00-19:00 天文台輪講室 ([[attachment:LCGT/subgroup/vis/minutes1.pdf|議事録]])
 . [[attachment:LCGT/subgroup/vis/agenda1.pdf|作業班、スケジュール]]
 . [[attachment:LCGT/subgroup/vis/ICDsas.doc|ICD]] ([[attachment:ICDsas.pdf|PDF]])
 . [[attachment:LCGT/subgroup/vis/LCGT-SAS2.pdf|常温-低温接続部]]
 . 6月3日(水) 17:00-19:00 天文台輪講室 ([[attachment:KAGRA/Subgroups/VIS/minutes1.pdf|議事録]])
 . [[attachment:KAGRA/Subgroups/VIS/agenda1.pdf|作業班、スケジュール]]
 . [[attachment:KAGRA/Subgroups/VIS/ICDsas.doc|ICD]] ([[attachment:ICDsas.pdf|PDF]])
 . [[attachment:KAGRA/Subgroups/VIS/LCGT-SAS2.pdf|常温-低温接続部]]
Line 90: Line 143:
Line 92: Line 144:
 . [[attachment:LCGT/subgroup/vis/Report2009.ppt|Evaluation of TAMA-SAS for LCGT]]  . [[attachment:KAGRA/Subgroups/VIS/Report2009.ppt|Evaluation of TAMA-SAS for LCGT]]
Line 94: Line 146:
 . [[LCGT/subgroup/vis/tama_sas|Item list to be improved]]  . [[KAGRA/Subgroups/VIS/FEM/tama_sas|Item list to be improved]]
Line 104: Line 156:
 . Transfer function X0~X7/Xg --([[attachment:LCGT/subgroup/vis/model_trf.txt|(old)]])--
 . Modeling M-file --([[attachment:LCGT/subgroup/vis/model_mfile.zip|(2009/8/15)]])--[[attachment:LCGT/subgroup/vis/model_mfile2.zip|(2009/8/17)]]
 . Spectrum of displacement --([[attachment:LCGT/subgroup/vis/model_disp.zip|(2009/8/15)]])--[[attachment:LCGT/subgroup/vis/model_disp2.zip|(2009/8/17)]]
 . Transfer function X0~X7/Xg --([[attachment:KAGRA/Subgroups/VIS/model_trf.txt|(old)]])--
 . Modeling M-file --([[attachment:KAGRA/Subgroups/VIS/model_mfile.zip|(2009/8/15)]])--[[attachment:KAGRA/Subgroups/VIS/model_mfile2.zip|(2009/8/17)]]
 . Spectrum of displacement --([[attachment:KAGRA/Subgroups/VIS/model_disp.zip|(2009/8/15)]])--[[attachment:KAGRA/Subgroups/VIS/model_disp2.zip|(2009/8/17)]]
Line 109: Line 161:
 . [[LCGT/subgroup/vis/FEM|FEM Page]]  . [[KAGRA/Subgroups/VIS/FEM|FEM Page]]
Line 112: Line 164:
 . [[LCGT/subgroup/vis/Simulation|Simulation Page]]  . [[KAGRA/Subgroups/VIS/Simulation|Simulation Page]]

Vibration Isolation

  • Chief: R. Takahashi(ICRR)
  • Member: T. Uchiyama(ICRR), R. DeSalvo(Univ. of Sannio), H. Ishizaki(NAOJ), A. Takamori(ERI), E. Majorana(INFN), T. Sekiguchi(ICRR), K. Yamamoto(ICRR)


Weekly EVO Meeting

  • Every Wednesday, 21:00(JST)

The ??th (5 September, 2012)

The ??th (29 September, 2012)

The ??th (22 September, 2012)

The ??th (15 September, 2012)

  • No meeting (summer vacation)

The ??th (8 September, 2012)

The ??th (1 September, 2012)

The 24th (28 September, 2011)

The 23th (15 September, 2011)

The 22th (7 September, 2011)

The 21th (31 August, 2011)

The 20th (24 August, 2011)

The 19th (10 August, 2011)

The 18th (27 July, 2011)

The 17th (20 July, 2011)

The 16th (13 July, 2011)

The 15th (6 July, 2011)

The 14th (29 June, 2011)

The 13th (22 June, 2011)

The 12th (15 June, 2011)

The 11th (8 June, 2011)

The 10th (1 June, 2011)

The 9th (25 May, 2011)

The 8th (18 May, 2011)

The 7th (11 May, 2011)

The 6th (27 April, 2011)

The 5th (20 April, 2011)

(11 April, 2011)

The 4th (6 April, 2011)

The 3rd (30 March, 2011)

The 2nd (23 March, 2011)

The 1st (16 March, 2011)


LCGT防振系作業部会(2009)

第6回

第5回

ブレーンストーミング

  • 10月1日(木) 13:00-15:00 東京大学理学部1号館445号室 (議事録)

  • メモ

第4回

第3回

第2回

第1回


Archive

TAMA SAS

TAMA Double Pendulum

Seismic spectrum in Kamioka mine

LCGT-SAS model

Finite Element Analysis

Rigid-Body Models

KAGRA/Subgroups/VIS (last edited 2022-02-25 19:10:23 by HirotakaYuzurihara)