5744
Comment:
|
8026
|
Deletions are marked like this. | Additions are marked like this. |
Line 1: | Line 1: |
||'''[[LCGT|PROJECT TOP]]''' ||[[LCGT/subgroup/analysis|GW Analysis]] ||[[LCGT/subgroup/ifo|Interferometer]] ||[[LCGT/subgroup/vacuum|Vacuum & Cryostat]] ||[[LCGT/subgroup/laser|Laser & Optics]] ||[[LCGT/subgroup/vis|Seismic Isolator]] ||[[LCGT/subgroup/infra|Infrastructure]] || |
## page was renamed from LCGT/subgroup/vis |
Line 7: | Line 5: |
. Chief: R. Takahashi(ICRR) . Member: T. Uchiyama(ICRR), R. De''''''Salvo(Univ. of Sannio), H. Ishizaki(NAOJ), A. Takamori(ERI), E. Majorana(INFN), T. Sekiguchi(ICRR), K. Yamamoto(ICRR) |
. Chief: R. Takahashi(NAOJ) . Member: N. Ohishi, H. Ishizaki, F. E. Pena Arellano, M. Barton, N. Hirata, R. Flaminio, Y. Aso, T. Akutsu (NAOJ), T. Sekiguchi, K. Yamamoto, T. Uchiyama(ICRR), R. DeSalvo (Univ. of Sannio), E. Majorana(INFN Rome), J. van den Brand, E. Hennes, A. Bertolini, J. van Heijningen, K. Agatsuma (NIKHEF) ---- == NAOJ VI Meeting == . Every Wednesday, from 15:00 (JST) . [[KAGRA/Subgroups/VIS/MeetingNAOJ|Meeting Page]] ---- == Manual == . [[KAGRA/Subgroups/VIS/IstManual|Installation Manual]] . [[KAGRA/Subgroups/VIS/OpsManual|Operation Manual]] |
Line 12: | Line 22: |
. Every Wednesday, 21:00(JST) | . This meeting is suspende. === The 31th (12 September, 2012) === . [[attachment:KAGRAvi_minute_2012Sep12.txt|Minute]] === The 30th (5 September, 2012) === . [[attachment:KAGRAvi_minute_2012Sep05.txt|Minute]] === The 29th (29 August, 2012) === . [[attachment:KAGRAvi_minute_2012Aug29.txt|Minute]] === The 28th (22 August, 2012) === . [[attachment:KAGRAvi_minute_2012Aug22.txt|Minute]] === The 27th (15 August, 2012) === . No meeting (summer vacation) === The 26th (8 August, 2012) === . [[attachment:KAGRAvi_minute_2012Aug08.txt|Minute]] === The 25th (1 August, 2012) === . [[attachment:KAGRAvi_minute_2012Aug01.txt|Minute]] === The 24th (28 September, 2011) === . [[attachment:KAGRA/Subgroups/VIS/modal_0928.pdf|Modal Analysis of Tripod by Takanori]] === The 23th (15 September, 2011) === . [[attachment:KAGRA/Subgroups/VIS/TypeB_sim_0915.pdf|Simulation on TypeB by Takanori]] === The 22th (7 September, 2011) === . [[attachment:KAGRA/Subgroups/VIS/Type-B_system_rycy.pdf|Z-Assembly for RM by Riccardo]] . [[attachment:KAGRA/Subgroups/VIS/Type-B_system_bs.pdf|Z-Assembly for BS by Riccardo]] . [[attachment:KAGRA/Subgroups/VIS/TypeB_sim_0907.pdf|Simulation on TypeB by Takanori]] === The 21th (31 August, 2011) === === The 20th (24 August, 2011) === === The 19th (10 August, 2011) === === The 18th (27 July, 2011) === . [[attachment:KAGRA/Subgroups/VIS/PayloadB_0727.pdf|Design of Type-B payload by Riccardo]] === The 17th (20 July, 2011) === === The 16th (13 July, 2011) === . [[attachment:KAGRA/Subgroups/VIS/SR2-PR2_0711.pdf|SR2-PR2 recoil mass by Riccardo]] . [[attachment:KAGRA/Subgroups/VIS/angle_0713.pdf|Angular fluctuation of TM by Takanori]] === The 15th (6 July, 2011) === . [[attachment:KAGRA/Subgroups/VIS/2type_0701.pdf|Type-B payload model by Sekiguchi]] === The 14th (29 June, 2011) === . [[attachment:KAGRA/Subgroups/VIS/kapton_0627.pdf|Kapton Wire by Sekiguchi]] |
Line 15: | Line 74: |
. [[http://tamago.mtk.nao.ac.jp/ishizaki/LCGT/kaptonwire/cable.pdf|Kapton Wire by Ishizaki]] | |
Line 17: | Line 77: |
Line 19: | Line 78: |
. [[attachment:LCGT/subgroup/vis/minute0608.pdf|Minute]] | . [[attachment:KAGRA/Subgroups/VIS/minute0608.pdf|Minute]] |
Line 22: | Line 81: |
. [[attachment:LCGT/subgroup/vis/damping0601.pdf|Mode damping study by Takanori]] | . [[attachment:KAGRA/Subgroups/VIS/damping0601.pdf|Mode damping study by Takanori]] |
Line 25: | Line 84: |
Line 27: | Line 85: |
. [[attachment:LCGT/subgroup/vis/magicwand.png|Magic wands by Takanori]] . [[attachment:LCGT/subgroup/vis/Check110512.pdf|Heavier test mass by Ettore and Takanori]] |
. [[attachment:KAGRA/Subgroups/VIS/magicwand.png|Magic wands by Takanori]] . [[attachment:KAGRA/Subgroups/VIS/Check110512.pdf|Heavier test mass by Ettore and Takanori]] |
Line 31: | Line 89: |
. [[attachment:LCGT/subgroup/vis/rep110511.pdf|Report by Takanori]] | . [[attachment:KAGRA/Subgroups/VIS/rep110511.pdf|Report by Takanori]] |
Line 34: | Line 92: |
. [[attachment:LCGT/subgroup/vis/dimension110427.docx|Payload dimensions by Riccardo]] | . [[attachment:KAGRA/Subgroups/VIS/dimension110427.docx|Payload dimensions by Riccardo]] |
Line 37: | Line 95: |
. [[attachment:LCGT/subgroup/vis/3D_model.pdf|Parameter Configuration by Ettore]] | . [[attachment:KAGRA/Subgroups/VIS/3D_model.pdf|Parameter Configuration by Ettore]] |
Line 40: | Line 98: |
. [[attachment:LCGT/subgroup/vis/LCGT_PAY_10-30.pdf|Parameter Configuration by Ettore]] | . [[attachment:KAGRA/Subgroups/VIS/LCGT_PAY_10-30.pdf|Parameter Configuration by Ettore]] |
Line 43: | Line 101: |
. [[attachment:LCGT/subgroup/vis/10-30_April06.docx|Simulation by Ettore]] . [[attachment:LCGT/subgroup/vis/sequence110406.pdf|Installation sequence by Riccardo]] |
. [[attachment:KAGRA/Subgroups/VIS/10-30_April06.docx|Simulation by Ettore]] . [[attachment:KAGRA/Subgroups/VIS/sequence110406.pdf|Installation sequence by Riccardo]] |
Line 47: | Line 105: |
. [[attachment:LCGT/subgroup/vis/coordinate110330.pdf|Coordinate system by Ryutaro]] . [[attachment:LCGT/subgroup/vis/110330_isasA.pdf|Simulation by Takanori]] |
. [[attachment:KAGRA/Subgroups/VIS/coordinate110330.pdf|Coordinate system by Ryutaro]] . [[attachment:KAGRA/Subgroups/VIS/110330_isasA.pdf|Simulation by Takanori]] |
Line 51: | Line 109: |
. [[attachment:LCGT/subgroup/vis/memo110323.txt|Comments by Riccardo]] . [[attachment:LCGT/subgroup/vis/report110323.doc|Status report by Riccardo]] . [[attachment:LCGT/subgroup/vis/sim110323.pptx|Simulation by Ettore]] |
. [[attachment:KAGRA/Subgroups/VIS/memo110323.txt|Comments by Riccardo]] . [[attachment:KAGRA/Subgroups/VIS/report110323.doc|Status report by Riccardo]] . [[attachment:KAGRA/Subgroups/VIS/sim110323.pptx|Simulation by Ettore]] |
Line 56: | Line 114: |
. [[attachment:LCGT/subgroup/vis/Tower-a.pdf|Design for Type-A system]] . [[attachment:LCGT/subgroup/vis/filter-chain.pdf|Detail of filter's chain]] |
. [[attachment:KAGRA/Subgroups/VIS/Tower-a.pdf|Design for Type-A system]] . [[attachment:KAGRA/Subgroups/VIS/filter-chain.pdf|Detail of filter's chain]] |
Line 63: | Line 121: |
. [[attachment:LCGT/subgroup/vis/Modeling6.ppt|Model vs. Measurement in TAMA-SAS]] . [[attachment:LCGT/subgroup/vis/chamber-AB.pdf|Design of Type-A,B chamber (rev.)]] |
. [[attachment:KAGRA/Subgroups/VIS/Modeling6.ppt|Model vs. Measurement in TAMA-SAS]] . [[attachment:KAGRA/Subgroups/VIS/chamber-AB.pdf|Design of Type-A,B chamber (rev.)]] |
Line 67: | Line 125: |
. 10月15日(木) 13:00-14:30 天文台大会議室 ([[attachment:LCGT/subgroup/vis/minutes5.pdf|議事録]]) . [[attachment:LCGT/subgroup/vis/Modeling5.ppt|LCGT-SAS Modeling 5 (Type-B,C)]] . [[attachment:LCGT/subgroup/vis/chamber-A.pdf|Design of Type-A chamber]] |
. 10月15日(木) 13:00-14:30 天文台大会議室 ([[attachment:KAGRA/Subgroups/VIS/minutes5.pdf|議事録]]) . [[attachment:KAGRA/Subgroups/VIS/Modeling5.ppt|LCGT-SAS Modeling 5 (Type-B,C)]] . [[attachment:KAGRA/Subgroups/VIS/chamber-A.pdf|Design of Type-A chamber]] |
Line 72: | Line 130: |
. 10月1日(木) 13:00-15:00 東京大学理学部1号館445号室 ([[attachment:LCGT/subgroup/vis/minutes-b.pdf|議事録]]) . [[attachment:LCGT/subgroup/vis/brest.pdf|メモ]] |
. 10月1日(木) 13:00-15:00 東京大学理学部1号館445号室 ([[attachment:KAGRA/Subgroups/VIS/minutes-b.pdf|議事録]]) . [[attachment:KAGRA/Subgroups/VIS/brest.pdf|メモ]] |
Line 76: | Line 134: |
. 9月3日(木) 15:00-16:30 天文台輪講室 ([[attachment:LCGT/subgroup/vis/minutes4.pdf|議事録]]) . [[attachment:LCGT/subgroup/vis/Modeling3.ppt|LCGT-SAS Modeling 3 (Gain boost)]] . [[attachment:LCGT/subgroup/vis/Modeling4.pdf|LCGT-SAS Modeling 4 (Vertical, Pitch)]] . [[attachment:LCGT/subgroup/vis/ICDsas2.doc|ICD update]] ([[attachment:ICDsas2.pdf|PDF]]) |
. 9月3日(木) 15:00-16:30 天文台輪講室 ([[attachment:KAGRA/Subgroups/VIS/minutes4.pdf|議事録]]) . [[attachment:KAGRA/Subgroups/VIS/Modeling3.ppt|LCGT-SAS Modeling 3 (Gain boost)]] . [[attachment:KAGRA/Subgroups/VIS/Modeling4.pdf|LCGT-SAS Modeling 4 (Vertical, Pitch)]] . [[attachment:KAGRA/Subgroups/VIS/ICDsas2.doc|ICD update]] ([[attachment:ICDsas2.pdf|PDF]]) |
Line 82: | Line 140: |
. 8月6日(木) 15:00-16:30 天文台輪講室 ([[attachment:LCGT/subgroup/vis/minutes3.pdf|議事録]]) . [[attachment:LCGT/subgroup/vis/Modeling2.ppt|LCGT-SAS Modeling 2]] . [[attachment:LCGT/subgroup/vis/RandD2.pdf|低温懸架のR&Dについて]] |
. 8月6日(木) 15:00-16:30 天文台輪講室 ([[attachment:KAGRA/Subgroups/VIS/minutes3.pdf|議事録]]) . [[attachment:KAGRA/Subgroups/VIS/Modeling2.ppt|LCGT-SAS Modeling 2]] . [[attachment:KAGRA/Subgroups/VIS/RandD2.pdf|低温懸架のR&Dについて]] |
Line 87: | Line 145: |
. 7月16日(木) 15:00-16:30 天文台輪講室 ([[attachment:LCGT/subgroup/vis/minutes2.pdf|議事録]]) . [[attachment:LCGT/subgroup/vis/Modeling1.ppt|LCGT-SAS Modeling]] . [[attachment:LCGT/subgroup/vis/RandD.pdf|LCGT-SASのR&Dについて]] |
. 7月16日(木) 15:00-16:30 天文台輪講室 ([[attachment:KAGRA/Subgroups/VIS/minutes2.pdf|議事録]]) . [[attachment:KAGRA/Subgroups/VIS/Modeling1.ppt|LCGT-SAS Modeling]] . [[attachment:KAGRA/Subgroups/VIS/RandD.pdf|LCGT-SASのR&Dについて]] |
Line 92: | Line 150: |
. 6月3日(水) 17:00-19:00 天文台輪講室 ([[attachment:LCGT/subgroup/vis/minutes1.pdf|議事録]]) . [[attachment:LCGT/subgroup/vis/agenda1.pdf|作業班、スケジュール]] . [[attachment:LCGT/subgroup/vis/ICDsas.doc|ICD]] ([[attachment:ICDsas.pdf|PDF]]) . [[attachment:LCGT/subgroup/vis/LCGT-SAS2.pdf|常温-低温接続部]] |
. 6月3日(水) 17:00-19:00 天文台輪講室 ([[attachment:KAGRA/Subgroups/VIS/minutes1.pdf|議事録]]) . [[attachment:KAGRA/Subgroups/VIS/agenda1.pdf|作業班、スケジュール]] . [[attachment:KAGRA/Subgroups/VIS/ICDsas.doc|ICD]] ([[attachment:ICDsas.pdf|PDF]]) . [[attachment:KAGRA/Subgroups/VIS/LCGT-SAS2.pdf|常温-低温接続部]] |
Line 100: | Line 158: |
Line 102: | Line 159: |
. [[attachment:LCGT/subgroup/vis/Report2009.ppt|Evaluation of TAMA-SAS for LCGT]] | . [[attachment:KAGRA/Subgroups/VIS/Report2009.ppt|Evaluation of TAMA-SAS for LCGT]] |
Line 104: | Line 161: |
. [[LCGT/subgroup/vis/tama_sas|Item list to be improved]] | . [[KAGRA/Subgroups/VIS/FEM/tama_sas|Item list to be improved]] |
Line 114: | Line 171: |
. Transfer function X0~X7/Xg --([[attachment:LCGT/subgroup/vis/model_trf.txt|(old)]])-- . Modeling M-file --([[attachment:LCGT/subgroup/vis/model_mfile.zip|(2009/8/15)]])--[[attachment:LCGT/subgroup/vis/model_mfile2.zip|(2009/8/17)]] . Spectrum of displacement --([[attachment:LCGT/subgroup/vis/model_disp.zip|(2009/8/15)]])--[[attachment:LCGT/subgroup/vis/model_disp2.zip|(2009/8/17)]] |
. Transfer function X0~X7/Xg --([[attachment:KAGRA/Subgroups/VIS/model_trf.txt|(old)]])-- . Modeling M-file --([[attachment:KAGRA/Subgroups/VIS/model_mfile.zip|(2009/8/15)]])--[[attachment:KAGRA/Subgroups/VIS/model_mfile2.zip|(2009/8/17)]] . Spectrum of displacement --([[attachment:KAGRA/Subgroups/VIS/model_disp.zip|(2009/8/15)]])--[[attachment:KAGRA/Subgroups/VIS/model_disp2.zip|(2009/8/17)]] |
Line 119: | Line 176: |
. [[LCGT/subgroup/vis/FEM|FEM Page]] | . [[KAGRA/Subgroups/VIS/FEM|FEM Page]] |
Line 122: | Line 179: |
. [[LCGT/subgroup/vis/Simulation|Simulation Page]] | . [[KAGRA/Subgroups/VIS/Simulation|Simulation Page]] |
Contents
- Vibration Isolation
- NAOJ VI Meeting
- Manual
-
Weekly EVO Meeting
- The 31th (12 September, 2012)
- The 30th (5 September, 2012)
- The 29th (29 August, 2012)
- The 28th (22 August, 2012)
- The 27th (15 August, 2012)
- The 26th (8 August, 2012)
- The 25th (1 August, 2012)
- The 24th (28 September, 2011)
- The 23th (15 September, 2011)
- The 22th (7 September, 2011)
- The 21th (31 August, 2011)
- The 20th (24 August, 2011)
- The 19th (10 August, 2011)
- The 18th (27 July, 2011)
- The 17th (20 July, 2011)
- The 16th (13 July, 2011)
- The 15th (6 July, 2011)
- The 14th (29 June, 2011)
- The 13th (22 June, 2011)
- The 12th (15 June, 2011)
- The 11th (8 June, 2011)
- The 10th (1 June, 2011)
- The 9th (25 May, 2011)
- The 8th (18 May, 2011)
- The 7th (11 May, 2011)
- The 6th (27 April, 2011)
- The 5th (20 April, 2011)
- (11 April, 2011)
- The 4th (6 April, 2011)
- The 3rd (30 March, 2011)
- The 2nd (23 March, 2011)
- The 1st (16 March, 2011)
- LCGT防振系作業部会(2009)
- Archive
Vibration Isolation
- Chief: R. Takahashi(NAOJ)
- Member: N. Ohishi, H. Ishizaki, F. E. Pena Arellano, M. Barton, N. Hirata, R. Flaminio, Y. Aso, T. Akutsu (NAOJ),
T. Sekiguchi, K. Yamamoto, T. Uchiyama(ICRR), R. DeSalvo (Univ. of Sannio), E. Majorana(INFN Rome), J. van den Brand, E. Hennes, A. Bertolini, J. van Heijningen, K. Agatsuma (NIKHEF)
NAOJ VI Meeting
- Every Wednesday, from 15:00 (JST)
Manual
Weekly EVO Meeting
- This meeting is suspende.
The 31th (12 September, 2012)
The 30th (5 September, 2012)
The 29th (29 August, 2012)
The 28th (22 August, 2012)
The 27th (15 August, 2012)
- No meeting (summer vacation)
The 26th (8 August, 2012)
The 25th (1 August, 2012)
The 24th (28 September, 2011)
The 23th (15 September, 2011)
The 22th (7 September, 2011)
The 21th (31 August, 2011)
The 20th (24 August, 2011)
The 19th (10 August, 2011)
The 18th (27 July, 2011)
The 17th (20 July, 2011)
The 16th (13 July, 2011)
The 15th (6 July, 2011)
The 14th (29 June, 2011)
The 13th (22 June, 2011)
The 12th (15 June, 2011)
The 11th (8 June, 2011)
The 10th (1 June, 2011)
The 9th (25 May, 2011)
The 8th (18 May, 2011)
The 7th (11 May, 2011)
The 6th (27 April, 2011)
The 5th (20 April, 2011)
(11 April, 2011)
The 4th (6 April, 2011)
The 3rd (30 March, 2011)
The 2nd (23 March, 2011)
The 1st (16 March, 2011)
LCGT防振系作業部会(2009)
第6回
- 11月12日(木) 15:00-16:30 天文台輪講室
第5回
10月15日(木) 13:00-14:30 天文台大会議室 (議事録)
ブレーンストーミング
第4回
9月3日(木) 15:00-16:30 天文台輪講室 (議事録)
第3回
8月6日(木) 15:00-16:30 天文台輪講室 (議事録)
第2回
7月16日(木) 15:00-16:30 天文台輪講室 (議事録)
第1回
6月3日(水) 17:00-19:00 天文台輪講室 (議事録)
R&Dについて (次回)
Archive
TAMA SAS
TAMA Double Pendulum
Seismic spectrum in Kamioka mine
In loud day (This data should be used as nominal ground motion in Kamioka)
LCGT-SAS model
Transfer function X0~X7/Xg (old)
Modeling M-file (2009/8/15)(2009/8/17)
Spectrum of displacement (2009/8/15)(2009/8/17)
Finite Element Analysis