Differences between revisions 140 and 165 (spanning 25 versions)
Revision 140 as of 2012-06-06 17:48:22
Size: 7008
Comment:
Revision 165 as of 2015-07-29 17:56:29
Size: 8244
Editor: AyakaShoda
Comment:
Deletions are marked like this. Additions are marked like this.
Line 2: Line 2:
Line 6: Line 5:
 . Chief: R. Takahashi(ICRR)
 . Member: T. Uchiyama(ICRR), R. De''''''Salvo(Univ. of Sannio), H. Ishizaki(NAOJ), A. Takamori(ERI), E. Majorana(INFN), T. Sekiguchi(ICRR), K. Yamamoto(ICRR)
 . Chief: R. Takahashi (NAOJ)
 . Member: N. Ohishi, H. Ishizaki, F. E. Pena Arellano, M. Barton, N. Hirata, R. Flaminio, Y. Aso, T. Akutsu (NAOJ),
 T. Sekiguchi, K. Yamamoto, T. Uchiyama (ICRR), R. DeSalvo (Univ. of Sannio), E. Majorana (INFN Rome), J. van den Brand, E. Hennes, A. Bertolini, J. van Heijningen, K. Agatsuma (NIKHEF)

----
== NAOJ VI Meeting ==
 . Every Wednesday, from 15:00 (JST)
 . [[KAGRA/Subgroups/VIS/MeetingNAOJ|Meeting Page]]

----
== Design ==

[[KAGRA/Subgroups/VIS/TypeA|Type-A]]

Type-B

[[KAGRA/Subgroups/VIS/TypeBp|Type-Bp]]

Type-C

[[KAGRA/Subgroups/VIS/Payload|Payload]]

iKAGRA TM

----
== Installation ==

 . [[KAGRA/Subgroups/VIS/IstManual|Installation Procedure]]

----
== Operation ==

 . [[KAGRA/Subgroups/VIS/OpsManual|Operation Manual]]
Line 11: Line 41:
 . Every Wednesday, 21:00(JST)  . This meeting is suspended.

=== The 31th (12 September, 2012) ===
 . [[attachment:KAGRAvi_minute_2012Sep12.txt|Minute]]

=== The 30th (5 September, 2012) ===
 . [[attachment:KAGRAvi_minute_2012Sep05.txt|Minute]]

=== The 29th (29 August, 2012) ===
 . [[attachment:KAGRAvi_minute_2012Aug29.txt|Minute]]

=== The 28th (22 August, 2012) ===
 . [[attachment:KAGRAvi_minute_2012Aug22.txt|Minute]]

=== The 27th (15 August, 2012) ===
 . No meeting (summer vacation)

=== The 26th (8 August, 2012) ===
 . [[attachment:KAGRAvi_minute_2012Aug08.txt|Minute]]

=== The 25th (1 August, 2012) ===
 . [[attachment:KAGRAvi_minute_2012Aug01.txt|Minute]]
Line 25: Line 76:
Line 27: Line 77:
Line 29: Line 78:
Line 34: Line 82:
Line 49: Line 96:
Line 57: Line 103:
Line 132: Line 177:

Vibration Isolation

  • Chief: R. Takahashi (NAOJ)
  • Member: N. Ohishi, H. Ishizaki, F. E. Pena Arellano, M. Barton, N. Hirata, R. Flaminio, Y. Aso, T. Akutsu (NAOJ),

    T. Sekiguchi, K. Yamamoto, T. Uchiyama (ICRR), R. DeSalvo (Univ. of Sannio), E. Majorana (INFN Rome), J. van den Brand, E. Hennes, A. Bertolini, J. van Heijningen, K. Agatsuma (NIKHEF)


NAOJ VI Meeting


Design

Type-A

Type-B

Type-Bp

Type-C

Payload

iKAGRA TM


Installation


Operation


Weekly EVO Meeting

  • This meeting is suspended.

The 31th (12 September, 2012)

The 30th (5 September, 2012)

The 29th (29 August, 2012)

The 28th (22 August, 2012)

The 27th (15 August, 2012)

  • No meeting (summer vacation)

The 26th (8 August, 2012)

The 25th (1 August, 2012)

The 24th (28 September, 2011)

The 23th (15 September, 2011)

The 22th (7 September, 2011)

The 21th (31 August, 2011)

The 20th (24 August, 2011)

The 19th (10 August, 2011)

The 18th (27 July, 2011)

The 17th (20 July, 2011)

The 16th (13 July, 2011)

The 15th (6 July, 2011)

The 14th (29 June, 2011)

The 13th (22 June, 2011)

The 12th (15 June, 2011)

The 11th (8 June, 2011)

The 10th (1 June, 2011)

The 9th (25 May, 2011)

The 8th (18 May, 2011)

The 7th (11 May, 2011)

The 6th (27 April, 2011)

The 5th (20 April, 2011)

(11 April, 2011)

The 4th (6 April, 2011)

The 3rd (30 March, 2011)

The 2nd (23 March, 2011)

The 1st (16 March, 2011)


LCGT防振系作業部会(2009)

第6回

第5回

ブレーンストーミング

  • 10月1日(木) 13:00-15:00 東京大学理学部1号館445号室 (議事録)

  • メモ

第4回

第3回

第2回

第1回


Archive

TAMA SAS

TAMA Double Pendulum

Seismic spectrum in Kamioka mine

LCGT-SAS model

Finite Element Analysis

Rigid-Body Models

KAGRA/Subgroups/VIS (last edited 2022-02-25 19:10:23 by HirotakaYuzurihara)