Differences between revisions 148 and 153 (spanning 5 versions)
Revision 148 as of 2012-09-27 12:24:56
Size: 7512
Comment:
Revision 153 as of 2012-09-27 13:15:31
Size: 7677
Comment:
Deletions are marked like this. Additions are marked like this.
Line 12: Line 12:
=== The ??th (19 September, 2012) ===
 . No meeting

=== The ??th (12 September, 2012) ===
 . [[attachment:KAGRAvi_minute_2012Sep12.txt|Minute]]
Line 13: Line 19:
 . [[attachment:KAGRAvi_minute_2012Sep5|Minute]]  . [[attachment:KAGRAvi_minute_2012Sep05.txt|Minute]]
Line 15: Line 21:
=== The ??th (29 September, 2012) ===
 . [[attachment:KAGRAvi_minute_2012Sep5|Minute]]
=== The ??th (29 August, 2012) ===
 . [[attachment:KAGRAvi_minute_2012Aug29.txt|Minute]]
Line 18: Line 24:
=== The ??th (22 September, 2012) ===
 . [[attachment:KAGRAvi_minute_2012Sep5|Minute]]
=== The ??th (22 August, 2012) ===
 . [[attachment:KAGRAvi_minute_2012Aug22.txt|Minute]]
Line 21: Line 27:
=== The ??th (15 September, 2012) === === The ??th (15 August, 2012) ===
Line 24: Line 30:
=== The ??th (8 September, 2012) ===
 . [[attachment:KAGRAvi_minute_2012Sep5|Minute]]
=== The ??th (8 August, 2012) ===
 . [[attachment:KAGRAvi_minute_2012Aug08.txt|Minute]]
Line 28: Line 34:
 . [[attachment:KAGRAvi_minute_2012Sep5|Minute]]  . [[attachment:KAGRAvi_minute_2012Aug01.txt|Minute]]

Vibration Isolation

  • Chief: R. Takahashi(ICRR)
  • Member: T. Uchiyama(ICRR), R. DeSalvo(Univ. of Sannio), H. Ishizaki(NAOJ), A. Takamori(ERI), E. Majorana(INFN), T. Sekiguchi(ICRR), K. Yamamoto(ICRR)


Weekly EVO Meeting

  • Every Wednesday, 21:00(JST)

The ??th (19 September, 2012)

  • No meeting

The ??th (12 September, 2012)

The ??th (5 September, 2012)

The ??th (29 August, 2012)

The ??th (22 August, 2012)

The ??th (15 August, 2012)

  • No meeting (summer vacation)

The ??th (8 August, 2012)

The ??th (1 September, 2012)

The 24th (28 September, 2011)

The 23th (15 September, 2011)

The 22th (7 September, 2011)

The 21th (31 August, 2011)

The 20th (24 August, 2011)

The 19th (10 August, 2011)

The 18th (27 July, 2011)

The 17th (20 July, 2011)

The 16th (13 July, 2011)

The 15th (6 July, 2011)

The 14th (29 June, 2011)

The 13th (22 June, 2011)

The 12th (15 June, 2011)

The 11th (8 June, 2011)

The 10th (1 June, 2011)

The 9th (25 May, 2011)

The 8th (18 May, 2011)

The 7th (11 May, 2011)

The 6th (27 April, 2011)

The 5th (20 April, 2011)

(11 April, 2011)

The 4th (6 April, 2011)

The 3rd (30 March, 2011)

The 2nd (23 March, 2011)

The 1st (16 March, 2011)


LCGT防振系作業部会(2009)

第6回

第5回

ブレーンストーミング

  • 10月1日(木) 13:00-15:00 東京大学理学部1号館445号室 (議事録)

  • メモ

第4回

第3回

第2回

第1回


Archive

TAMA SAS

TAMA Double Pendulum

Seismic spectrum in Kamioka mine

LCGT-SAS model

Finite Element Analysis

Rigid-Body Models

KAGRA/Subgroups/VIS (last edited 2022-02-25 19:10:23 by HirotakaYuzurihara)