Differences between revisions 15 and 27 (spanning 12 versions)
Revision 15 as of 2009-06-07 23:48:24
Size: 778
Editor: whitehole
Comment:
Revision 27 as of 2009-07-15 15:38:50
Size: 1144
Comment:
Deletions are marked like this. Additions are marked like this.
Line 7: Line 7:
 常温防振+ヒートリンク+低温懸架
Line 12: Line 14:
=== 第2回LCGT防振系作業部会 ===

 7月16日(水) 15:00-16:30 天文台輪講室
Line 16: Line 22:
 [[attachment:LCGT/subgroup/vis/agenda1.pdf|作業班、スケジュール]]  [[attachment:LCGT/subgroup/vis/agenda1.pdf|作業班、スケジュール]]
Line 18: Line 24:
 [[attachment:LCGT/subgroup/vis/ICDsas.doc|ICD]]  [[attachment:LCGT/subgroup/vis/ICDsas.doc|ICD]] ([[attachment:ICDsas.pdf|PDF]])
Line 20: Line 26:
 [[attachment:LCGT/subgroup/vis/LCGT-SAS2.pdf|常温-低温接続部]]  [[attachment:LCGT/subgroup/vis/LCGT-SAS2.pdf|常温-低温接続部]]
Line 22: Line 28:
 ・R&Dについて  R&Dについて
=== TAMA SAS の問題点 ===
 . [[LCGT/subgroup/vis/tama_sas|Item list to be improved]]

=== TAMA Double Pendulum の問題点 ===
 . [[LCGT/subgroup/vis/tama_double|Item list to be improved]]

PROJECT TOP

GW Analysis

Interferometer

Vacuum & Cryostat

Laser & Optics

Seismic Isolator

Infrastructure

防振系

  • 常温防振+ヒートリンク+低温懸架

    リーダー: 高橋竜太郎 (NAOJ)
    サブリーダー: 内山隆 (ICRR)、三代木伸二 (ICRR)

第2回LCGT防振系作業部会

  • 7月16日(水) 15:00-16:30 天文台輪講室

第1回LCGT防振系作業部会

TAMA SAS の問題点

TAMA Double Pendulum の問題点

KAGRA/Subgroups/VIS (last edited 2022-02-25 19:10:23 by HirotakaYuzurihara)