Differences between revisions 156 and 161 (spanning 5 versions)
Revision 156 as of 2014-10-24 10:35:06
Size: 7931
Comment:
Revision 161 as of 2015-07-13 05:27:12
Size: 8138
Editor: YoichiAso
Comment:
Deletions are marked like this. Additions are marked like this.
Line 5: Line 5:
 . Chief: R. Takahashi(ICRR)
 . Member: T. Uchiyama(ICRR), R. DeSalvo(Univ. of Sannio), H. Ishizaki(NAOJ), A. Takamori(ERI), E. Majorana(INFN), T. Sekiguchi(ICRR), K. Yamamoto(ICRR)
 . Chief: R. Takahashi (NAOJ)
 . Member: N. Ohishi, H. Ishizaki, F. E. Pena Arellano, M. Barton, N. Hirata, R. Flaminio, Y. Aso, T. Akutsu (NAOJ),
 T. Sekiguchi, K. Yamamoto, T. Uchiyama (ICRR), R. DeSalvo (Univ. of Sannio), E. Majorana (INFN Rome), J. van den Brand, E. Hennes, A. Bertolini, J. van Heijningen, K. Agatsuma (NIKHEF)
Line 14: Line 15:
== Manual ==
 . [[KAGRA/Subgroups/VIS/IstManual|Installation Manual]]
== Design ==

Type-A

Type-B

Type-Bp

Type-C

iKAGRA TM

---
== Installation ==

 . [[KAGRA/Subgroups/VIS/IstManual|Installation Procedure]]

---
== Operation ==
Line 20: Line 39:
 . Every Wednesday, 21:00(JST)  . This meeting is suspended.
Line 22: Line 41:
=== The ??th (19 September, 2012) ===
 . No meeting

=== The ??
th (12 September, 2012) ===
=== The 31th (12 September, 2012) ===
Line 28: Line 44:
=== The ??th (5 September, 2012) === === The 30th (5 September, 2012) ===
Line 31: Line 47:
=== The ??th (29 August, 2012) === === The 29th (29 August, 2012) ===
Line 34: Line 50:
=== The ??th (22 August, 2012) === === The 28th (22 August, 2012) ===
Line 37: Line 53:
=== The ??th (15 August, 2012) === === The 27th (15 August, 2012) ===
Line 40: Line 56:
=== The ??th (8 August, 2012) === === The 26th (8 August, 2012) ===
Line 43: Line 59:
=== The ??th (1 August, 2012) === === The 25th (1 August, 2012) ===

Vibration Isolation

  • Chief: R. Takahashi (NAOJ)
  • Member: N. Ohishi, H. Ishizaki, F. E. Pena Arellano, M. Barton, N. Hirata, R. Flaminio, Y. Aso, T. Akutsu (NAOJ),

    T. Sekiguchi, K. Yamamoto, T. Uchiyama (ICRR), R. DeSalvo (Univ. of Sannio), E. Majorana (INFN Rome), J. van den Brand, E. Hennes, A. Bertolini, J. van Heijningen, K. Agatsuma (NIKHEF)


NAOJ VI Meeting


Design

Type-A

Type-B

Type-Bp

Type-C

iKAGRA TM

---

Installation

---

Operation


Weekly EVO Meeting

  • This meeting is suspended.

The 31th (12 September, 2012)

The 30th (5 September, 2012)

The 29th (29 August, 2012)

The 28th (22 August, 2012)

The 27th (15 August, 2012)

  • No meeting (summer vacation)

The 26th (8 August, 2012)

The 25th (1 August, 2012)

The 24th (28 September, 2011)

The 23th (15 September, 2011)

The 22th (7 September, 2011)

The 21th (31 August, 2011)

The 20th (24 August, 2011)

The 19th (10 August, 2011)

The 18th (27 July, 2011)

The 17th (20 July, 2011)

The 16th (13 July, 2011)

The 15th (6 July, 2011)

The 14th (29 June, 2011)

The 13th (22 June, 2011)

The 12th (15 June, 2011)

The 11th (8 June, 2011)

The 10th (1 June, 2011)

The 9th (25 May, 2011)

The 8th (18 May, 2011)

The 7th (11 May, 2011)

The 6th (27 April, 2011)

The 5th (20 April, 2011)

(11 April, 2011)

The 4th (6 April, 2011)

The 3rd (30 March, 2011)

The 2nd (23 March, 2011)

The 1st (16 March, 2011)


LCGT防振系作業部会(2009)

第6回

第5回

ブレーンストーミング

  • 10月1日(木) 13:00-15:00 東京大学理学部1号館445号室 (議事録)

  • メモ

第4回

第3回

第2回

第1回


Archive

TAMA SAS

TAMA Double Pendulum

Seismic spectrum in Kamioka mine

LCGT-SAS model

Finite Element Analysis

Rigid-Body Models

KAGRA/Subgroups/VIS (last edited 2022-02-25 19:10:23 by HirotakaYuzurihara)