Differences between revisions 169 and 173 (spanning 4 versions)
Revision 169 as of 2015-11-02 05:36:32
Size: 1103
Editor: YoichiAso
Comment:
Revision 173 as of 2016-02-29 13:30:21
Size: 1220
Editor: NaokoOhishi
Comment:
Deletions are marked like this. Additions are marked like this.
Line 18: Line 18:
Type-B [[KAGRA/Subgroups/VIS/TypeB|Type-B]]
Line 22: Line 22:
Type-C [[KAGRA/Subgroups/VIS/Type-C|Type-C]]
Line 25: Line 25:

iKAGRA TM
Line 33: Line 31:
 . [[KAGRA/Subgroups/VIS/iKAGRAbKAGRA|Tasks from iKAGRA to bKAGRA]]

Vibration Isolation

  • Chief: R. Takahashi (NAOJ)
  • Member: N. Ohishi, H. Ishizaki, F. E. Pena Arellano, M. Barton, N. Hirata, R. Flaminio, Y. Aso, T. Akutsu (NAOJ),

    T. Sekiguchi, K. Yamamoto, T. Uchiyama (ICRR), R. DeSalvo (Univ. of Sannio), E. Majorana (INFN Rome), J. van den Brand, E. Hennes, A. Bertolini, J. van Heijningen, K. Agatsuma (NIKHEF)


VIS Meeting


Design

Type-A

Type-B

Type-Bp

Type-C

Payload


Installation


Operation


Old Weekly EVO Meeting

  • This meeting is suspended.

Past minutes

KAGRA/Subgroups/VIS (last edited 2022-02-25 19:10:23 by HirotakaYuzurihara)