Differences between revisions 17 and 23 (spanning 6 versions)
Revision 17 as of 2009-06-08 02:00:20
Size: 810
Editor: whitehole
Comment:
Revision 23 as of 2009-06-08 03:24:58
Size: 886
Editor: whitehole
Comment:
Deletions are marked like this. Additions are marked like this.
Line 12: Line 12:
=== TAMA SAS の問題点 ===
 . [[LCGT/subgroup/vis/tama_sas|List to be improved]]
Line 16: Line 19:
 [[attachment:LCGT/subgroup/vis/agenda1.pdf|作業班、スケジュール]]  [[attachment:LCGT/subgroup/vis/agenda1.pdf|作業班、スケジュール]]
Line 18: Line 21:
 [[attachment:LCGT/subgroup/vis/ICDsas.doc|ICD]] ([[attachment:ICDsas.pdf|PDF]])  [[attachment:LCGT/subgroup/vis/ICDsas.doc|ICD]] ([[attachment:ICDsas.pdf|PDF]])
Line 20: Line 23:
 [[attachment:LCGT/subgroup/vis/LCGT-SAS2.pdf|常温-低温接続部]]  [[attachment:LCGT/subgroup/vis/LCGT-SAS2.pdf|常温-低温接続部]]
Line 22: Line 25:
 R&Dについて  R&Dについて

PROJECT TOP

GW Analysis

Interferometer

Vacuum & Cryostat

Laser & Optics

Seismic Isolator

Infrastructure

防振系

  • リーダー: 高橋竜太郎 (NAOJ)
    サブリーダー: 内山隆 (ICRR)、三代木伸二 (ICRR)

TAMA SAS の問題点

第1回LCGT防振系作業部会

KAGRA/Subgroups/VIS (last edited 2022-02-25 19:10:23 by HirotakaYuzurihara)