Differences between revisions 18 and 171 (spanning 153 versions)
Revision 18 as of 2009-06-08 02:03:35
Size: 852
Editor: whitehole
Comment:
Revision 171 as of 2016-02-17 14:21:34
Size: 1164
Editor: MarkBarton
Comment:
Deletions are marked like this. Additions are marked like this.
Line 1: Line 1:
|| '''[[LCGT|PROJECT TOP]]''' ||[[LCGT/subgroup/analysis|GW Analysis]] ||[[LCGT/subgroup/ifo|Interferometer]] ||[[LCGT/subgroup/vacuum|Vacuum & Cryostat]] ||[[LCGT/subgroup/laser|Laser & Optics]] ||[[LCGT/subgroup/vis|Seismic Isolator]] ||[[LCGT/subgroup/infra|Infrastructure]] ||
## page was renamed from LCGT/subgroup/vis
Line 5: Line 4:
== 防振系 == == Vibration Isolation ==
 . Chief: R. Takahashi (NAOJ)
 . Member: N. Ohishi, H. Ishizaki, F. E. Pena Arellano, M. Barton, N. Hirata, R. Flaminio, Y. Aso, T. Akutsu (NAOJ),
 T. Sekiguchi, K. Yamamoto, T. Uchiyama (ICRR), R. DeSalvo (Univ. of Sannio), E. Majorana (INFN Rome), J. van den Brand, E. Hennes, A. Bertolini, J. van Heijningen, K. Agatsuma (NIKHEF)
Line 7: Line 9:
 リーダー: 高橋竜太郎 (NAOJ) <<BR>> ----
== VIS Meeting ==
 . Every Friday, from 13:30 (JST)
 . [[KAGRA/Subgroups/VIS/MeetingNAOJ|Meeting Page]]
Line 9: Line 14:
 サブリーダー: 内山隆 (ICRR)、三代木伸二 (ICRR) ----
== Design ==
[[KAGRA/Subgroups/VIS/TypeA|Type-A]]
Line 11: Line 18:
[[KAGRA/Subgroups/VIS/TypeB|Type-B]]
Line 12: Line 20:
=== TAMA SAS の問題点 ===
 . [[]]
[[KAGRA/Subgroups/VIS/TypeBp|Type-Bp]]
Line 15: Line 22:
=== 第1回LCGT防振系作業部会 === [[KAGRA/Subgroups/VIS/Type-C|Type-C]]
Line 17: Line 24:
 6月3日(水) 17:00-19:00 天文台輪講室 [[KAGRA/Subgroups/VIS/Payload|Payload]]
Line 19: Line 26:
 ・[[attachment:LCGT/subgroup/vis/agenda1.pdf|作業班、スケジュール]] iKAGRA TM
Line 21: Line 28:
 ・[[attachment:LCGT/subgroup/vis/ICDsas.doc|ICD]] ([[attachment:ICDsas.pdf|PDF]]) ----
== Installation ==
 . [[KAGRA/Subgroups/VIS/IstManual|Installation Procedure]]
 . [[KAGRA/Subgroups/VIS/VISInstWorkInfo|Misc. Installation Work Information]]
Line 23: Line 33:
 ・[[attachment:LCGT/subgroup/vis/LCGT-SAS2.pdf|常温-低温接続部]] ----
== Operation ==
 . [[KAGRA/Subgroups/VIS/OpsManual|Operation Manual]]
Line 25: Line 37:
 ・R&Dについて ----
== Old Weekly EVO Meeting ==
 . This meeting is suspended.

[[KAGRA/Subgroups/VIS/OldVISMeetings|Past minutes]]

Vibration Isolation

  • Chief: R. Takahashi (NAOJ)
  • Member: N. Ohishi, H. Ishizaki, F. E. Pena Arellano, M. Barton, N. Hirata, R. Flaminio, Y. Aso, T. Akutsu (NAOJ),

    T. Sekiguchi, K. Yamamoto, T. Uchiyama (ICRR), R. DeSalvo (Univ. of Sannio), E. Majorana (INFN Rome), J. van den Brand, E. Hennes, A. Bertolini, J. van Heijningen, K. Agatsuma (NIKHEF)


VIS Meeting


Design

Type-A

Type-B

Type-Bp

Type-C

Payload

iKAGRA TM


Installation


Operation


Old Weekly EVO Meeting

  • This meeting is suspended.

Past minutes

KAGRA/Subgroups/VIS (last edited 2022-02-25 19:10:23 by HirotakaYuzurihara)