Size: 174
Comment:
|
Size: 1103
Comment:
|
Deletions are marked like this. | Additions are marked like this. |
Line 1: | Line 1: |
'''防振''' | ## page was renamed from LCGT/subgroup/vis <<TableOfContents(3)>> |
Line 3: | Line 4: |
リーダー: 高橋竜太郎 (NAOJ) | == Vibration Isolation == . Chief: R. Takahashi (NAOJ) . Member: N. Ohishi, H. Ishizaki, F. E. Pena Arellano, M. Barton, N. Hirata, R. Flaminio, Y. Aso, T. Akutsu (NAOJ), T. Sekiguchi, K. Yamamoto, T. Uchiyama (ICRR), R. DeSalvo (Univ. of Sannio), E. Majorana (INFN Rome), J. van den Brand, E. Hennes, A. Bertolini, J. van Heijningen, K. Agatsuma (NIKHEF) |
Line 5: | Line 9: |
サブリーダー:内山隆 (ICRR)、三代木伸二 (ICRR) | ---- == VIS Meeting == . Every Friday, from 13:30 (JST) . [[KAGRA/Subgroups/VIS/MeetingNAOJ|Meeting Page]] |
Line 7: | Line 14: |
*[[attachment:LCGT/subgroup/vis/ICDsas.doc|ICD]] | ---- == Design == [[KAGRA/Subgroups/VIS/TypeA|Type-A]] Type-B [[KAGRA/Subgroups/VIS/TypeBp|Type-Bp]] Type-C [[KAGRA/Subgroups/VIS/Payload|Payload]] iKAGRA TM ---- == Installation == . [[KAGRA/Subgroups/VIS/IstManual|Installation Procedure]] . [[KAGRA/Subgroups/VIS/VISInstWorkInfo|Misc. Installation Work Information]] ---- == Operation == . [[KAGRA/Subgroups/VIS/OpsManual|Operation Manual]] ---- == Old Weekly EVO Meeting == . This meeting is suspended. [[KAGRA/Subgroups/VIS/OldVISMeetings|Past minutes]] |
Vibration Isolation
- Chief: R. Takahashi (NAOJ)
- Member: N. Ohishi, H. Ishizaki, F. E. Pena Arellano, M. Barton, N. Hirata, R. Flaminio, Y. Aso, T. Akutsu (NAOJ),
T. Sekiguchi, K. Yamamoto, T. Uchiyama (ICRR), R. DeSalvo (Univ. of Sannio), E. Majorana (INFN Rome), J. van den Brand, E. Hennes, A. Bertolini, J. van Heijningen, K. Agatsuma (NIKHEF)
VIS Meeting
- Every Friday, from 13:30 (JST)
Design
Type-B
Type-C
iKAGRA TM
Installation
Operation
Old Weekly EVO Meeting
- This meeting is suspended.