Differences between revisions 28 and 148 (spanning 120 versions)
Revision 28 as of 2009-07-15 15:41:47
Size: 1280
Comment:
Revision 148 as of 2012-09-27 12:24:56
Size: 7512
Comment:
Deletions are marked like this. Additions are marked like this.
Line 1: Line 1:
|| '''[[LCGT|PROJECT TOP]]''' ||[[LCGT/subgroup/analysis|GW Analysis]] ||[[LCGT/subgroup/ifo|Interferometer]] ||[[LCGT/subgroup/vacuum|Vacuum & Cryostat]] ||[[LCGT/subgroup/laser|Laser & Optics]] ||[[LCGT/subgroup/vis|Seismic Isolator]] ||[[LCGT/subgroup/infra|Infrastructure]] ||
## page was renamed from LCGT/subgroup/vis
Line 5: Line 4:
== 防振系 == == Vibration Isolation ==
 . Chief: R. Takahashi(ICRR)
 . Member: T. Uchiyama(ICRR), R. DeSalvo(Univ. of Sannio), H. Ishizaki(NAOJ), A. Takamori(ERI), E. Majorana(INFN), T. Sekiguchi(ICRR), K. Yamamoto(ICRR)
Line 7: Line 8:
 常温防振+ヒートリンク+低温懸架 ----
== Weekly EVO Meeting ==
 . Every Wednesday, 21:00(JST)
Line 9: Line 12:
 リーダー: 高橋竜太郎 (NAOJ) <<BR>> === The ??th (5 September, 2012) ===
 . [[attachment:KAGRAvi_minute_2012Sep5|Minute]]
Line 11: Line 15:
 サブリーダー: 内山隆 (ICRR)、三代木伸二 (ICRR) === The ??th (29 September, 2012) ===
 . [[attachment:KAGRAvi_minute_2012Sep5|Minute]]
Line 13: Line 18:
=== The ??th (22 September, 2012) ===
 . [[attachment:KAGRAvi_minute_2012Sep5|Minute]]
Line 14: Line 21:
=== 第2回LCGT防振系作業部会 === === The ??th (15 September, 2012) ===
 . No meeting (summer vacation)
Line 16: Line 24:
 7月16日(水) 15:00-16:30 天文台輪講室 === The ??th (8 September, 2012) ===
 . [[attachment:KAGRAvi_minute_2012Sep5|Minute]]
Line 18: Line 27:
 [[attachment:LCGT/subgroup/vis/Modeling1.ppt|LCGT-SAS Modeling]] === The ??th (1 September, 2012) ===
 . [[attachment:KAGRAvi_minute_2012Sep5|Minute]]
Line 20: Line 30:
 [[attachment:LCGT/subgroup/vis/Modeling1.ppt|R&Dについて]] === The 24th (28 September, 2011) ===
 . [[attachment:KAGRA/Subgroups/VIS/modal_0928.pdf|Modal Analysis of Tripod by Takanori]]
Line 22: Line 33:
=== 第1回LCGT防振系作業部会 === === The 23th (15 September, 2011) ===
 . [[attachment:KAGRA/Subgroups/VIS/TypeB_sim_0915.pdf|Simulation on TypeB by Takanori]]
Line 24: Line 36:
 6月3日(水) 17:00-19:00 天文台輪講室 === The 22th (7 September, 2011) ===
 . [[attachment:KAGRA/Subgroups/VIS/Type-B_system_rycy.pdf|Z-Assembly for RM by Riccardo]]
 . [[attachment:KAGRA/Subgroups/VIS/Type-B_system_bs.pdf|Z-Assembly for BS by Riccardo]]
 . [[attachment:KAGRA/Subgroups/VIS/TypeB_sim_0907.pdf|Simulation on TypeB by Takanori]]
Line 26: Line 41:
 [[attachment:LCGT/subgroup/vis/agenda1.pdf|作業班、スケジュール]] === The 21th (31 August, 2011) ===
=== The 20th (24 August, 2011) ===
=== The 19th (10 August, 2011) ===
=== The 18th (27 July, 2011) ===
 . [[attachment:KAGRA/Subgroups/VIS/PayloadB_0727.pdf|Design of Type-B payload by Riccardo]]
Line 28: Line 47:
 [[attachment:LCGT/subgroup/vis/ICDsas.doc|ICD]] ([[attachment:ICDsas.pdf|PDF]]) === The 17th (20 July, 2011) ===
=== The 16th (13 July, 2011) ===
 . [[attachment:KAGRA/Subgroups/VIS/SR2-PR2_0711.pdf|SR2-PR2 recoil mass by Riccardo]]
 . [[attachment:KAGRA/Subgroups/VIS/angle_0713.pdf|Angular fluctuation of TM by Takanori]]
Line 30: Line 52:
 [[attachment:LCGT/subgroup/vis/LCGT-SAS2.pdf|常温-低温接続部]] === The 15th (6 July, 2011) ===
 . [[attachment:KAGRA/Subgroups/VIS/2type_0701.pdf|Type-B payload model by Sekiguchi]]
Line 32: Line 55:
 R&Dについて
=== TAMA SAS の問題点 ===
 . [[LCGT/subgroup/vis/tama_sas|Item list to be improved]]
=== The 14th (29 June, 2011) ===
 . [[attachment:KAGRA/Subgroups/VIS/kapton_0627.pdf|Kapton Wire by Sekiguchi]]
Line 36: Line 58:
=== TAMA Double Pendulum の問題点 === === The 13th (22 June, 2011) ===
 . [[http://tamago.mtk.nao.ac.jp/ishizaki/LCGT/kaptonwire/cable.pdf|Kapton Wire by Ishizaki]]

=== The 12th (15 June, 2011) ===
=== The 11th (8 June, 2011) ===
 . [[attachment:KAGRA/Subgroups/VIS/minute0608.pdf|Minute]]

=== The 10th (1 June, 2011) ===
 . [[attachment:KAGRA/Subgroups/VIS/damping0601.pdf|Mode damping study by Takanori]]

=== The 9th (25 May, 2011) ===
=== The 8th (18 May, 2011) ===
 . [[attachment:KAGRA/Subgroups/VIS/magicwand.png|Magic wands by Takanori]]
 . [[attachment:KAGRA/Subgroups/VIS/Check110512.pdf|Heavier test mass by Ettore and Takanori]]

=== The 7th (11 May, 2011) ===
 . [[attachment:KAGRA/Subgroups/VIS/rep110511.pdf|Report by Takanori]]

=== The 6th (27 April, 2011) ===
 . [[attachment:KAGRA/Subgroups/VIS/dimension110427.docx|Payload dimensions by Riccardo]]

=== The 5th (20 April, 2011) ===
 . [[attachment:KAGRA/Subgroups/VIS/3D_model.pdf|Parameter Configuration by Ettore]]

=== (11 April, 2011) ===
 . [[attachment:KAGRA/Subgroups/VIS/LCGT_PAY_10-30.pdf|Parameter Configuration by Ettore]]

=== The 4th (6 April, 2011) ===
 . [[attachment:KAGRA/Subgroups/VIS/10-30_April06.docx|Simulation by Ettore]]
 . [[attachment:KAGRA/Subgroups/VIS/sequence110406.pdf|Installation sequence by Riccardo]]

=== The 3rd (30 March, 2011) ===
 . [[attachment:KAGRA/Subgroups/VIS/coordinate110330.pdf|Coordinate system by Ryutaro]]
 . [[attachment:KAGRA/Subgroups/VIS/110330_isasA.pdf|Simulation by Takanori]]

=== The 2nd (23 March, 2011) ===
 . [[attachment:KAGRA/Subgroups/VIS/memo110323.txt|Comments by Riccardo]]
 . [[attachment:KAGRA/Subgroups/VIS/report110323.doc|Status report by Riccardo]]
 . [[attachment:KAGRA/Subgroups/VIS/sim110323.pptx|Simulation by Ettore]]

=== The 1st (16 March, 2011) ===
 . [[attachment:KAGRA/Subgroups/VIS/Tower-a.pdf|Design for Type-A system]]
 . [[attachment:KAGRA/Subgroups/VIS/filter-chain.pdf|Detail of filter's chain]]

----
== LCGT防振系作業部会(2009) ==
=== 第6回 ===
 . 11月12日(木) 15:00-16:30 天文台輪講室
 . [[attachment:KAGRA/Subgroups/VIS/Modeling6.ppt|Model vs. Measurement in TAMA-SAS]]
 . [[attachment:KAGRA/Subgroups/VIS/chamber-AB.pdf|Design of Type-A,B chamber (rev.)]]

=== 第5回 ===
 . 10月15日(木) 13:00-14:30 天文台大会議室 ([[attachment:KAGRA/Subgroups/VIS/minutes5.pdf|議事録]])
 . [[attachment:KAGRA/Subgroups/VIS/Modeling5.ppt|LCGT-SAS Modeling 5 (Type-B,C)]]
 . [[attachment:KAGRA/Subgroups/VIS/chamber-A.pdf|Design of Type-A chamber]]

=== ブレーンストーミング ===
 . 10月1日(木) 13:00-15:00 東京大学理学部1号館445号室 ([[attachment:KAGRA/Subgroups/VIS/minutes-b.pdf|議事録]])
 . [[attachment:KAGRA/Subgroups/VIS/brest.pdf|メモ]]

=== 第4回 ===
 . 9月3日(木) 15:00-16:30 天文台輪講室 ([[attachment:KAGRA/Subgroups/VIS/minutes4.pdf|議事録]])
 . [[attachment:KAGRA/Subgroups/VIS/Modeling3.ppt|LCGT-SAS Modeling 3 (Gain boost)]]
 . [[attachment:KAGRA/Subgroups/VIS/Modeling4.pdf|LCGT-SAS Modeling 4 (Vertical, Pitch)]]
 . [[attachment:KAGRA/Subgroups/VIS/ICDsas2.doc|ICD update]] ([[attachment:ICDsas2.pdf|PDF]])

=== 第3回 ===
 . 8月6日(木) 15:00-16:30 天文台輪講室 ([[attachment:KAGRA/Subgroups/VIS/minutes3.pdf|議事録]])
 . [[attachment:KAGRA/Subgroups/VIS/Modeling2.ppt|LCGT-SAS Modeling 2]]
 . [[attachment:KAGRA/Subgroups/VIS/RandD2.pdf|低温懸架のR&Dについて]]

=== 第2回 ===
 . 7月16日(木) 15:00-16:30 天文台輪講室 ([[attachment:KAGRA/Subgroups/VIS/minutes2.pdf|議事録]])
 . [[attachment:KAGRA/Subgroups/VIS/Modeling1.ppt|LCGT-SAS Modeling]]
 . [[attachment:KAGRA/Subgroups/VIS/RandD.pdf|LCGT-SASのR&Dについて]]

=== 第1回 ===
 . 6月3日(水) 17:00-19:00 天文台輪講室 ([[attachment:KAGRA/Subgroups/VIS/minutes1.pdf|議事録]])
 . [[attachment:KAGRA/Subgroups/VIS/agenda1.pdf|作業班、スケジュール]]
 . [[attachment:KAGRA/Subgroups/VIS/ICDsas.doc|ICD]] ([[attachment:ICDsas.pdf|PDF]])
 . [[attachment:KAGRA/Subgroups/VIS/LCGT-SAS2.pdf|常温-低温接続部]]
 . R&Dについて (次回)

----
== Archive ==
=== TAMA SAS ===
 . [[attachment:KAGRA/Subgroups/VIS/Report2009.ppt|Evaluation of TAMA-SAS for LCGT]]
 . [[attachment:tama_sas.pdf|Drawings of TAMA SAS]]
 . [[KAGRA/Subgroups/VIS/FEM/tama_sas|Item list to be improved]]

=== TAMA Double Pendulum ===
Line 38: Line 150:

=== Seismic spectrum in Kamioka mine ===
 . [[attachment:LCGT/subgroup/ifo/SPI/HeatLink/0702seis_Araya.zip|In loud day]] (This data should be used as nominal ground motion in Kamioka)
 . [[attachment:CLIO/NoiseBudgets/seismic/cryo_seismic.txt|In cryostat]]

=== LCGT-SAS model ===
 . Transfer function X0~X7/Xg --([[attachment:KAGRA/Subgroups/VIS/model_trf.txt|(old)]])--
 . Modeling M-file --([[attachment:KAGRA/Subgroups/VIS/model_mfile.zip|(2009/8/15)]])--[[attachment:KAGRA/Subgroups/VIS/model_mfile2.zip|(2009/8/17)]]
 . Spectrum of displacement --([[attachment:KAGRA/Subgroups/VIS/model_disp.zip|(2009/8/15)]])--[[attachment:KAGRA/Subgroups/VIS/model_disp2.zip|(2009/8/17)]]

=== Finite Element Analysis ===
 . [[KAGRA/Subgroups/VIS/FEM|FEM Page]]

=== Rigid-Body Models ===
 . [[KAGRA/Subgroups/VIS/Simulation|Simulation Page]]

Vibration Isolation

  • Chief: R. Takahashi(ICRR)
  • Member: T. Uchiyama(ICRR), R. DeSalvo(Univ. of Sannio), H. Ishizaki(NAOJ), A. Takamori(ERI), E. Majorana(INFN), T. Sekiguchi(ICRR), K. Yamamoto(ICRR)


Weekly EVO Meeting

  • Every Wednesday, 21:00(JST)

The ??th (5 September, 2012)

The ??th (29 September, 2012)

The ??th (22 September, 2012)

The ??th (15 September, 2012)

  • No meeting (summer vacation)

The ??th (8 September, 2012)

The ??th (1 September, 2012)

The 24th (28 September, 2011)

The 23th (15 September, 2011)

The 22th (7 September, 2011)

The 21th (31 August, 2011)

The 20th (24 August, 2011)

The 19th (10 August, 2011)

The 18th (27 July, 2011)

The 17th (20 July, 2011)

The 16th (13 July, 2011)

The 15th (6 July, 2011)

The 14th (29 June, 2011)

The 13th (22 June, 2011)

The 12th (15 June, 2011)

The 11th (8 June, 2011)

The 10th (1 June, 2011)

The 9th (25 May, 2011)

The 8th (18 May, 2011)

The 7th (11 May, 2011)

The 6th (27 April, 2011)

The 5th (20 April, 2011)

(11 April, 2011)

The 4th (6 April, 2011)

The 3rd (30 March, 2011)

The 2nd (23 March, 2011)

The 1st (16 March, 2011)


LCGT防振系作業部会(2009)

第6回

第5回

ブレーンストーミング

  • 10月1日(木) 13:00-15:00 東京大学理学部1号館445号室 (議事録)

  • メモ

第4回

第3回

第2回

第1回


Archive

TAMA SAS

TAMA Double Pendulum

Seismic spectrum in Kamioka mine

LCGT-SAS model

Finite Element Analysis

Rigid-Body Models

KAGRA/Subgroups/VIS (last edited 2022-02-25 19:10:23 by HirotakaYuzurihara)