== 防振系 == | == Vibration Isolation == . Chief: R. Takahashi(ICRR) . Member: T. Uchiyama(ICRR), R. DeSalvo(Univ. of Sannio), H. Ishizaki(NAOJ), A. Takamori(ERI), E. Majorana(INFN), T. Sekiguchi(ICRR), K. Yamamoto(ICRR) |
Line 7: | Line 8: |
常温防振+ヒートリンク+低温懸架 | ---- == Weekly EVO Meeting == . Every Wednesday, 21:00(JST) |
Line 9: | Line 12: |
リーダー: 高橋竜太郎 (NAOJ) <<BR>> | === The ??th (5 September, 2012) === . [[attachment:KAGRAvi_minute_2012Sep5|Minute]] |
Line 11: | Line 15: |
サブリーダー: 内山隆 (ICRR)、三代木伸二 (ICRR) | === The 24th (28 September, 2011) === . [[attachment:KAGRA/Subgroups/VIS/modal_0928.pdf|Modal Analysis of Tripod by Takanori]] |
Line 13: | Line 18: |
=== The 23th (15 September, 2011) === . [[attachment:KAGRA/Subgroups/VIS/TypeB_sim_0915.pdf|Simulation on TypeB by Takanori]] |
|
Line 14: | Line 21: |
=== 第2回LCGT防振系作業部会 === | === The 22th (7 September, 2011) === . [[attachment:KAGRA/Subgroups/VIS/Type-B_system_rycy.pdf|Z-Assembly for RM by Riccardo]] . [[attachment:KAGRA/Subgroups/VIS/Type-B_system_bs.pdf|Z-Assembly for BS by Riccardo]] . [[attachment:KAGRA/Subgroups/VIS/TypeB_sim_0907.pdf|Simulation on TypeB by Takanori]] |
Line 16: | Line 26: |
7月16日(水) 15:00-16:30 天文台輪講室 | === The 21th (31 August, 2011) === === The 20th (24 August, 2011) === === The 19th (10 August, 2011) === === The 18th (27 July, 2011) === . [[attachment:KAGRA/Subgroups/VIS/PayloadB_0727.pdf|Design of Type-B payload by Riccardo]] |
Line 18: | Line 32: |
[[attachment:LCGT/subgroup/vis/Modeling1.ppt|LCGT-SAS Modeling]] | === The 17th (20 July, 2011) === === The 16th (13 July, 2011) === . [[attachment:KAGRA/Subgroups/VIS/SR2-PR2_0711.pdf|SR2-PR2 recoil mass by Riccardo]] . [[attachment:KAGRA/Subgroups/VIS/angle_0713.pdf|Angular fluctuation of TM by Takanori]] |
Line 20: | Line 37: |
[[attachment:LCGT/subgroup/vis/RandD.pdf|R&Dについて]] | === The 15th (6 July, 2011) === . [[attachment:KAGRA/Subgroups/VIS/2type_0701.pdf|Type-B payload model by Sekiguchi]] |
Line 22: | Line 40: |
=== 第1回LCGT防振系作業部会 === | === The 14th (29 June, 2011) === . [[attachment:KAGRA/Subgroups/VIS/kapton_0627.pdf|Kapton Wire by Sekiguchi]] |
Line 24: | Line 43: |
6月3日(水) 17:00-19:00 天文台輪講室 | === The 13th (22 June, 2011) === . [[http://tamago.mtk.nao.ac.jp/ishizaki/LCGT/kaptonwire/cable.pdf|Kapton Wire by Ishizaki]] |
Line 26: | Line 46: |
[[attachment:LCGT/subgroup/vis/agenda1.pdf|作業班、スケジュール]] | === The 12th (15 June, 2011) === === The 11th (8 June, 2011) === . [[attachment:KAGRA/Subgroups/VIS/minute0608.pdf|Minute]] |
Line 28: | Line 50: |
[[attachment:LCGT/subgroup/vis/ICDsas.doc|ICD]] ([[attachment:ICDsas.pdf|PDF]]) | === The 10th (1 June, 2011) === . [[attachment:KAGRA/Subgroups/VIS/damping0601.pdf|Mode damping study by Takanori]] |
Line 30: | Line 53: |
[[attachment:LCGT/subgroup/vis/LCGT-SAS2.pdf|常温-低温接続部]] | === The 9th (25 May, 2011) === === The 8th (18 May, 2011) === . [[attachment:KAGRA/Subgroups/VIS/magicwand.png|Magic wands by Takanori]] . [[attachment:KAGRA/Subgroups/VIS/Check110512.pdf|Heavier test mass by Ettore and Takanori]] |
Line 32: | Line 58: |
R&Dについて === TAMA SAS の問題点 === . [[LCGT/subgroup/vis/tama_sas|Item list to be improved]] |
=== The 7th (11 May, 2011) === . [[attachment:KAGRA/Subgroups/VIS/rep110511.pdf|Report by Takanori]] |
Line 36: | Line 61: |
=== TAMA Double Pendulum の問題点 === | === The 6th (27 April, 2011) === . [[attachment:KAGRA/Subgroups/VIS/dimension110427.docx|Payload dimensions by Riccardo]] === The 5th (20 April, 2011) === . [[attachment:KAGRA/Subgroups/VIS/3D_model.pdf|Parameter Configuration by Ettore]] === (11 April, 2011) === . [[attachment:KAGRA/Subgroups/VIS/LCGT_PAY_10-30.pdf|Parameter Configuration by Ettore]] === The 4th (6 April, 2011) === . [[attachment:KAGRA/Subgroups/VIS/10-30_April06.docx|Simulation by Ettore]] . [[attachment:KAGRA/Subgroups/VIS/sequence110406.pdf|Installation sequence by Riccardo]] === The 3rd (30 March, 2011) === . [[attachment:KAGRA/Subgroups/VIS/coordinate110330.pdf|Coordinate system by Ryutaro]] . [[attachment:KAGRA/Subgroups/VIS/110330_isasA.pdf|Simulation by Takanori]] === The 2nd (23 March, 2011) === . [[attachment:KAGRA/Subgroups/VIS/memo110323.txt|Comments by Riccardo]] . [[attachment:KAGRA/Subgroups/VIS/report110323.doc|Status report by Riccardo]] . [[attachment:KAGRA/Subgroups/VIS/sim110323.pptx|Simulation by Ettore]] === The 1st (16 March, 2011) === . [[attachment:KAGRA/Subgroups/VIS/Tower-a.pdf|Design for Type-A system]] . [[attachment:KAGRA/Subgroups/VIS/filter-chain.pdf|Detail of filter's chain]] ---- == LCGT防振系作業部会(2009) == === 第6回 === . 11月12日(木) 15:00-16:30 天文台輪講室 . [[attachment:KAGRA/Subgroups/VIS/Modeling6.ppt|Model vs. Measurement in TAMA-SAS]] . [[attachment:KAGRA/Subgroups/VIS/chamber-AB.pdf|Design of Type-A,B chamber (rev.)]] === 第5回 === . 10月15日(木) 13:00-14:30 天文台大会議室 ([[attachment:KAGRA/Subgroups/VIS/minutes5.pdf|議事録]]) . [[attachment:KAGRA/Subgroups/VIS/Modeling5.ppt|LCGT-SAS Modeling 5 (Type-B,C)]] . [[attachment:KAGRA/Subgroups/VIS/chamber-A.pdf|Design of Type-A chamber]] === ブレーンストーミング === . 10月1日(木) 13:00-15:00 東京大学理学部1号館445号室 ([[attachment:KAGRA/Subgroups/VIS/minutes-b.pdf|議事録]]) . [[attachment:KAGRA/Subgroups/VIS/brest.pdf|メモ]] === 第4回 === . 9月3日(木) 15:00-16:30 天文台輪講室 ([[attachment:KAGRA/Subgroups/VIS/minutes4.pdf|議事録]]) . [[attachment:KAGRA/Subgroups/VIS/Modeling3.ppt|LCGT-SAS Modeling 3 (Gain boost)]] . [[attachment:KAGRA/Subgroups/VIS/Modeling4.pdf|LCGT-SAS Modeling 4 (Vertical, Pitch)]] . [[attachment:KAGRA/Subgroups/VIS/ICDsas2.doc|ICD update]] ([[attachment:ICDsas2.pdf|PDF]]) === 第3回 === . 8月6日(木) 15:00-16:30 天文台輪講室 ([[attachment:KAGRA/Subgroups/VIS/minutes3.pdf|議事録]]) . [[attachment:KAGRA/Subgroups/VIS/Modeling2.ppt|LCGT-SAS Modeling 2]] . [[attachment:KAGRA/Subgroups/VIS/RandD2.pdf|低温懸架のR&Dについて]] === 第2回 === . 7月16日(木) 15:00-16:30 天文台輪講室 ([[attachment:KAGRA/Subgroups/VIS/minutes2.pdf|議事録]]) . [[attachment:KAGRA/Subgroups/VIS/Modeling1.ppt|LCGT-SAS Modeling]] . [[attachment:KAGRA/Subgroups/VIS/RandD.pdf|LCGT-SASのR&Dについて]] === 第1回 === . 6月3日(水) 17:00-19:00 天文台輪講室 ([[attachment:KAGRA/Subgroups/VIS/minutes1.pdf|議事録]]) . [[attachment:KAGRA/Subgroups/VIS/agenda1.pdf|作業班、スケジュール]] . [[attachment:KAGRA/Subgroups/VIS/ICDsas.doc|ICD]] ([[attachment:ICDsas.pdf|PDF]]) . [[attachment:KAGRA/Subgroups/VIS/LCGT-SAS2.pdf|常温-低温接続部]] . R&Dについて (次回) ---- == Archive == === TAMA SAS === . [[attachment:KAGRA/Subgroups/VIS/Report2009.ppt|Evaluation of TAMA-SAS for LCGT]] . [[attachment:tama_sas.pdf|Drawings of TAMA SAS]] . [[KAGRA/Subgroups/VIS/FEM/tama_sas|Item list to be improved]] === TAMA Double Pendulum === |
Line 38: | Line 135: |
=== Seismic spectrum in Kamioka mine === . [[attachment:LCGT/subgroup/ifo/SPI/HeatLink/0702seis_Araya.zip|In loud day]] (This data should be used as nominal ground motion in Kamioka) . [[attachment:CLIO/NoiseBudgets/seismic/cryo_seismic.txt|In cryostat]] === LCGT-SAS model === . Transfer function X0~X7/Xg --([[attachment:KAGRA/Subgroups/VIS/model_trf.txt|(old)]])-- . Modeling M-file --([[attachment:KAGRA/Subgroups/VIS/model_mfile.zip|(2009/8/15)]])--[[attachment:KAGRA/Subgroups/VIS/model_mfile2.zip|(2009/8/17)]] . Spectrum of displacement --([[attachment:KAGRA/Subgroups/VIS/model_disp.zip|(2009/8/15)]])--[[attachment:KAGRA/Subgroups/VIS/model_disp2.zip|(2009/8/17)]] === Finite Element Analysis === . [[KAGRA/Subgroups/VIS/FEM|FEM Page]] === Rigid-Body Models === . [[KAGRA/Subgroups/VIS/Simulation|Simulation Page]] |
Contents
- Vibration Isolation
-
Weekly EVO Meeting
- The ??th (5 September, 2012)
- The 24th (28 September, 2011)
- The 23th (15 September, 2011)
- The 22th (7 September, 2011)
- The 21th (31 August, 2011)
- The 20th (24 August, 2011)
- The 19th (10 August, 2011)
- The 18th (27 July, 2011)
- The 17th (20 July, 2011)
- The 16th (13 July, 2011)
- The 15th (6 July, 2011)
- The 14th (29 June, 2011)
- The 13th (22 June, 2011)
- The 12th (15 June, 2011)
- The 11th (8 June, 2011)
- The 10th (1 June, 2011)
- The 9th (25 May, 2011)
- The 8th (18 May, 2011)
- The 7th (11 May, 2011)
- The 6th (27 April, 2011)
- The 5th (20 April, 2011)
- (11 April, 2011)
- The 4th (6 April, 2011)
- The 3rd (30 March, 2011)
- The 2nd (23 March, 2011)
- The 1st (16 March, 2011)
- LCGT防振系作業部会(2009)
- Archive
Vibration Isolation
- Chief: R. Takahashi(ICRR)
Member: T. Uchiyama(ICRR), R. DeSalvo(Univ. of Sannio), H. Ishizaki(NAOJ), A. Takamori(ERI), E. Majorana(INFN), T. Sekiguchi(ICRR), K. Yamamoto(ICRR)
Weekly EVO Meeting
- Every Wednesday, 21:00(JST)
The ??th (5 September, 2012)
The 24th (28 September, 2011)
The 23th (15 September, 2011)
The 22th (7 September, 2011)
The 21th (31 August, 2011)
The 20th (24 August, 2011)
The 19th (10 August, 2011)
The 18th (27 July, 2011)
The 17th (20 July, 2011)
The 16th (13 July, 2011)
The 15th (6 July, 2011)
The 14th (29 June, 2011)
The 13th (22 June, 2011)
The 12th (15 June, 2011)
The 11th (8 June, 2011)
The 10th (1 June, 2011)
The 9th (25 May, 2011)
The 8th (18 May, 2011)
The 7th (11 May, 2011)
The 6th (27 April, 2011)
The 5th (20 April, 2011)
(11 April, 2011)
The 4th (6 April, 2011)
The 3rd (30 March, 2011)
The 2nd (23 March, 2011)
The 1st (16 March, 2011)
LCGT防振系作業部会(2009)
第6回
- 11月12日(木) 15:00-16:30 天文台輪講室
第5回
10月15日(木) 13:00-14:30 天文台大会議室 (議事録)
ブレーンストーミング
第4回
9月3日(木) 15:00-16:30 天文台輪講室 (議事録)
第3回
8月6日(木) 15:00-16:30 天文台輪講室 (議事録)
第2回
7月16日(木) 15:00-16:30 天文台輪講室 (議事録)
第1回
6月3日(水) 17:00-19:00 天文台輪講室 (議事録)
R&Dについて (次回)
Archive
TAMA SAS
TAMA Double Pendulum
Seismic spectrum in Kamioka mine
In loud day (This data should be used as nominal ground motion in Kamioka)
LCGT-SAS model
Transfer function X0~X7/Xg (old)
Modeling M-file (2009/8/15)(2009/8/17)
Spectrum of displacement (2009/8/15)(2009/8/17)
Finite Element Analysis