Size: 378
Comment:
|
Size: 1220
Comment:
|
Deletions are marked like this. | Additions are marked like this. |
Line 1: | Line 1: |
'''防振''' | ## page was renamed from LCGT/subgroup/vis <<TableOfContents(3)>> |
Line 3: | Line 4: |
リーダー: 高橋竜太郎 (NAOJ) | == Vibration Isolation == . Chief: R. Takahashi (NAOJ) . Member: N. Ohishi, H. Ishizaki, F. E. Pena Arellano, M. Barton, N. Hirata, R. Flaminio, Y. Aso, T. Akutsu (NAOJ), T. Sekiguchi, K. Yamamoto, T. Uchiyama (ICRR), R. DeSalvo (Univ. of Sannio), E. Majorana (INFN Rome), J. van den Brand, E. Hennes, A. Bertolini, J. van Heijningen, K. Agatsuma (NIKHEF) |
Line 5: | Line 9: |
サブリーダー:内山隆 (ICRR)、三代木伸二 (ICRR) | ---- == VIS Meeting == . Every Friday, from 13:30 (JST) . [[KAGRA/Subgroups/VIS/MeetingNAOJ|Meeting Page]] |
Line 7: | Line 14: |
第1回LCGT防振系作業部会 | ---- == Design == [[KAGRA/Subgroups/VIS/TypeA|Type-A]] |
Line 9: | Line 18: |
・[[attachment:LCGT/subgroup/vis/agenda1.doc|作業班、スケジュール]] | [[KAGRA/Subgroups/VIS/TypeB|Type-B]] |
Line 11: | Line 20: |
・[[attachment:LCGT/subgroup/vis/ICDsas.doc|ICD]] | [[KAGRA/Subgroups/VIS/TypeBp|Type-Bp]] |
Line 13: | Line 22: |
・[[attachment:LCGT/subgroup/vis/LCGT-SAS2.doc|常温-Cryo接続部]] | [[KAGRA/Subgroups/VIS/Type-C|Type-C]] |
Line 15: | Line 24: |
・R&D | [[KAGRA/Subgroups/VIS/Payload|Payload]] ---- == Installation == . [[KAGRA/Subgroups/VIS/IstManual|Installation Procedure]] . [[KAGRA/Subgroups/VIS/VISInstWorkInfo|Misc. Installation Work Information]] . [[KAGRA/Subgroups/VIS/iKAGRAbKAGRA|Tasks from iKAGRA to bKAGRA]] ---- == Operation == . [[KAGRA/Subgroups/VIS/OpsManual|Operation Manual]] ---- == Old Weekly EVO Meeting == . This meeting is suspended. [[KAGRA/Subgroups/VIS/OldVISMeetings|Past minutes]] |
Vibration Isolation
- Chief: R. Takahashi (NAOJ)
- Member: N. Ohishi, H. Ishizaki, F. E. Pena Arellano, M. Barton, N. Hirata, R. Flaminio, Y. Aso, T. Akutsu (NAOJ),
T. Sekiguchi, K. Yamamoto, T. Uchiyama (ICRR), R. DeSalvo (Univ. of Sannio), E. Majorana (INFN Rome), J. van den Brand, E. Hennes, A. Bertolini, J. van Heijningen, K. Agatsuma (NIKHEF)
VIS Meeting
- Every Friday, from 13:30 (JST)
Design
Installation
Operation
Old Weekly EVO Meeting
- This meeting is suspended.