Differences between revisions 34 and 38 (spanning 4 versions)
Revision 34 as of 2009-07-15 15:54:50
Size: 1332
Comment:
Revision 38 as of 2009-07-27 16:32:36
Size: 1534
Editor: whitehole
Comment:
Deletions are marked like this. Additions are marked like this.
Line 12: Line 12:
 . 7月16日(水) 15:00-16:30 天文台輪講室   . 7月16日(水) 15:00-16:30 天文台輪講室
Line 17: Line 17:
 . 6月3日(水) 17:00-19:00 天文台輪講室 [[attachment:LCGT/subgroup/vis/minutes1.pdf|議事録]]
 [[attachment:LCGT/subgroup/vis/agenda1.pdf|作業班、スケジュール]]
 . 6月3日(水) 17:00-19:00 天文台輪講室 ([[attachment:LCGT/subgroup/vis/minutes1.pdf|議事録]])
 . [[attachment:LCGT/subgroup/vis/agenda1.pdf|作業班、スケジュール]]
Line 28: Line 28:

=== Seismic spectrum in Kamioka mine ===
 . [[attachment:LCGT/subgroup/ifo/SPI/HeatLink/0702seis_Araya.zip|In loud day]]
 . [[attachment:CLIO/NoiseBudgets/seismic/cryo_seismic.txt|In cryostat]]

PROJECT TOP

GW Analysis

Interferometer

Vacuum & Cryostat

Laser & Optics

Seismic Isolator

Infrastructure

防振系

  • 常温防振+ヒートリンク+低温懸架
  • リーダー: 高橋竜太郎 (NAOJ)
  • サブリーダー: 内山隆 (ICRR)、三代木伸二 (ICRR)

第2回LCGT防振系作業部会

第1回LCGT防振系作業部会

TAMA SAS の問題点

TAMA Double Pendulum の問題点

Seismic spectrum in Kamioka mine

KAGRA/Subgroups/VIS (last edited 2022-02-25 19:10:23 by HirotakaYuzurihara)