Differences between revisions 35 and 173 (spanning 138 versions)
Revision 35 as of 2009-07-15 15:55:21
Size: 1333
Comment:
Revision 173 as of 2016-02-29 13:30:21
Size: 1220
Editor: NaokoOhishi
Comment:
Deletions are marked like this. Additions are marked like this.
Line 1: Line 1:
||'''[[LCGT|PROJECT TOP]]''' ||[[LCGT/subgroup/analysis|GW Analysis]] ||[[LCGT/subgroup/ifo|Interferometer]] ||[[LCGT/subgroup/vacuum|Vacuum & Cryostat]] ||[[LCGT/subgroup/laser|Laser & Optics]] ||[[LCGT/subgroup/vis|Seismic Isolator]] ||[[LCGT/subgroup/infra|Infrastructure]] ||

## page was renamed from LCGT/subgroup/vis
Line 6: Line 4:
== 防振系 ==
 . 常温防振+ヒートリンク+低温懸架
 . リーダー: 高橋竜太郎 (NAOJ)
 . サブリーダー: 内山隆 (ICRR)、三代木伸二 (ICRR)
== Vibration Isolation ==
 . Chief: R. Takahashi (NAOJ)
 . Member: N. Ohishi, H. Ishizaki, F. E. Pena Arellano, M. Barton, N. Hirata, R. Flaminio, Y. Aso, T. Akutsu (NAOJ),
 T. Sekiguchi, K. Yamamoto, T. Uchiyama (ICRR), R. DeSalvo (Univ. of Sannio), E. Majorana (INFN Rome), J. van den Brand, E. Hennes, A. Bertolini, J. van Heijningen, K. Agatsuma (NIKHEF)
Line 11: Line 9:
=== 第2回LCGT防振系作業部会 ===
 . 7月16日(水) 15:00-16:30 天文台輪講室
 [[attachment:LCGT/subgroup/vis/Modeling1.ppt|LCGT-SAS Modeling]]
 . [[attachment:LCGT/subgroup/vis/RandD.pdf|R&Dについて]]
----
== VIS Meeting ==
 . Every Friday, from 13:30 (JST)
 . [[KAGRA/Subgroups/VIS/MeetingNAOJ|Meeting Page]]
Line 16: Line 14:
=== 第1回LCGT防振系作業部会 ===
 . 6月3日(水) 17:00-19:00 天文台輪講室 [[attachment:LCGT/subgroup/vis/minutes1.pdf|議事録]]
 . [[attachment:LCGT/subgroup/vis/agenda1.pdf|作業班、スケジュール]]
 . [[attachment:LCGT/subgroup/vis/ICDsas.doc|ICD]] ([[attachment:ICDsas.pdf|PDF]])
 . [[attachment:LCGT/subgroup/vis/LCGT-SAS2.pdf|常温-低温接続部]]
 . R&Dについて (次回)
----
== Design ==
[[KAGRA/Subgroups/VIS/TypeA|Type-A]]
Line 23: Line 18:
=== TAMA SAS の問題点 ===
 . [[LCGT/subgroup/vis/tama_sas|Item list to be improved]]
[[KAGRA/Subgroups/VIS/TypeB|Type-B]]
Line 26: Line 20:
=== TAMA Double Pendulum の問題点 ===
 . [[LCGT/subgroup/vis/tama_double|Item list to be improved]]
[[KAGRA/Subgroups/VIS/TypeBp|Type-Bp]]

[[KAGRA/Subgroups/VIS/Type-C|Type-C]]

[[KAGRA/Subgroups/VIS/Payload|Payload]]

----
== Installation ==
 . [[KAGRA/Subgroups/VIS/IstManual|Installation Procedure]]
 . [[KAGRA/Subgroups/VIS/VISInstWorkInfo|Misc. Installation Work Information]]

 . [[KAGRA/Subgroups/VIS/iKAGRAbKAGRA|Tasks from iKAGRA to bKAGRA]]
----
== Operation ==
 . [[KAGRA/Subgroups/VIS/OpsManual|Operation Manual]]

----
== Old Weekly EVO Meeting ==
 . This meeting is suspended.

[[KAGRA/Subgroups/VIS/OldVISMeetings|Past minutes]]

Vibration Isolation

  • Chief: R. Takahashi (NAOJ)
  • Member: N. Ohishi, H. Ishizaki, F. E. Pena Arellano, M. Barton, N. Hirata, R. Flaminio, Y. Aso, T. Akutsu (NAOJ),

    T. Sekiguchi, K. Yamamoto, T. Uchiyama (ICRR), R. DeSalvo (Univ. of Sannio), E. Majorana (INFN Rome), J. van den Brand, E. Hennes, A. Bertolini, J. van Heijningen, K. Agatsuma (NIKHEF)


VIS Meeting


Design

Type-A

Type-B

Type-Bp

Type-C

Payload


Installation


Operation


Old Weekly EVO Meeting

  • This meeting is suspended.

Past minutes

KAGRA/Subgroups/VIS (last edited 2022-02-25 19:10:23 by HirotakaYuzurihara)