Differences between revisions 45 and 46
Revision 45 as of 2009-08-15 01:22:48
Size: 2083
Comment:
Revision 46 as of 2009-08-15 01:24:16
Size: 2083
Comment:
Deletions are marked like this. Additions are marked like this.
Line 39: Line 39:
=== Transfer function X0~7/Xg in the LCGT-SAS model ===
 . [[attachment:LCGT/subgroup/vis/model_trf.txt|TRF]]--( )--
=== The LCGT-SAS model ===
 . [[attachment:LCGT/subgroup/vis/model_trf.txt|Transfer function X0~X7/Xg (old)]]--( )--

PROJECT TOP

GW Analysis

Interferometer

Vacuum & Cryostat

Laser & Optics

Seismic Isolator

Infrastructure

防振系

  • 常温防振+ヒートリンク+低温懸架
  • リーダー: 高橋竜太郎 (NAOJ)
  • サブリーダー: 内山隆 (ICRR)、三代木伸二 (ICRR)

第3回LCGT防振系作業部会

第2回LCGT防振系作業部会

第1回LCGT防振系作業部会

TAMA SAS の問題点

TAMA Double Pendulum の問題点

Seismic spectrum in Kamioka mine

The LCGT-SAS model

KAGRA/Subgroups/VIS (last edited 2022-02-25 19:10:23 by HirotakaYuzurihara)