Differences between revisions 49 and 53 (spanning 4 versions)
Revision 49 as of 2009-08-17 12:30:07
Size: 2261
Comment:
Revision 53 as of 2009-09-03 11:12:17
Size: 2707
Comment:
Deletions are marked like this. Additions are marked like this.
Line 11: Line 11:
=== 第4回LCGT防振系作業部会 ===
 . 9月3日(木) 15:00-16:30 天文台輪講室
 . [[attachment:LCGT/subgroup/vis/Modeling3.ppt|LCGT-SAS Modeling 3 (Gain boost)]]
 . [[attachment:LCGT/subgroup/vis/Modeling4.pdf|LCGT-SAS Modeling 4 (Vertical, Pitch)]]
Line 12: Line 17:
 . 8月6日(木) 15:00-16:30 天文台輪講室
 [[attachment:LCGT/subgroup/vis/Modeling2.ppt|LCGT-SAS Modeling 2]]
 . 8月6日(木) 15:00-16:30 天文台輪講室 ([[attachment:LCGT/subgroup/vis/minutes3.pdf|議事録]])
 . [[attachment:LCGT/subgroup/vis/Modeling2.ppt|LCGT-SAS Modeling 2]]
Line 41: Line 46:
 . Modeling M-file --([[attachment:LCGT/subgroup/vis/model_mfile.zip|(2009/8/15)]])--)
 . Spectrum of displacement --(
[[attachment:LCGT/subgroup/vis/model_disp.zip|(2009/8/15)]])--
 . Modeling M-file --([[attachment:LCGT/subgroup/vis/model_mfile.zip|(2009/8/15)]])--[[attachment:LCGT/subgroup/vis/model_mfile2.zip|(2009/8/17)]]
 . Spectrum of displacement --([[attachment:LCGT/subgroup/vis/model_
disp.zip|(2009/8/15)]])--[[attachment:LCGT/subgroup/vis/model_disp2.zip|(2009/8/17)]]

PROJECT TOP

GW Analysis

Interferometer

Vacuum & Cryostat

Laser & Optics

Seismic Isolator

Infrastructure

防振系

  • 常温防振+ヒートリンク+低温懸架
  • リーダー: 高橋竜太郎 (NAOJ)
  • サブリーダー: 内山隆 (ICRR)、三代木伸二 (ICRR)

第4回LCGT防振系作業部会

第3回LCGT防振系作業部会

第2回LCGT防振系作業部会

第1回LCGT防振系作業部会

TAMA SAS の問題点

TAMA Double Pendulum の問題点

Seismic spectrum in Kamioka mine

LCGT-SAS model

KAGRA/Subgroups/VIS (last edited 2022-02-25 19:10:23 by HirotakaYuzurihara)