Differences between revisions 60 and 76 (spanning 16 versions)
Revision 60 as of 2009-10-08 13:38:24
Size: 3109
Comment:
Revision 76 as of 2011-02-24 14:16:59
Size: 3708
Comment:
Deletions are marked like this. Additions are marked like this.
Line 7: Line 7:
 . 常温防振+ヒートリンク+低温懸架
Line 9: Line 8:
 . サブリーダー: 内山隆 (ICRR)、三代木伸二 (ICRR)
=== 第6回LCGT防振系作業部会 ===
 . 11月12日(木) 15:00-16:30 天文台輪講室
 . [[attachment:LCGT/subgroup/vis/Modeling6.ppt|Model vs. Measurement in TAMA-SAS]]
 . [[attachment:LCGT/subgroup/vis/chamber-AB.pdf|Design of Type-A,B chamber (rev.)]]

=== 第5回LCGT防振系作業部会 ===
 . --(10月8日(木) 15:00-16:30 天文台輪講室)--
 . 10月15日(木) 13:00-14:30 天文台大会議室 ([[attachment:LCGT/subgroup/vis/minutes5.pdf|議事録]])
 . [[attachment:LCGT/subgroup/vis/Modeling5.ppt|LCGT-SAS Modeling 5 (Type-B,C)]]
 . [[attachment:LCGT/subgroup/vis/chamber-A.pdf|Design of Type-A chamber]]
Line 39: Line 48:
 . [[attachment:LCGT/subgroup/vis/Report2009.ppt|Evaluation of TAMA-SAS for LCGT]]

PROJECT TOP

GW Analysis

Interferometer

Vacuum & Cryostat

Laser & Optics

Seismic Isolator

Infrastructure

防振系

  • リーダー: 高橋竜太郎 (NAOJ)

第6回LCGT防振系作業部会

第5回LCGT防振系作業部会

LCGT防振系作業部会ブレーンストーミング

  • 10月1日(木) 13:00-15:00 東京大学理学部1号館445号室 (議事録)

  • メモ

第4回LCGT防振系作業部会

第3回LCGT防振系作業部会

第2回LCGT防振系作業部会

第1回LCGT防振系作業部会

TAMA SAS の問題点

TAMA Double Pendulum の問題点

Seismic spectrum in Kamioka mine

LCGT-SAS model

KAGRA/Subgroups/VIS (last edited 2022-02-25 19:10:23 by HirotakaYuzurihara)