3744
Comment:
|
5744
|
Deletions are marked like this. | Additions are marked like this. |
Line 6: | Line 6: |
== 防振系 == . 常温防振+ヒートリンク+低温懸架 . リーダー: 高橋竜太郎 (NAOJ) . サブリーダー: 内山隆 (ICRR)、三代木伸二 (ICRR) |
== Vibration Isolation == . Chief: R. Takahashi(ICRR) . Member: T. Uchiyama(ICRR), R. De''''''Salvo(Univ. of Sannio), H. Ishizaki(NAOJ), A. Takamori(ERI), E. Majorana(INFN), T. Sekiguchi(ICRR), K. Yamamoto(ICRR) |
Line 11: | Line 10: |
=== 第6回LCGT防振系作業部会 === | ---- == Weekly EVO Meeting == . Every Wednesday, 21:00(JST) === The 13th (22 June, 2011) === === The 12th (15 June, 2011) === === The 11th (8 June, 2011) === . [[attachment:LCGT/subgroup/vis/minute0608.pdf|Minute]] === The 10th (1 June, 2011) === . [[attachment:LCGT/subgroup/vis/damping0601.pdf|Mode damping study by Takanori]] === The 9th (25 May, 2011) === === The 8th (18 May, 2011) === . [[attachment:LCGT/subgroup/vis/magicwand.png|Magic wands by Takanori]] . [[attachment:LCGT/subgroup/vis/Check110512.pdf|Heavier test mass by Ettore and Takanori]] === The 7th (11 May, 2011) === . [[attachment:LCGT/subgroup/vis/rep110511.pdf|Report by Takanori]] === The 6th (27 April, 2011) === . [[attachment:LCGT/subgroup/vis/dimension110427.docx|Payload dimensions by Riccardo]] === The 5th (20 April, 2011) === . [[attachment:LCGT/subgroup/vis/3D_model.pdf|Parameter Configuration by Ettore]] === (11 April, 2011) === . [[attachment:LCGT/subgroup/vis/LCGT_PAY_10-30.pdf|Parameter Configuration by Ettore]] === The 4th (6 April, 2011) === . [[attachment:LCGT/subgroup/vis/10-30_April06.docx|Simulation by Ettore]] . [[attachment:LCGT/subgroup/vis/sequence110406.pdf|Installation sequence by Riccardo]] === The 3rd (30 March, 2011) === . [[attachment:LCGT/subgroup/vis/coordinate110330.pdf|Coordinate system by Ryutaro]] . [[attachment:LCGT/subgroup/vis/110330_isasA.pdf|Simulation by Takanori]] === The 2nd (23 March, 2011) === . [[attachment:LCGT/subgroup/vis/memo110323.txt|Comments by Riccardo]] . [[attachment:LCGT/subgroup/vis/report110323.doc|Status report by Riccardo]] . [[attachment:LCGT/subgroup/vis/sim110323.pptx|Simulation by Ettore]] === The 1st (16 March, 2011) === . [[attachment:LCGT/subgroup/vis/Tower-a.pdf|Design for Type-A system]] . [[attachment:LCGT/subgroup/vis/filter-chain.pdf|Detail of filter's chain]] ---- == LCGT防振系作業部会(2009) == === 第6回 === |
Line 14: | Line 64: |
. [[attachment:LCGT/subgroup/vis/chamber-A2.pdf|Design of Type-A chamber (rev.)]] | . [[attachment:LCGT/subgroup/vis/chamber-AB.pdf|Design of Type-A,B chamber (rev.)]] |
Line 16: | Line 66: |
=== 第5回LCGT防振系作業部会 === . --(10月8日(木) 15:00-16:30 天文台輪講室)-- |
=== 第5回 === |
Line 22: | Line 71: |
=== LCGT防振系作業部会ブレーンストーミング === | === ブレーンストーミング === |
Line 26: | Line 75: |
=== 第4回LCGT防振系作業部会 === | === 第4回 === |
Line 32: | Line 81: |
=== 第3回LCGT防振系作業部会 === | === 第3回 === |
Line 37: | Line 86: |
=== 第2回LCGT防振系作業部会 === | === 第2回 === |
Line 42: | Line 91: |
=== 第1回LCGT防振系作業部会 === | === 第1回 === |
Line 49: | Line 98: |
=== TAMA SAS の問題点 === | ---- == Archive == === TAMA SAS === . [[attachment:LCGT/subgroup/vis/Report2009.ppt|Evaluation of TAMA-SAS for LCGT]] |
Line 53: | Line 106: |
=== TAMA Double Pendulum の問題点 === | === TAMA Double Pendulum === |
Line 64: | Line 117: |
=== Finite Element Analysis === . [[LCGT/subgroup/vis/FEM|FEM Page]] === Rigid-Body Models === . [[LCGT/subgroup/vis/Simulation|Simulation Page]] |
Contents
- Vibration Isolation
-
Weekly EVO Meeting
- The 13th (22 June, 2011)
- The 12th (15 June, 2011)
- The 11th (8 June, 2011)
- The 10th (1 June, 2011)
- The 9th (25 May, 2011)
- The 8th (18 May, 2011)
- The 7th (11 May, 2011)
- The 6th (27 April, 2011)
- The 5th (20 April, 2011)
- (11 April, 2011)
- The 4th (6 April, 2011)
- The 3rd (30 March, 2011)
- The 2nd (23 March, 2011)
- The 1st (16 March, 2011)
- LCGT防振系作業部会(2009)
- Archive
Vibration Isolation
- Chief: R. Takahashi(ICRR)
Member: T. Uchiyama(ICRR), R. DeSalvo(Univ. of Sannio), H. Ishizaki(NAOJ), A. Takamori(ERI), E. Majorana(INFN), T. Sekiguchi(ICRR), K. Yamamoto(ICRR)
Weekly EVO Meeting
- Every Wednesday, 21:00(JST)
The 13th (22 June, 2011)
The 12th (15 June, 2011)
The 11th (8 June, 2011)
The 10th (1 June, 2011)
The 9th (25 May, 2011)
The 8th (18 May, 2011)
The 7th (11 May, 2011)
The 6th (27 April, 2011)
The 5th (20 April, 2011)
(11 April, 2011)
The 4th (6 April, 2011)
The 3rd (30 March, 2011)
The 2nd (23 March, 2011)
The 1st (16 March, 2011)
LCGT防振系作業部会(2009)
第6回
- 11月12日(木) 15:00-16:30 天文台輪講室
第5回
10月15日(木) 13:00-14:30 天文台大会議室 (議事録)
ブレーンストーミング
第4回
9月3日(木) 15:00-16:30 天文台輪講室 (議事録)
第3回
8月6日(木) 15:00-16:30 天文台輪講室 (議事録)
第2回
7月16日(木) 15:00-16:30 天文台輪講室 (議事録)
第1回
6月3日(水) 17:00-19:00 天文台輪講室 (議事録)
R&Dについて (次回)
Archive
TAMA SAS
TAMA Double Pendulum
Seismic spectrum in Kamioka mine
In loud day (This data should be used as nominal ground motion in Kamioka)
LCGT-SAS model
Transfer function X0~X7/Xg (old)
Modeling M-file (2009/8/15)(2009/8/17)
Spectrum of displacement (2009/8/15)(2009/8/17)
Finite Element Analysis