Differences between revisions 79 and 82 (spanning 3 versions)
Revision 79 as of 2011-03-23 12:43:35
Size: 3922
Comment:
Revision 82 as of 2011-03-23 12:54:53
Size: 4266
Comment:
Deletions are marked like this. Additions are marked like this.
Line 8: Line 8:
 . Member: T. Uchiyama(ICRR)、R. DeSalvo(Univ. of Sannio)、H. Ishizaki(NAOJ)、A. Takamori(ERI)、E. Majorana(INFN)、T. Sekiguchi(ICRR)  . Member: T. Uchiyama(ICRR)、R. De''''''Salvo(Univ. of Sannio)、H. Ishizaki(NAOJ)、A. Takamori(ERI)、E. Majorana(INFN)、T. Sekiguchi(ICRR)

=== The 2nd EVO Meeting ===
 . 23 March 21:00
 . [[attachment:LCGT/subgroup/vis/report110323.doc|Status report by De''''''Salvo]]

=== The 1st EVO Meeting ===
 . 16 March 21:00
 . [[attachment:LCGT/subgroup/vis/Tower-a.pdf|Design for Type-A system]]
 . [[attachment:LCGT/subgroup/vis/filter-chain.pdf|Detail of filter's chain]]

PROJECT TOP

GW Analysis

Interferometer

Vacuum & Cryostat

Laser & Optics

Seismic Isolator

Infrastructure

Vibration Isolation

  • Chief: R. Takahashi(ICRR)
  • Member: T. Uchiyama(ICRR)、R. DeSalvo(Univ. of Sannio)、H. Ishizaki(NAOJ)、A. Takamori(ERI)、E. Majorana(INFN)、T. Sekiguchi(ICRR)

The 2nd EVO Meeting

The 1st EVO Meeting

第6回LCGT防振系作業部会

第5回LCGT防振系作業部会

LCGT防振系作業部会ブレーンストーミング

  • 10月1日(木) 13:00-15:00 東京大学理学部1号館445号室 (議事録)

  • メモ

第4回LCGT防振系作業部会

第3回LCGT防振系作業部会

第2回LCGT防振系作業部会

第1回LCGT防振系作業部会

TAMA SAS の問題点

TAMA Double Pendulum の問題点

Seismic spectrum in Kamioka mine

LCGT-SAS model

Finite Element Analysis

FEM Page

KAGRA/Subgroups/VIS (last edited 2022-02-25 19:10:23 by HirotakaYuzurihara)