Differences between revisions 81 and 106 (spanning 25 versions)
Revision 81 as of 2011-03-23 12:49:25
Size: 4129
Comment:
Revision 106 as of 2011-04-20 21:09:12
Size: 4911
Comment:
Deletions are marked like this. Additions are marked like this.
Line 8: Line 8:
 . Member: T. Uchiyama(ICRR)R. De''''''Salvo(Univ. of Sannio)H. Ishizaki(NAOJ)A. Takamori(ERI)E. Majorana(INFN)T. Sekiguchi(ICRR)  . Member: T. Uchiyama(ICRR), R. De''''''Salvo(Univ. of Sannio), H. Ishizaki(NAOJ), A. Takamori(ERI), E. Majorana(INFN), T. Sekiguchi(ICRR), K. Yamamoto(ICRR)
Line 10: Line 10:
=== The 1st EVO Meeting ===
 . 16 March 21:00
----
== Weekly EVO Meeting ==
 . Every Wednesday, 21:00(JST)

=== The 5th (20 April, 2011) ===
 . [[attachment:LCGT/subgroup/vis/3D_model.pdf|Parameter Configuration by Ettore]]

=== (11 April, 2011) ===
 . [[attachment:LCGT/subgroup/vis/LCGT_PAY_10-30.pdf|Parameter Configuration by Ettore]]

=== The 4th (6 April, 2011) ===
 . [[attachment:LCGT/subgroup/vis/10-30_April06.docx|Simulation by Ettore]]
 . [[attachment:LCGT/subgroup/vis/sequence110406.pdf|Installation sequence by Riccardo]]

=== The 3rd (30 March, 2011) ===
 . [[attachment:LCGT/subgroup/vis/coordinate110330.pdf|Coordinate system by Ryutaro]]
 . [[attachment:LCGT/subgroup/vis/110330_isasA.pdf|Simulation by Takanori]]

=== The 2nd (23 March, 2011) ===
 . [[attachment:LCGT/subgroup/vis/memo110323.txt|Comments by Riccardo]]
 . [[attachment:LCGT/subgroup/vis/report110323.doc|Status report by Riccardo]]
 . [[attachment:LCGT/subgroup/vis/sim110323.pptx|Simulation by Ettore]]

=== The 1st (16 March, 2011) ===
Line 13: Line 35:
 . [[attachment:LCGT/subgroup/vis/filter-chain.pdf|Detail of filter chain]]  . [[attachment:LCGT/subgroup/vis/filter-chain.pdf|Detail of filter's chain]]
Line 15: Line 37:
=== 第6回LCGT防振系作業部会 === ----
== LCGT防振系作業部会(2009) ==
=== 第6回
===
Line 20: Line 44:
=== 第5回LCGT防振系作業部会 ===
 . --(10月8日(木) 15:00-16:30 天文台輪講室)--
=== 第5回 ===
Line 26: Line 49:
=== LCGT防振系作業部会ブレーンストーミング === === ブレーンストーミング ===
Line 30: Line 53:
=== 第4回LCGT防振系作業部会 === === 第4回 ===
Line 36: Line 59:
=== 第3回LCGT防振系作業部会 === === 第3回 ===
Line 41: Line 64:
=== 第2回LCGT防振系作業部会 === === 第2回 ===
Line 46: Line 69:
=== 第1回LCGT防振系作業部会 === === 第1回 ===
Line 53: Line 76:
=== TAMA SAS の問題点 === ----
== Archive ==

=== TAMA SAS ===
Line 58: Line 84:
=== TAMA Double Pendulum の問題点 === === TAMA Double Pendulum ===
Line 70: Line 96:
==== Finite Element Analysis ====
[[LCGT/subgroup/vis/FEM|FEM Page]]
=== Finite Element Analysis ===
 . [[LCGT/subgroup/vis/FEM|FEM Page]]

PROJECT TOP

GW Analysis

Interferometer

Vacuum & Cryostat

Laser & Optics

Seismic Isolator

Infrastructure

Vibration Isolation

  • Chief: R. Takahashi(ICRR)
  • Member: T. Uchiyama(ICRR), R. DeSalvo(Univ. of Sannio), H. Ishizaki(NAOJ), A. Takamori(ERI), E. Majorana(INFN), T. Sekiguchi(ICRR), K. Yamamoto(ICRR)


Weekly EVO Meeting

  • Every Wednesday, 21:00(JST)

The 5th (20 April, 2011)

(11 April, 2011)

The 4th (6 April, 2011)

The 3rd (30 March, 2011)

The 2nd (23 March, 2011)

The 1st (16 March, 2011)


LCGT防振系作業部会(2009)

第6回

第5回

ブレーンストーミング

  • 10月1日(木) 13:00-15:00 東京大学理学部1号館445号室 (議事録)

  • メモ

第4回

第3回

第2回

第1回


Archive

TAMA SAS

TAMA Double Pendulum

Seismic spectrum in Kamioka mine

LCGT-SAS model

Finite Element Analysis

KAGRA/Subgroups/VIS (last edited 2022-02-25 19:10:23 by HirotakaYuzurihara)