4261
Comment:
|
7798
|
Deletions are marked like this. | Additions are marked like this. |
Line 1: | Line 1: |
||'''[[LCGT|PROJECT TOP]]''' ||[[LCGT/subgroup/analysis|GW Analysis]] ||[[LCGT/subgroup/ifo|Interferometer]] ||[[LCGT/subgroup/vacuum|Vacuum & Cryostat]] ||[[LCGT/subgroup/laser|Laser & Optics]] ||[[LCGT/subgroup/vis|Seismic Isolator]] ||[[LCGT/subgroup/infra|Infrastructure]] || |
## page was renamed from LCGT/subgroup/vis |
Line 8: | Line 6: |
. Member: T. Uchiyama(ICRR)、R. De''''''Salvo(Univ. of Sannio)、H. Ishizaki(NAOJ)、A. Takamori(ERI)、E. Majorana(INFN)、T. Sekiguchi(ICRR) | . Member: T. Uchiyama(ICRR), R. DeSalvo(Univ. of Sannio), H. Ishizaki(NAOJ), A. Takamori(ERI), E. Majorana(INFN), T. Sekiguchi(ICRR), K. Yamamoto(ICRR) |
Line 10: | Line 8: |
=== The 2nd EVO Meeting === . 23 March 21:00 . [[attachment:LCGT/subgroup/vis/report110323.doc|Status report by Riccardo]] |
---- == NAOJ VI Meeting == . Every Wednesday, from 15:00 (JST) . [[KAGRA/Subgroups/VIS/MeetingNAOJ|Meeting Page]] |
Line 14: | Line 13: |
=== The 1st EVO Meeting === . 16 March 21:00 . [[attachment:LCGT/subgroup/vis/Tower-a.pdf|Design for Type-A system]] . [[attachment:LCGT/subgroup/vis/filter-chain.pdf|Detail of filter's chain]] |
|
Line 19: | Line 14: |
=== 第6回LCGT防振系作業部会 === | ---- == Weekly EVO Meeting == . Every Wednesday, 21:00(JST) === The ??th (19 September, 2012) === . No meeting === The ??th (12 September, 2012) === . [[attachment:KAGRAvi_minute_2012Sep12.txt|Minute]] === The ??th (5 September, 2012) === . [[attachment:KAGRAvi_minute_2012Sep05.txt|Minute]] === The ??th (29 August, 2012) === . [[attachment:KAGRAvi_minute_2012Aug29.txt|Minute]] === The ??th (22 August, 2012) === . [[attachment:KAGRAvi_minute_2012Aug22.txt|Minute]] === The ??th (15 August, 2012) === . No meeting (summer vacation) === The ??th (8 August, 2012) === . [[attachment:KAGRAvi_minute_2012Aug08.txt|Minute]] === The ??th (1 August, 2012) === . [[attachment:KAGRAvi_minute_2012Aug01.txt|Minute]] === The 24th (28 September, 2011) === . [[attachment:KAGRA/Subgroups/VIS/modal_0928.pdf|Modal Analysis of Tripod by Takanori]] === The 23th (15 September, 2011) === . [[attachment:KAGRA/Subgroups/VIS/TypeB_sim_0915.pdf|Simulation on TypeB by Takanori]] === The 22th (7 September, 2011) === . [[attachment:KAGRA/Subgroups/VIS/Type-B_system_rycy.pdf|Z-Assembly for RM by Riccardo]] . [[attachment:KAGRA/Subgroups/VIS/Type-B_system_bs.pdf|Z-Assembly for BS by Riccardo]] . [[attachment:KAGRA/Subgroups/VIS/TypeB_sim_0907.pdf|Simulation on TypeB by Takanori]] === The 21th (31 August, 2011) === === The 20th (24 August, 2011) === === The 19th (10 August, 2011) === === The 18th (27 July, 2011) === . [[attachment:KAGRA/Subgroups/VIS/PayloadB_0727.pdf|Design of Type-B payload by Riccardo]] === The 17th (20 July, 2011) === === The 16th (13 July, 2011) === . [[attachment:KAGRA/Subgroups/VIS/SR2-PR2_0711.pdf|SR2-PR2 recoil mass by Riccardo]] . [[attachment:KAGRA/Subgroups/VIS/angle_0713.pdf|Angular fluctuation of TM by Takanori]] === The 15th (6 July, 2011) === . [[attachment:KAGRA/Subgroups/VIS/2type_0701.pdf|Type-B payload model by Sekiguchi]] === The 14th (29 June, 2011) === . [[attachment:KAGRA/Subgroups/VIS/kapton_0627.pdf|Kapton Wire by Sekiguchi]] === The 13th (22 June, 2011) === . [[http://tamago.mtk.nao.ac.jp/ishizaki/LCGT/kaptonwire/cable.pdf|Kapton Wire by Ishizaki]] === The 12th (15 June, 2011) === === The 11th (8 June, 2011) === . [[attachment:KAGRA/Subgroups/VIS/minute0608.pdf|Minute]] === The 10th (1 June, 2011) === . [[attachment:KAGRA/Subgroups/VIS/damping0601.pdf|Mode damping study by Takanori]] === The 9th (25 May, 2011) === === The 8th (18 May, 2011) === . [[attachment:KAGRA/Subgroups/VIS/magicwand.png|Magic wands by Takanori]] . [[attachment:KAGRA/Subgroups/VIS/Check110512.pdf|Heavier test mass by Ettore and Takanori]] === The 7th (11 May, 2011) === . [[attachment:KAGRA/Subgroups/VIS/rep110511.pdf|Report by Takanori]] === The 6th (27 April, 2011) === . [[attachment:KAGRA/Subgroups/VIS/dimension110427.docx|Payload dimensions by Riccardo]] === The 5th (20 April, 2011) === . [[attachment:KAGRA/Subgroups/VIS/3D_model.pdf|Parameter Configuration by Ettore]] === (11 April, 2011) === . [[attachment:KAGRA/Subgroups/VIS/LCGT_PAY_10-30.pdf|Parameter Configuration by Ettore]] === The 4th (6 April, 2011) === . [[attachment:KAGRA/Subgroups/VIS/10-30_April06.docx|Simulation by Ettore]] . [[attachment:KAGRA/Subgroups/VIS/sequence110406.pdf|Installation sequence by Riccardo]] === The 3rd (30 March, 2011) === . [[attachment:KAGRA/Subgroups/VIS/coordinate110330.pdf|Coordinate system by Ryutaro]] . [[attachment:KAGRA/Subgroups/VIS/110330_isasA.pdf|Simulation by Takanori]] === The 2nd (23 March, 2011) === . [[attachment:KAGRA/Subgroups/VIS/memo110323.txt|Comments by Riccardo]] . [[attachment:KAGRA/Subgroups/VIS/report110323.doc|Status report by Riccardo]] . [[attachment:KAGRA/Subgroups/VIS/sim110323.pptx|Simulation by Ettore]] === The 1st (16 March, 2011) === . [[attachment:KAGRA/Subgroups/VIS/Tower-a.pdf|Design for Type-A system]] . [[attachment:KAGRA/Subgroups/VIS/filter-chain.pdf|Detail of filter's chain]] ---- == LCGT防振系作業部会(2009) == === 第6回 === |
Line 21: | Line 118: |
. [[attachment:LCGT/subgroup/vis/Modeling6.ppt|Model vs. Measurement in TAMA-SAS]] . [[attachment:LCGT/subgroup/vis/chamber-AB.pdf|Design of Type-A,B chamber (rev.)]] |
. [[attachment:KAGRA/Subgroups/VIS/Modeling6.ppt|Model vs. Measurement in TAMA-SAS]] . [[attachment:KAGRA/Subgroups/VIS/chamber-AB.pdf|Design of Type-A,B chamber (rev.)]] |
Line 24: | Line 121: |
=== 第5回LCGT防振系作業部会 === . --(10月8日(木) 15:00-16:30 天文台輪講室)-- . 10月15日(木) 13:00-14:30 天文台大会議室 ([[attachment:LCGT/subgroup/vis/minutes5.pdf|議事録]]) . [[attachment:LCGT/subgroup/vis/Modeling5.ppt|LCGT-SAS Modeling 5 (Type-B,C)]] . [[attachment:LCGT/subgroup/vis/chamber-A.pdf|Design of Type-A chamber]] |
=== 第5回 === . 10月15日(木) 13:00-14:30 天文台大会議室 ([[attachment:KAGRA/Subgroups/VIS/minutes5.pdf|議事録]]) . [[attachment:KAGRA/Subgroups/VIS/Modeling5.ppt|LCGT-SAS Modeling 5 (Type-B,C)]] . [[attachment:KAGRA/Subgroups/VIS/chamber-A.pdf|Design of Type-A chamber]] |
Line 30: | Line 126: |
=== LCGT防振系作業部会ブレーンストーミング === . 10月1日(木) 13:00-15:00 東京大学理学部1号館445号室 ([[attachment:LCGT/subgroup/vis/minutes-b.pdf|議事録]]) . [[attachment:LCGT/subgroup/vis/brest.pdf|メモ]] |
=== ブレーンストーミング === . 10月1日(木) 13:00-15:00 東京大学理学部1号館445号室 ([[attachment:KAGRA/Subgroups/VIS/minutes-b.pdf|議事録]]) . [[attachment:KAGRA/Subgroups/VIS/brest.pdf|メモ]] |
Line 34: | Line 130: |
=== 第4回LCGT防振系作業部会 === . 9月3日(木) 15:00-16:30 天文台輪講室 ([[attachment:LCGT/subgroup/vis/minutes4.pdf|議事録]]) . [[attachment:LCGT/subgroup/vis/Modeling3.ppt|LCGT-SAS Modeling 3 (Gain boost)]] . [[attachment:LCGT/subgroup/vis/Modeling4.pdf|LCGT-SAS Modeling 4 (Vertical, Pitch)]] . [[attachment:LCGT/subgroup/vis/ICDsas2.doc|ICD update]] ([[attachment:ICDsas2.pdf|PDF]]) |
=== 第4回 === . 9月3日(木) 15:00-16:30 天文台輪講室 ([[attachment:KAGRA/Subgroups/VIS/minutes4.pdf|議事録]]) . [[attachment:KAGRA/Subgroups/VIS/Modeling3.ppt|LCGT-SAS Modeling 3 (Gain boost)]] . [[attachment:KAGRA/Subgroups/VIS/Modeling4.pdf|LCGT-SAS Modeling 4 (Vertical, Pitch)]] . [[attachment:KAGRA/Subgroups/VIS/ICDsas2.doc|ICD update]] ([[attachment:ICDsas2.pdf|PDF]]) |
Line 40: | Line 136: |
=== 第3回LCGT防振系作業部会 === . 8月6日(木) 15:00-16:30 天文台輪講室 ([[attachment:LCGT/subgroup/vis/minutes3.pdf|議事録]]) . [[attachment:LCGT/subgroup/vis/Modeling2.ppt|LCGT-SAS Modeling 2]] . [[attachment:LCGT/subgroup/vis/RandD2.pdf|低温懸架のR&Dについて]] |
=== 第3回 === . 8月6日(木) 15:00-16:30 天文台輪講室 ([[attachment:KAGRA/Subgroups/VIS/minutes3.pdf|議事録]]) . [[attachment:KAGRA/Subgroups/VIS/Modeling2.ppt|LCGT-SAS Modeling 2]] . [[attachment:KAGRA/Subgroups/VIS/RandD2.pdf|低温懸架のR&Dについて]] |
Line 45: | Line 141: |
=== 第2回LCGT防振系作業部会 === . 7月16日(木) 15:00-16:30 天文台輪講室 ([[attachment:LCGT/subgroup/vis/minutes2.pdf|議事録]]) . [[attachment:LCGT/subgroup/vis/Modeling1.ppt|LCGT-SAS Modeling]] . [[attachment:LCGT/subgroup/vis/RandD.pdf|LCGT-SASのR&Dについて]] |
=== 第2回 === . 7月16日(木) 15:00-16:30 天文台輪講室 ([[attachment:KAGRA/Subgroups/VIS/minutes2.pdf|議事録]]) . [[attachment:KAGRA/Subgroups/VIS/Modeling1.ppt|LCGT-SAS Modeling]] . [[attachment:KAGRA/Subgroups/VIS/RandD.pdf|LCGT-SASのR&Dについて]] |
Line 50: | Line 146: |
=== 第1回LCGT防振系作業部会 === . 6月3日(水) 17:00-19:00 天文台輪講室 ([[attachment:LCGT/subgroup/vis/minutes1.pdf|議事録]]) . [[attachment:LCGT/subgroup/vis/agenda1.pdf|作業班、スケジュール]] . [[attachment:LCGT/subgroup/vis/ICDsas.doc|ICD]] ([[attachment:ICDsas.pdf|PDF]]) . [[attachment:LCGT/subgroup/vis/LCGT-SAS2.pdf|常温-低温接続部]] |
=== 第1回 === . 6月3日(水) 17:00-19:00 天文台輪講室 ([[attachment:KAGRA/Subgroups/VIS/minutes1.pdf|議事録]]) . [[attachment:KAGRA/Subgroups/VIS/agenda1.pdf|作業班、スケジュール]] . [[attachment:KAGRA/Subgroups/VIS/ICDsas.doc|ICD]] ([[attachment:ICDsas.pdf|PDF]]) . [[attachment:KAGRA/Subgroups/VIS/LCGT-SAS2.pdf|常温-低温接続部]] |
Line 57: | Line 153: |
=== TAMA SAS の問題点 === . [[attachment:LCGT/subgroup/vis/Report2009.ppt|Evaluation of TAMA-SAS for LCGT]] |
---- == Archive == === TAMA SAS === . [[attachment:KAGRA/Subgroups/VIS/Report2009.ppt|Evaluation of TAMA-SAS for LCGT]] |
Line 60: | Line 158: |
. [[LCGT/subgroup/vis/tama_sas|Item list to be improved]] | . [[KAGRA/Subgroups/VIS/FEM/tama_sas|Item list to be improved]] |
Line 62: | Line 160: |
=== TAMA Double Pendulum の問題点 === | === TAMA Double Pendulum === |
Line 70: | Line 168: |
. Transfer function X0~X7/Xg --([[attachment:LCGT/subgroup/vis/model_trf.txt|(old)]])-- . Modeling M-file --([[attachment:LCGT/subgroup/vis/model_mfile.zip|(2009/8/15)]])--[[attachment:LCGT/subgroup/vis/model_mfile2.zip|(2009/8/17)]] . Spectrum of displacement --([[attachment:LCGT/subgroup/vis/model_disp.zip|(2009/8/15)]])--[[attachment:LCGT/subgroup/vis/model_disp2.zip|(2009/8/17)]] |
. Transfer function X0~X7/Xg --([[attachment:KAGRA/Subgroups/VIS/model_trf.txt|(old)]])-- . Modeling M-file --([[attachment:KAGRA/Subgroups/VIS/model_mfile.zip|(2009/8/15)]])--[[attachment:KAGRA/Subgroups/VIS/model_mfile2.zip|(2009/8/17)]] . Spectrum of displacement --([[attachment:KAGRA/Subgroups/VIS/model_disp.zip|(2009/8/15)]])--[[attachment:KAGRA/Subgroups/VIS/model_disp2.zip|(2009/8/17)]] |
Line 74: | Line 172: |
==== Finite Element Analysis ==== [[LCGT/subgroup/vis/FEM|FEM Page]] |
=== Finite Element Analysis === . [[KAGRA/Subgroups/VIS/FEM|FEM Page]] === Rigid-Body Models === . [[KAGRA/Subgroups/VIS/Simulation|Simulation Page]] |
Contents
- Vibration Isolation
- NAOJ VI Meeting
-
Weekly EVO Meeting
- The ??th (19 September, 2012)
- The ??th (12 September, 2012)
- The ??th (5 September, 2012)
- The ??th (29 August, 2012)
- The ??th (22 August, 2012)
- The ??th (15 August, 2012)
- The ??th (8 August, 2012)
- The ??th (1 August, 2012)
- The 24th (28 September, 2011)
- The 23th (15 September, 2011)
- The 22th (7 September, 2011)
- The 21th (31 August, 2011)
- The 20th (24 August, 2011)
- The 19th (10 August, 2011)
- The 18th (27 July, 2011)
- The 17th (20 July, 2011)
- The 16th (13 July, 2011)
- The 15th (6 July, 2011)
- The 14th (29 June, 2011)
- The 13th (22 June, 2011)
- The 12th (15 June, 2011)
- The 11th (8 June, 2011)
- The 10th (1 June, 2011)
- The 9th (25 May, 2011)
- The 8th (18 May, 2011)
- The 7th (11 May, 2011)
- The 6th (27 April, 2011)
- The 5th (20 April, 2011)
- (11 April, 2011)
- The 4th (6 April, 2011)
- The 3rd (30 March, 2011)
- The 2nd (23 March, 2011)
- The 1st (16 March, 2011)
- LCGT防振系作業部会(2009)
- Archive
Vibration Isolation
- Chief: R. Takahashi(ICRR)
Member: T. Uchiyama(ICRR), R. DeSalvo(Univ. of Sannio), H. Ishizaki(NAOJ), A. Takamori(ERI), E. Majorana(INFN), T. Sekiguchi(ICRR), K. Yamamoto(ICRR)
NAOJ VI Meeting
- Every Wednesday, from 15:00 (JST)
Weekly EVO Meeting
- Every Wednesday, 21:00(JST)
The ??th (19 September, 2012)
- No meeting
The ??th (12 September, 2012)
The ??th (5 September, 2012)
The ??th (29 August, 2012)
The ??th (22 August, 2012)
The ??th (15 August, 2012)
- No meeting (summer vacation)
The ??th (8 August, 2012)
The ??th (1 August, 2012)
The 24th (28 September, 2011)
The 23th (15 September, 2011)
The 22th (7 September, 2011)
The 21th (31 August, 2011)
The 20th (24 August, 2011)
The 19th (10 August, 2011)
The 18th (27 July, 2011)
The 17th (20 July, 2011)
The 16th (13 July, 2011)
The 15th (6 July, 2011)
The 14th (29 June, 2011)
The 13th (22 June, 2011)
The 12th (15 June, 2011)
The 11th (8 June, 2011)
The 10th (1 June, 2011)
The 9th (25 May, 2011)
The 8th (18 May, 2011)
The 7th (11 May, 2011)
The 6th (27 April, 2011)
The 5th (20 April, 2011)
(11 April, 2011)
The 4th (6 April, 2011)
The 3rd (30 March, 2011)
The 2nd (23 March, 2011)
The 1st (16 March, 2011)
LCGT防振系作業部会(2009)
第6回
- 11月12日(木) 15:00-16:30 天文台輪講室
第5回
10月15日(木) 13:00-14:30 天文台大会議室 (議事録)
ブレーンストーミング
第4回
9月3日(木) 15:00-16:30 天文台輪講室 (議事録)
第3回
8月6日(木) 15:00-16:30 天文台輪講室 (議事録)
第2回
7月16日(木) 15:00-16:30 天文台輪講室 (議事録)
第1回
6月3日(水) 17:00-19:00 天文台輪講室 (議事録)
R&Dについて (次回)
Archive
TAMA SAS
TAMA Double Pendulum
Seismic spectrum in Kamioka mine
In loud day (This data should be used as nominal ground motion in Kamioka)
LCGT-SAS model
Transfer function X0~X7/Xg (old)
Modeling M-file (2009/8/15)(2009/8/17)
Spectrum of displacement (2009/8/15)(2009/8/17)
Finite Element Analysis