Differences between revisions 88 and 92 (spanning 4 versions)
Revision 88 as of 2011-03-24 11:20:19
Size: 4403
Comment:
Revision 92 as of 2011-03-24 11:33:15
Size: 4301
Comment:
Deletions are marked like this. Additions are marked like this.
Line 8: Line 8:
 . Member: T. Uchiyama(ICRR)R. De''''''Salvo(Univ. of Sannio)H. Ishizaki(NAOJ)A. Takamori(ERI)E. Majorana(INFN)T. Sekiguchi(ICRR)  . Member: T. Uchiyama(ICRR), R. De''''''Salvo(Univ. of Sannio), H. Ishizaki(NAOJ), A. Takamori(ERI), E. Majorana(INFN), T. Sekiguchi(ICRR)
Line 10: Line 10:
=== The 2nd EVO Meeting ===
 . 23 March 21:00
----
== Weekly EVO Meeting ==
 . Every Wednesday, 21:00(JST)

=== The 2nd (23 March, 2011) ===
Line 16: Line 19:
=== The 1st EVO Meeting ===
 .
16 March 21:00
=== The 1st (16 March, 2011) ===
Line 22: Line 24:

=
== 第6回LCGT防振系作業部会 ===
== LCGT防振系作業部会(2009) ==
=== 第6回
===
Line 28: Line 30:
=== 第5回LCGT防振系作業部会 === === 第5回 ===
Line 34: Line 36:
=== LCGT防振系作業部会ブレーンストーミング === === ブレーンストーミング ===
Line 38: Line 40:
=== 第4回LCGT防振系作業部会 === === 第4回 ===
Line 44: Line 46:
=== 第3回LCGT防振系作業部会 === === 第3回 ===
Line 49: Line 51:
=== 第2回LCGT防振系作業部会 === === 第2回 ===
Line 54: Line 56:
=== 第1回LCGT防振系作業部会 === === 第1回 ===
Line 81: Line 83:
[[LCGT/subgroup/vis/FEM|FEM Page]]  . [[LCGT/subgroup/vis/FEM|FEM Page]]

PROJECT TOP

GW Analysis

Interferometer

Vacuum & Cryostat

Laser & Optics

Seismic Isolator

Infrastructure

Vibration Isolation

  • Chief: R. Takahashi(ICRR)
  • Member: T. Uchiyama(ICRR), R. DeSalvo(Univ. of Sannio), H. Ishizaki(NAOJ), A. Takamori(ERI), E. Majorana(INFN), T. Sekiguchi(ICRR)


Weekly EVO Meeting

  • Every Wednesday, 21:00(JST)

The 2nd (23 March, 2011)

The 1st (16 March, 2011)


LCGT防振系作業部会(2009)

第6回

第5回

ブレーンストーミング

  • 10月1日(木) 13:00-15:00 東京大学理学部1号館445号室 (議事録)

  • メモ

第4回

第3回

第2回

第1回


TAMA SAS

TAMA Double Pendulum

Seismic spectrum in Kamioka mine

LCGT-SAS model

Finite Element Analysis

KAGRA/Subgroups/VIS (last edited 2022-02-25 19:10:23 by HirotakaYuzurihara)