Differences between revisions 90 and 91
Revision 90 as of 2011-03-24 11:26:19
Size: 4281
Comment:
Revision 91 as of 2011-03-24 11:31:30
Size: 4299
Comment:
Deletions are marked like this. Additions are marked like this.
Line 10: Line 10:
=== The 2nd EVO Meeting ===
 . 23 March, 2011 21:00
== Weekly EVO Meeting ==
 . Every Wednesday, 21:00(JST)

=== The 2nd (
23 March, 2011) ===
Line 16: Line 18:
=== The 1st EVO Meeting ===
 .
16 March, 2011 21:00
=== The 1st (16 March, 2011) ===
Line 23: Line 24:
=== LCGT防振系作業部会(2009) === == LCGT防振系作業部会(2009) ==

PROJECT TOP

GW Analysis

Interferometer

Vacuum & Cryostat

Laser & Optics

Seismic Isolator

Infrastructure

Vibration Isolation

  • Chief: R. Takahashi(ICRR)
  • Member: T. Uchiyama(ICRR), R. DeSalvo(Univ. of Sannio), H. Ishizaki(NAOJ), A. Takamori(ERI), E. Majorana(INFN), T. Sekiguchi(ICRR)

Weekly EVO Meeting

  • Every Wednesday, 21:00(JST)

The 2nd (23 March, 2011)

The 1st (16 March, 2011)


LCGT防振系作業部会(2009)

第6回

第5回

ブレーンストーミング

  • 10月1日(木) 13:00-15:00 東京大学理学部1号館445号室 (議事録)

  • メモ

第4回

第3回

第2回

第1回


TAMA SAS

TAMA Double Pendulum

Seismic spectrum in Kamioka mine

LCGT-SAS model

Finite Element Analysis

KAGRA/Subgroups/VIS (last edited 2022-02-25 19:10:23 by HirotakaYuzurihara)