4299
Comment:
|
6870
|
Deletions are marked like this. | Additions are marked like this. |
Line 8: | Line 8: |
. Member: T. Uchiyama(ICRR), R. De''''''Salvo(Univ. of Sannio), H. Ishizaki(NAOJ), A. Takamori(ERI), E. Majorana(INFN), T. Sekiguchi(ICRR) | . Member: T. Uchiyama(ICRR), R. De''''''Salvo(Univ. of Sannio), H. Ishizaki(NAOJ), A. Takamori(ERI), E. Majorana(INFN), T. Sekiguchi(ICRR), K. Yamamoto(ICRR) |
Line 10: | Line 10: |
---- | |
Line 12: | Line 13: |
=== The 22th (7 September, 2011) === . [[attachment:LCGT/subgroup/vis/Type-B_system_rycy.pdf|Z-Assembly for RM by Riccardo]] . [[attachment:LCGT/subgroup/vis/Type-B_system_bs.pdf|Z-Assembly for BS by Riccardo]] . [[attachment:LCGT/subgroup/vis/TypeB_sim_0907.pdf|Simulation on TypeB by Takanori]] === The 21th (31 August, 2011) === === The 20th (24 August, 2011) === === The 19th (10 August, 2011) === === The 18th (27 July, 2011) === . [[attachment:LCGT/subgroup/vis/PayloadB_0727.pdf|Design of Type-B payload by Riccardo]] === The 17th (20 July, 2011) === === The 16th (13 July, 2011) === . [[attachment:LCGT/subgroup/vis/SR2-PR2_0711.pdf|SR2-PR2 recoil mass by Riccardo]] . [[attachment:LCGT/subgroup/vis/angle_0713.pdf|Angular fluctuation of TM by Takanori]] === The 15th (6 July, 2011) === . [[attachment:LCGT/subgroup/vis/2type_0701.pdf|Type-B payload model by Sekiguchi]] === The 14th (29 June, 2011) === . [[attachment:LCGT/subgroup/vis/kapton_0627.pdf|Kapton Wire by Sekiguchi]] === The 13th (22 June, 2011) === . [[http://tamago.mtk.nao.ac.jp/ishizaki/LCGT/kaptonwire/cable.pdf|Kapton Wire by Ishizaki]] === The 12th (15 June, 2011) === === The 11th (8 June, 2011) === . [[attachment:LCGT/subgroup/vis/minute0608.pdf|Minute]] === The 10th (1 June, 2011) === . [[attachment:LCGT/subgroup/vis/damping0601.pdf|Mode damping study by Takanori]] === The 9th (25 May, 2011) === === The 8th (18 May, 2011) === . [[attachment:LCGT/subgroup/vis/magicwand.png|Magic wands by Takanori]] . [[attachment:LCGT/subgroup/vis/Check110512.pdf|Heavier test mass by Ettore and Takanori]] === The 7th (11 May, 2011) === . [[attachment:LCGT/subgroup/vis/rep110511.pdf|Report by Takanori]] === The 6th (27 April, 2011) === . [[attachment:LCGT/subgroup/vis/dimension110427.docx|Payload dimensions by Riccardo]] === The 5th (20 April, 2011) === . [[attachment:LCGT/subgroup/vis/3D_model.pdf|Parameter Configuration by Ettore]] === (11 April, 2011) === . [[attachment:LCGT/subgroup/vis/LCGT_PAY_10-30.pdf|Parameter Configuration by Ettore]] === The 4th (6 April, 2011) === . [[attachment:LCGT/subgroup/vis/10-30_April06.docx|Simulation by Ettore]] . [[attachment:LCGT/subgroup/vis/sequence110406.pdf|Installation sequence by Riccardo]] === The 3rd (30 March, 2011) === . [[attachment:LCGT/subgroup/vis/coordinate110330.pdf|Coordinate system by Ryutaro]] . [[attachment:LCGT/subgroup/vis/110330_isasA.pdf|Simulation by Takanori]] |
|
Line 16: | Line 80: |
. [[attachment:LCGT/subgroup/vis/parameter110323.pptx|Simulation by Ettore]] | . [[attachment:LCGT/subgroup/vis/sim110323.pptx|Simulation by Ettore]] |
Line 23: | Line 87: |
Line 25: | Line 88: |
Line 32: | Line 94: |
. --(10月8日(木) 15:00-16:30 天文台輪講室)-- | |
Line 65: | Line 126: |
== Archive == | |
Line 83: | Line 145: |
==== Finite Element Analysis ==== | === Finite Element Analysis === |
Line 85: | Line 147: |
=== Rigid-Body Models === . [[LCGT/subgroup/vis/Simulation|Simulation Page]] |
Contents
- Vibration Isolation
-
Weekly EVO Meeting
- The 22th (7 September, 2011)
- The 21th (31 August, 2011)
- The 20th (24 August, 2011)
- The 19th (10 August, 2011)
- The 18th (27 July, 2011)
- The 17th (20 July, 2011)
- The 16th (13 July, 2011)
- The 15th (6 July, 2011)
- The 14th (29 June, 2011)
- The 13th (22 June, 2011)
- The 12th (15 June, 2011)
- The 11th (8 June, 2011)
- The 10th (1 June, 2011)
- The 9th (25 May, 2011)
- The 8th (18 May, 2011)
- The 7th (11 May, 2011)
- The 6th (27 April, 2011)
- The 5th (20 April, 2011)
- (11 April, 2011)
- The 4th (6 April, 2011)
- The 3rd (30 March, 2011)
- The 2nd (23 March, 2011)
- The 1st (16 March, 2011)
- LCGT防振系作業部会(2009)
- Archive
Vibration Isolation
- Chief: R. Takahashi(ICRR)
Member: T. Uchiyama(ICRR), R. DeSalvo(Univ. of Sannio), H. Ishizaki(NAOJ), A. Takamori(ERI), E. Majorana(INFN), T. Sekiguchi(ICRR), K. Yamamoto(ICRR)
Weekly EVO Meeting
- Every Wednesday, 21:00(JST)
The 22th (7 September, 2011)
The 21th (31 August, 2011)
The 20th (24 August, 2011)
The 19th (10 August, 2011)
The 18th (27 July, 2011)
The 17th (20 July, 2011)
The 16th (13 July, 2011)
The 15th (6 July, 2011)
The 14th (29 June, 2011)
The 13th (22 June, 2011)
The 12th (15 June, 2011)
The 11th (8 June, 2011)
The 10th (1 June, 2011)
The 9th (25 May, 2011)
The 8th (18 May, 2011)
The 7th (11 May, 2011)
The 6th (27 April, 2011)
The 5th (20 April, 2011)
(11 April, 2011)
The 4th (6 April, 2011)
The 3rd (30 March, 2011)
The 2nd (23 March, 2011)
The 1st (16 March, 2011)
LCGT防振系作業部会(2009)
第6回
- 11月12日(木) 15:00-16:30 天文台輪講室
第5回
10月15日(木) 13:00-14:30 天文台大会議室 (議事録)
ブレーンストーミング
第4回
9月3日(木) 15:00-16:30 天文台輪講室 (議事録)
第3回
8月6日(木) 15:00-16:30 天文台輪講室 (議事録)
第2回
7月16日(木) 15:00-16:30 天文台輪講室 (議事録)
第1回
6月3日(水) 17:00-19:00 天文台輪講室 (議事録)
R&Dについて (次回)
Archive
TAMA SAS
TAMA Double Pendulum
Seismic spectrum in Kamioka mine
In loud day (This data should be used as nominal ground motion in Kamioka)
LCGT-SAS model
Transfer function X0~X7/Xg (old)
Modeling M-file (2009/8/15)(2009/8/17)
Spectrum of displacement (2009/8/15)(2009/8/17)
Finite Element Analysis