Differences between revisions 94 and 122 (spanning 28 versions)
Revision 94 as of 2011-03-24 11:38:00
Size: 4245
Comment:
Revision 122 as of 2011-07-13 15:12:06
Size: 6196
Comment:
Deletions are marked like this. Additions are marked like this.
Line 8: Line 8:
 . Member: T. Uchiyama(ICRR), R. De''''''Salvo(Univ. of Sannio), H. Ishizaki(NAOJ), A. Takamori(ERI), E. Majorana(INFN), T. Sekiguchi(ICRR)  . Member: T. Uchiyama(ICRR), R. De''''''Salvo(Univ. of Sannio), H. Ishizaki(NAOJ), A. Takamori(ERI), E. Majorana(INFN), T. Sekiguchi(ICRR), K. Yamamoto(ICRR)
Line 14: Line 14:
=== The 16th (13 July, 2011) ===
 . [[attachment:LCGT/subgroup/vis/SR2-PR2_0711.pdf|SR2-PR2 recoil mass by Riccardo]]

=== The 15th (6 July, 2011) ===
 . [[attachment:LCGT/subgroup/vis/2type_0701.pdf|Type-B payload model by Sekiguchi]]

=== The 14th (29 June, 2011) ===
 . [[attachment:LCGT/subgroup/vis/kapton_0627.pdf|Kapton Wire by Sekiguchi]]

=== The 13th (22 June, 2011) ===
 . [[http://tamago.mtk.nao.ac.jp/ishizaki/LCGT/kaptonwire/cable.pdf|Kapton Wire by Ishizaki]]

=== The 12th (15 June, 2011) ===

=== The 11th (8 June, 2011) ===
 . [[attachment:LCGT/subgroup/vis/minute0608.pdf|Minute]]

=== The 10th (1 June, 2011) ===
 . [[attachment:LCGT/subgroup/vis/damping0601.pdf|Mode damping study by Takanori]]

=== The 9th (25 May, 2011) ===

=== The 8th (18 May, 2011) ===
 . [[attachment:LCGT/subgroup/vis/magicwand.png|Magic wands by Takanori]]
 . [[attachment:LCGT/subgroup/vis/Check110512.pdf|Heavier test mass by Ettore and Takanori]]

=== The 7th (11 May, 2011) ===
 . [[attachment:LCGT/subgroup/vis/rep110511.pdf|Report by Takanori]]

=== The 6th (27 April, 2011) ===
 . [[attachment:LCGT/subgroup/vis/dimension110427.docx|Payload dimensions by Riccardo]]

=== The 5th (20 April, 2011) ===
 . [[attachment:LCGT/subgroup/vis/3D_model.pdf|Parameter Configuration by Ettore]]

=== (11 April, 2011) ===
 . [[attachment:LCGT/subgroup/vis/LCGT_PAY_10-30.pdf|Parameter Configuration by Ettore]]

=== The 4th (6 April, 2011) ===
 . [[attachment:LCGT/subgroup/vis/10-30_April06.docx|Simulation by Ettore]]
 . [[attachment:LCGT/subgroup/vis/sequence110406.pdf|Installation sequence by Riccardo]]

=== The 3rd (30 March, 2011) ===
 . [[attachment:LCGT/subgroup/vis/coordinate110330.pdf|Coordinate system by Ryutaro]]
 . [[attachment:LCGT/subgroup/vis/110330_isasA.pdf|Simulation by Takanori]]
Line 17: Line 63:
 . [[attachment:LCGT/subgroup/vis/parameter110323.pptx|Simulation by Ettore]]  . [[attachment:LCGT/subgroup/vis/sim110323.pptx|Simulation by Ettore]]
Line 63: Line 109:
== Archive ==
Line 81: Line 128:
==== Finite Element Analysis ==== === Finite Element Analysis ===
Line 83: Line 130:

=== Rigid-Body Models ===
 . [[LCGT/subgroup/vis/Simulation|Simulation Page]]

PROJECT TOP

GW Analysis

Interferometer

Vacuum & Cryostat

Laser & Optics

Seismic Isolator

Infrastructure

Vibration Isolation

  • Chief: R. Takahashi(ICRR)
  • Member: T. Uchiyama(ICRR), R. DeSalvo(Univ. of Sannio), H. Ishizaki(NAOJ), A. Takamori(ERI), E. Majorana(INFN), T. Sekiguchi(ICRR), K. Yamamoto(ICRR)


Weekly EVO Meeting

  • Every Wednesday, 21:00(JST)

The 16th (13 July, 2011)

The 15th (6 July, 2011)

The 14th (29 June, 2011)

The 13th (22 June, 2011)

The 12th (15 June, 2011)

The 11th (8 June, 2011)

The 10th (1 June, 2011)

The 9th (25 May, 2011)

The 8th (18 May, 2011)

The 7th (11 May, 2011)

The 6th (27 April, 2011)

The 5th (20 April, 2011)

(11 April, 2011)

The 4th (6 April, 2011)

The 3rd (30 March, 2011)

The 2nd (23 March, 2011)

The 1st (16 March, 2011)


LCGT防振系作業部会(2009)

第6回

第5回

ブレーンストーミング

  • 10月1日(木) 13:00-15:00 東京大学理学部1号館445号室 (議事録)

  • メモ

第4回

第3回

第2回

第1回


Archive

TAMA SAS

TAMA Double Pendulum

Seismic spectrum in Kamioka mine

LCGT-SAS model

Finite Element Analysis

Rigid-Body Models

KAGRA/Subgroups/VIS (last edited 2022-02-25 19:10:23 by HirotakaYuzurihara)