Differences between revisions 99 and 112 (spanning 13 versions)
Revision 99 as of 2011-04-01 16:30:59
Size: 4471
Comment:
Revision 112 as of 2011-05-11 20:39:57
Size: 5222
Comment:
Deletions are marked like this. Additions are marked like this.
Line 13: Line 13:

=== The 7th (11 May, 2011) ===
 . [[attachment:LCGT/subgroup/vis/rep110511.pdf|Report by Takanori]]

=== The 6th (27 April, 2011) ===
 . [[attachment:LCGT/subgroup/vis/dimension110427.docx|Payload dimensions by Riccardo]]

=== The 5th (20 April, 2011) ===
 . [[attachment:LCGT/subgroup/vis/3D_model.pdf|Parameter Configuration by Ettore]]

=== (11 April, 2011) ===
 . [[attachment:LCGT/subgroup/vis/LCGT_PAY_10-30.pdf|Parameter Configuration by Ettore]]

=== The 4th (6 April, 2011) ===
 . [[attachment:LCGT/subgroup/vis/10-30_April06.docx|Simulation by Ettore]]
 . [[attachment:LCGT/subgroup/vis/sequence110406.pdf|Installation sequence by Riccardo]]
Line 88: Line 104:

=== Rigid-Body Models ===
 . [[LCGT/subgroup/vis/Simulation|Simulation Page]]

PROJECT TOP

GW Analysis

Interferometer

Vacuum & Cryostat

Laser & Optics

Seismic Isolator

Infrastructure

Vibration Isolation

  • Chief: R. Takahashi(ICRR)
  • Member: T. Uchiyama(ICRR), R. DeSalvo(Univ. of Sannio), H. Ishizaki(NAOJ), A. Takamori(ERI), E. Majorana(INFN), T. Sekiguchi(ICRR), K. Yamamoto(ICRR)


Weekly EVO Meeting

  • Every Wednesday, 21:00(JST)

The 7th (11 May, 2011)

The 6th (27 April, 2011)

The 5th (20 April, 2011)

(11 April, 2011)

The 4th (6 April, 2011)

The 3rd (30 March, 2011)

The 2nd (23 March, 2011)

The 1st (16 March, 2011)


LCGT防振系作業部会(2009)

第6回

第5回

ブレーンストーミング

  • 10月1日(木) 13:00-15:00 東京大学理学部1号館445号室 (議事録)

  • メモ

第4回

第3回

第2回

第1回


Archive

TAMA SAS

TAMA Double Pendulum

Seismic spectrum in Kamioka mine

LCGT-SAS model

Finite Element Analysis

Rigid-Body Models

KAGRA/Subgroups/VIS (last edited 2022-02-25 19:10:23 by HirotakaYuzurihara)