917
Comment:
|
3542
|
Deletions are marked like this. | Additions are marked like this. |
Line 5: | Line 5: |
TBD | 2021 Jan. 20th from 10AM |
Line 7: | Line 7: |
It will be a remote meeting on Zoom. | Connection: KAGRA Zoom2 |
Line 14: | Line 15: |
== Minutes == * Identification of Tasks * Clarify the constraints * Check available space, location * Tomaru-san started investigation with Araki-san * Near IYA, air ducts may interfere * Using X-arm is also an option to consider * Beam height choice (same as the main beam or lower) * Vacuum interface * Check available flanges on OMC or OMMT chambers * Can we penetrate the X-arm duct ? * Cryostat door interference if we use the same beam height as the main beam * Put GVs to make a removable section next to cryostats ? : risk of vacuum leak. * Vacuum modifications in conjunction with overall KAGRA vacuum upgrade ? * Conceptual design * Filter Cavity Optical Design * Squeezer design * Doubly resonant OPO * In-vac OPO ? * Interface optics design * Squeezer -> FC * FC -> MIF * Back scattering mitigation * Theoretical study on requirements * New IFI ? * Suspension design * Vacuum design * Baffles in the beam duct ? * Movable targets ? * Clean room design * Control system * FC LSC * FC ASC * ASC for FC->MIF coupling * Control system hardware * Analog electronics * DGS * Milestones for the conceptual design * Intermediate status review in April * Conceptual design review in July * Mutual review of the working group * Internal review by KAGRA members not involved in the working group * External review by LIGO/Virgo experts * Make a realistic budget * Make a project schedule * Confirm available members * We heard from participants about their interested area of contribution * Matteo and Aso will contact people individually for further discussion on the task assignment * Schedule regular meetings * We will hold biweekly meetings * Schedule of the meeting will be decided by Doodle poll. |
|
Line 17: | Line 71: |
* Technical overview (Matteo) | |
Line 21: | Line 76: |
* etc. | * Available flanges on OMC or OMMT chambers * Can we penetrate the X-arm duct ? * Cryostat door interference ? - Put GVs to make a removable section next to IYC * Vacuum modifications in conjunction with overall KAGRA vacuum upgrade ? |
Line 25: | Line 84: |
* Doubly resonant OPO * In-vac OPO ? |
|
Line 26: | Line 87: |
* Squeezer -> FC * FC -> MIF * Back scattering mitigation * Theoretical study on requirements * New IFI ? |
|
Line 29: | Line 95: |
* FC LSC * FC ASC * ASC for FC->MIF coupling * Control system hardware |
|
Line 31: | Line 101: |
* Milestones for the preliminary design * Intermediate check in March or April ? * Preliminary design review in July ? |
|
Line 35: | Line 108: |
* Biweekly ? |
KAGRA Filter Cavity Kick-off meeting
Date/Time/Location
2021 Jan. 20th from 10AM
Connection: KAGRA Zoom2
Abstract
This is a project to install a filter cavity into KAGRA. It is not funded yet, but we should start preliminary design studies to prepare for the time when a fund is available. This meeting's purpose is to gather interested people and identify potential tasks to start this project.
Minutes
- Identification of Tasks
- Clarify the constraints
- Check available space, location
- Tomaru-san started investigation with Araki-san
- Near IYA, air ducts may interfere
- Using X-arm is also an option to consider
- Beam height choice (same as the main beam or lower)
- Tomaru-san started investigation with Araki-san
- Vacuum interface
- Check available flanges on OMC or OMMT chambers
- Can we penetrate the X-arm duct ?
- Cryostat door interference if we use the same beam height as the main beam
- Put GVs to make a removable section next to cryostats ? : risk of vacuum leak.
- Vacuum modifications in conjunction with overall KAGRA vacuum upgrade ?
- Check available space, location
- Conceptual design
- Filter Cavity Optical Design
- Squeezer design
- Doubly resonant OPO
- In-vac OPO ?
- Interface optics design
Squeezer -> FC
FC -> MIF
- Back scattering mitigation
- Theoretical study on requirements
- New IFI ?
- Suspension design
- Vacuum design
- Baffles in the beam duct ?
- Movable targets ?
- Clean room design
- Control system
- FC LSC
- FC ASC
ASC for FC->MIF coupling
- Control system hardware
- Analog electronics
- DGS
- Milestones for the conceptual design
- Intermediate status review in April
- Conceptual design review in July
- Mutual review of the working group
- Internal review by KAGRA members not involved in the working group
- External review by LIGO/Virgo experts
- Make a realistic budget
- Make a project schedule
- Clarify the constraints
- Confirm available members
- We heard from participants about their interested area of contribution
- Matteo and Aso will contact people individually for further discussion on the task assignment
- Schedule regular meetings
- We will hold biweekly meetings
- Schedule of the meeting will be decided by Doodle poll.
Agenda
- Introduction (Aso)
- Technical overview (Matteo)
- Identification of Tasks
- Clarify the constraints
- Available space, location
- Vacuum interface
- Available flanges on OMC or OMMT chambers
- Can we penetrate the X-arm duct ?
- Cryostat door interference ?
- - Put GVs to make a removable section next to IYC
- Vacuum modifications in conjunction with overall KAGRA vacuum upgrade ?
- Preliminary design
- Filter Cavity Optical Design
- Squeezer design
- Doubly resonant OPO
- In-vac OPO ?
- Interface optics design
Squeezer -> FC
FC -> MIF
- Back scattering mitigation
- Theoretical study on requirements
- New IFI ?
- Suspension design
- Vacuum design
- Control system
- FC LSC
- FC ASC
ASC for FC->MIF coupling
- Control system hardware
- Analog electronics
- DGS
- Milestones for the preliminary design
- Intermediate check in March or April ?
- Preliminary design review in July ?
- Make a realistic budget
- Make a project schedule
- Clarify the constraints
- Confirm available members
- Schedule regular meetings
- Biweekly ?