* etc. | * Available flanges on OMC or OMMT chambers * Can we penetrate the X-arm duct ? * Cryostat door interference ? - Put GVs to make a removable section next to IYC * Vacuum modifications in conjunction with overall KAGRA vacuum upgrade ? |
Line 26: | Line 31: |
* Doubly resonant OPO * In-vac OPO ? |
|
Line 27: | Line 34: |
* Squeezer -> FC * FC -> MIF * Back scattering mitigation * Theoretical study on requirements * New IFI ? |
|
Line 30: | Line 42: |
* FC LSC * FC ASC * ASC for FC->MIF coupling * Control system hardware |
|
Line 32: | Line 48: |
* Milestones for the preliminary design |
KAGRA Filter Cavity Kick-off meeting
Date/Time/Location
2021 Jan. 20th from 10AM
Connection: KAGRA Zoom2
Abstract
This is a project to install a filter cavity into KAGRA. It is not funded yet, but we should start preliminary design studies to prepare for the time when a fund is available. This meeting's purpose is to gather interested people and identify potential tasks to start this project.
Agenda
- Introduction (Aso)
- Technical overview (Matteo)
- Identification of Tasks
- Clarify the constraints
- Available space, location
- Vacuum interface
- Available flanges on OMC or OMMT chambers
- Can we penetrate the X-arm duct ?
- Cryostat door interference ?
- - Put GVs to make a removable section next to IYC
- Vacuum modifications in conjunction with overall KAGRA vacuum upgrade ?
- Preliminary design
- Filter Cavity Optical Design
- Squeezer design
- Doubly resonant OPO
- In-vac OPO ?
- Interface optics design
Squeezer -> FC
FC -> MIF
- Back scattering mitigation
- Theoretical study on requirements
- New IFI ?
- Suspension design
- Vacuum design
- Control system
- FC LSC
- FC ASC
ASC for FC->MIF coupling
- Control system hardware
- Analog electronics
- DGS
- Milestones for the preliminary design
- Make a realistic budget
- Make a project schedule
- Clarify the constraints
- Confirm available members