== Minutes ==
 * Identification of Tasks
  * Clarify the constraints
   * Check available space, location
    * Tomaru-san started investigation with Araki-san
     * Near IYA, air ducts may interfere
    * Using X-arm is also an option to consider
    * Beam height choice (same as the main beam or lower)
   * Vacuum interface
    * Check available flanges on OMC or OMMT chambers
    * Can we penetrate the X-arm duct ?
    * Cryostat door interference if we use the same beam height as the main beam
 * Put GVs to make a removable section next to cryostats ? : risk of vacuum leak.
    * Vacuum modifications in conjunction with overall KAGRA vacuum upgrade ?
  * Conceptual design
   * Filter Cavity Optical Design
   * Squeezer design
    * Doubly resonant OPO
    * In-vac OPO ?
   * Interface optics design
    * Squeezer -> FC
    * FC -> MIF
   * Back scattering mitigation
    * Theoretical study on requirements
    * New IFI ?
   * Suspension design
   * Vacuum design
    * Baffles in the beam duct ?
    * Movable targets ?
   * Clean room design
   * Control system
    * FC LSC
    * FC ASC
    * ASC for FC->MIF coupling
   * Control system hardware
    * Analog electronics
    * DGS
  * Milestones for the conceptual design
   * Intermediate status review in April
   * Conceptual design review in July
     * Mutual review of the working group
     * Internal review by KAGRA members not involved in the working group
     * External review by LIGO/Virgo experts
  * Make a realistic budget
  * Make a project schedule
 * Confirm available members
  * We heard from participants about their interested area of contribution
  * Matteo and Aso will contact people individually for further discussion on the task assignment
 * Schedule regular meetings
  * We will hold biweekly meetings
  * Schedule of the meeting will be decided by Doodle poll.

KAGRA Filter Cavity Kick-off meeting

Date/Time/Location

2021 Jan. 20th from 10AM

Connection: KAGRA Zoom2

Abstract

This is a project to install a filter cavity into KAGRA. It is not funded yet, but we should start preliminary design studies to prepare for the time when a fund is available. This meeting's purpose is to gather interested people and identify potential tasks to start this project.

Minutes

  • Identification of Tasks
    • Clarify the constraints
      • Check available space, location
        • Tomaru-san started investigation with Araki-san
          • Near IYA, air ducts may interfere
        • Using X-arm is also an option to consider
        • Beam height choice (same as the main beam or lower)
      • Vacuum interface
        • Check available flanges on OMC or OMMT chambers
        • Can we penetrate the X-arm duct ?
        • Cryostat door interference if we use the same beam height as the main beam
          • Put GVs to make a removable section next to cryostats ? : risk of vacuum leak.
        • Vacuum modifications in conjunction with overall KAGRA vacuum upgrade ?
    • Conceptual design
      • Filter Cavity Optical Design
      • Squeezer design
        • Doubly resonant OPO
        • In-vac OPO ?
      • Interface optics design
        • Squeezer -> FC

        • FC -> MIF

      • Back scattering mitigation
        • Theoretical study on requirements
        • New IFI ?
      • Suspension design
      • Vacuum design
        • Baffles in the beam duct ?
        • Movable targets ?
      • Clean room design
      • Control system
        • FC LSC
        • FC ASC
        • ASC for FC->MIF coupling

      • Control system hardware
        • Analog electronics
        • DGS
    • Milestones for the conceptual design
      • Intermediate status review in April
      • Conceptual design review in July
        • Mutual review of the working group
        • Internal review by KAGRA members not involved in the working group
        • External review by LIGO/Virgo experts
    • Make a realistic budget
    • Make a project schedule
  • Confirm available members
    • We heard from participants about their interested area of contribution
    • Matteo and Aso will contact people individually for further discussion on the task assignment
  • Schedule regular meetings
    • We will hold biweekly meetings
    • Schedule of the meeting will be decided by Doodle poll.

Agenda

  • Introduction (Aso)
  • Technical overview (Matteo)
  • Identification of Tasks
    • Clarify the constraints
      • Available space, location
      • Vacuum interface
        • Available flanges on OMC or OMMT chambers
        • Can we penetrate the X-arm duct ?
        • Cryostat door interference ?
          • - Put GVs to make a removable section next to IYC
        • Vacuum modifications in conjunction with overall KAGRA vacuum upgrade ?
    • Preliminary design
      • Filter Cavity Optical Design
      • Squeezer design
        • Doubly resonant OPO
        • In-vac OPO ?
      • Interface optics design
        • Squeezer -> FC

        • FC -> MIF

      • Back scattering mitigation
        • Theoretical study on requirements
        • New IFI ?
      • Suspension design
      • Vacuum design
      • Control system
        • FC LSC
        • FC ASC
        • ASC for FC->MIF coupling

      • Control system hardware
        • Analog electronics
        • DGS
    • Milestones for the preliminary design
      • Intermediate check in March or April ?
      • Preliminary design review in July ?
    • Make a realistic budget
    • Make a project schedule
  • Confirm available members
  • Schedule regular meetings
    • Biweekly ?