Line 16: Line 16:
 * Introduction (Aso) [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=12478|Slides]]
 * Technical overview (Matteo)

KAGRA Filter Cavity Kick-off meeting

Date/Time/Location

2021 Jan. 20th from 10AM

Connection: KAGRA Zoom2

Abstract

This is a project to install a filter cavity into KAGRA. It is not funded yet, but we should start preliminary design studies to prepare for the time when a fund is available. This meeting's purpose is to gather interested people and identify potential tasks to start this project.

Minutes

  • Introduction (Aso) Slides

  • Technical overview (Matteo)
  • Identification of Tasks
    • Clarify the constraints
      • Check available space, location
        • Tomaru-san started investigation with Araki-san
          • Near IYA, air ducts may interfere
        • Using X-arm is also an option to consider
        • Beam height choice (same as the main beam or lower)
      • Vacuum interface
        • Check available flanges on OMC or OMMT chambers
        • Can we penetrate the X-arm duct ?
        • Cryostat door interference if we use the same beam height as the main beam
          • Put GVs to make a removable section next to cryostats ? : risk of vacuum leak.
        • Vacuum modifications in conjunction with overall KAGRA vacuum upgrade ?
    • Conceptual design
      • Filter Cavity Optical Design
      • Squeezer design
        • Doubly resonant OPO
        • In-vac OPO ?
      • Interface optics design
        • Squeezer -> FC

        • FC -> MIF

      • Back scattering mitigation
        • Theoretical study on requirements
        • New IFI ?
      • Suspension design
      • Vacuum design
        • Baffles in the beam duct ?
        • Movable targets ?
      • Clean room design
      • Control system
        • FC LSC
        • FC ASC
        • ASC for FC->MIF coupling

      • Control system hardware
        • Analog electronics
        • DGS
    • Milestones for the conceptual design
      • Intermediate status review in April
      • Conceptual design review in July
        • Mutual review of the working group
        • Internal review by KAGRA members not involved in the working group
        • External review by LIGO/Virgo experts
    • Make a realistic budget
    • Make a project schedule
  • Confirm available members
    • We heard from participants about their interested area of contribution
    • Matteo and Aso will contact people individually for further discussion on the task assignment
  • Schedule regular meetings
    • We will hold biweekly meetings
    • Schedule of the meeting will be decided by Doodle poll.

Agenda

  • Introduction (Aso)
  • Technical overview (Matteo)
  • Identification of Tasks
    • Clarify the constraints
      • Available space, location
      • Vacuum interface
        • Available flanges on OMC or OMMT chambers
        • Can we penetrate the X-arm duct ?
        • Cryostat door interference ?
          • - Put GVs to make a removable section next to IYC
        • Vacuum modifications in conjunction with overall KAGRA vacuum upgrade ?
    • Preliminary design
      • Filter Cavity Optical Design
      • Squeezer design
        • Doubly resonant OPO
        • In-vac OPO ?
      • Interface optics design
        • Squeezer -> FC

        • FC -> MIF

      • Back scattering mitigation
        • Theoretical study on requirements
        • New IFI ?
      • Suspension design
      • Vacuum design
      • Control system
        • FC LSC
        • FC ASC
        • ASC for FC->MIF coupling

      • Control system hardware
        • Analog electronics
        • DGS
    • Milestones for the preliminary design
      • Intermediate check in March or April ?
      • Preliminary design review in July ?
    • Make a realistic budget
    • Make a project schedule
  • Confirm available members
  • Schedule regular meetings
    • Biweekly ?