Size: 1139
Comment:
|
Size: 1675
Comment:
|
Deletions are marked like this. | Additions are marked like this. |
Line 8: | Line 8: |
* | * '''Ref''': [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=7663|SR Suspension Diagonalization Matrices (by Mark)]] * '''Ref''': [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=4155 |A Study of Low Frequency Vibration Isolation System for Large Scale Gravitational Wave Detectors (by Sekiguchi)]] |
Line 11: | Line 14: |
* [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=5046]]: note: LVDT1's coil wires were broken. | |
Line 12: | Line 16: |
* [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=5106]]: note: LVDT6's coil wires were broken. |
Transmission Monitor's Vibration Isolation Stage: preparation (TMS-VIS)
- With a fixed stage.
- TMS = BRT (beam reducing telescope) + GPT (Gouy phase telescope)
|
|
Links to knowledge
|A Study of Low Frequency Vibration Isolation System for Large Scale Gravitational Wave Detectors (by Sekiguchi)]]
LVDTs
http://klog.icrr.u-tokyo.ac.jp/osl/?r=5046: note: LVDT1's coil wires were broken.
http://klog.icrr.u-tokyo.ac.jp/osl/?r=5106: note: LVDT6's coil wires were broken.
Actuator coils
- Tanioka-kun's efforts in 2017
Geophones
Task list
Note: some of the tasks can be done in parallel.
Signal Assign
Pin Name |
Resistance |
Equipment |
Assign |
Comment1 |
Comment2 |
Connection |