Size: 1190
Comment:
|
Size: 1229
Comment:
|
Deletions are marked like this. | Additions are marked like this. |
Line 11: | Line 11: |
* [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=5046]] | * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=5046]]: note: LVDT1's coil wires were broken. |
Transmission Monitor's Vibration Isolation Stage: preparation (TMS-VIS)
- With a fixed stage.
- TMS = BRT (beam reducing telescope) + GPT (Gouy phase telescope)
|
|
Links to knowledge
LVDTs
http://klog.icrr.u-tokyo.ac.jp/osl/?r=5046: note: LVDT1's coil wires were broken.
Actuator coils
- Tanioka-kun's efforts in 2017
Geophones
Task list
Note: some of the tasks can be done in parallel.
Signal Assign
Pin Name |
Resistance |
Equipment |
Assign |
Comment1 |
Comment2 |
Connection |