Line 11: Line 11:
 * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=5046]]  * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=5046]]: note: LVDT1's coil wires were broken.

Transmission Monitor's Vibration Isolation Stage: preparation (TMS-VIS)

  • With a fixed stage.
  • TMS = BRT (beam reducing telescope) + GPT (Gouy phase telescope)

<< <  2018 / 5 >  >>
Mon Tue Wed Thu Fri Sat Sun
  1 2 3 4 5 6
7 8 9 10 11 12 13
14 15 16 17 18 19 20
21 22 23 24 25 26 27
28 29 30 31      

<< <  2018 / 6 >  >>
Mon Tue Wed Thu Fri Sat Sun
        1 2 3
4 5 6 7 8 9 10
11 12 13 14 15 16 17
18 19 20 21 22 23 24
25 26 27 28 29 30  

LVDTs

Actuator coils

Geophones

Task list

Note: some of the tasks can be done in parallel.