Differences between revisions 16 and 17
Revision 16 as of 2018-07-05 15:15:14
Size: 1451
Comment:
Revision 17 as of 2018-07-05 15:15:28
Size: 1461
Comment:
Deletions are marked like this. Additions are marked like this.
Line 8: Line 8:
 * '''Ref''': [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=7663|SR Suspension Diagonalization Matrices]]  * '''Ref''': [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=7663|SR Suspension Diagonalization Matrices (by Mark)]]

Transmission Monitor's Vibration Isolation Stage: preparation (TMS-VIS)

  • With a fixed stage.
  • TMS = BRT (beam reducing telescope) + GPT (Gouy phase telescope)

<< <  2018 / 5 >  >>
Mon Tue Wed Thu Fri Sat Sun
  1 2 3 4 5 6
7 8 9 10 11 12 13
14 15 16 17 18 19 20
21 22 23 24 25 26 27
28 29 30 31      

<< <  2018 / 6 >  >>
Mon Tue Wed Thu Fri Sat Sun
        1 2 3
4 5 6 7 8 9 10
11 12 13 14 15 16 17
18 19 20 21 22 23 24
25 26 27 28 29 30  

LVDTs

Actuator coils

Geophones

Task list

Note: some of the tasks can be done in parallel.

Signal Assign

Pin Name

Resistance

Equipment

Assign

Comment1

Comment2

Connection

KAGRA/subgroup/AOS/TMS-VIS0 (last edited 2018-10-24 19:00:52 by TomotadaAkutsu)