* Tanioka-kun's efforts in 2017 * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=3323]] * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=3103]] * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=3009]] * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=2994]] * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=2823]] * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=2821]] * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=2820]] * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=2803]] |
|
Line 17: | Line 26: |
* [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=5024]] | |
Line 22: | Line 32: |
* Place/install the fixed stage. * Needs some shims... but what is the required horizontalness? * Place/install the BRT * What is the references...? |
* |
Transmission Monitor's Vibration Isolation Stage: preparation (TMS-VIS)
- With a fixed stage.
- TMS = BRT (beam reducing telescope) + GPT (Gouy phase telescope)
|
|
Links to knowledge
LVDTs
Actuator coils
- Tanioka-kun's efforts in 2017
Geophones
Task list
Note: some of the tasks can be done in parallel.
Signal Assign
Pin Name |
Resistance |
Equipment |
Assign |
Comment1 |
Comment2 |
Connection |