Differences between revisions 2 and 12 (spanning 10 versions)
Revision 2 as of 2018-05-16 13:06:43
Size: 793
Comment:
Revision 12 as of 2018-05-23 20:43:54
Size: 1229
Comment:
Deletions are marked like this. Additions are marked like this.
Line 11: Line 11:
 * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=5046]]: note: LVDT1's coil wires were broken.
Line 15: Line 16:
 * Tanioka-kun's efforts in 2017
  * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=3323]]
  * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=3103]]
  * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=3009]]
  * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=2994]]
  * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=2823]]
  * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=2821]]
  * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=2820]]
  * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=2803]]
Line 17: Line 27:
 * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=5024]]
Line 22: Line 33:
 * Place/install the fixed stage.
  * Needs some shims... but what is the required horizontalness?
 * Place/install the BRT
  * What is the references...?
 *

Transmission Monitor's Vibration Isolation Stage: preparation (TMS-VIS)

  • With a fixed stage.
  • TMS = BRT (beam reducing telescope) + GPT (Gouy phase telescope)

<< <  2018 / 5 >  >>
Mon Tue Wed Thu Fri Sat Sun
  1 2 3 4 5 6
7 8 9 10 11 12 13
14 15 16 17 18 19 20
21 22 23 24 25 26 27
28 29 30 31      

<< <  2018 / 6 >  >>
Mon Tue Wed Thu Fri Sat Sun
        1 2 3
4 5 6 7 8 9 10
11 12 13 14 15 16 17
18 19 20 21 22 23 24
25 26 27 28 29 30  

LVDTs

Actuator coils

Geophones

Task list

Note: some of the tasks can be done in parallel.

Signal Assign

Pin Name

Resistance

Equipment

Assign

Comment1

Comment2

Connection

KAGRA/subgroup/AOS/TMS-VIS0 (last edited 2018-10-24 19:00:52 by TomotadaAkutsu)