Size: 793
Comment:
|
Size: 2810
Comment:
|
Deletions are marked like this. | Additions are marked like this. |
Line 8: | Line 8: |
* | * https://gwpo.nao.ac.jp/wiki/ATCstandalone * '''Ref''': [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=7663|SR Suspension Diagonalization Matrices (by Mark)]] * '''Ref''': [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=4155|A Study of Low Frequency Vibration Isolation System for Large Scale Gravitational Wave Detectors (by Sekiguchi)]] |
Line 11: | Line 14: |
Be careful! The pin assignment in the Dsub shell or the signal phases would be different from the below for #1 and #2, as I needed to once detach the pins when I installed the LVDTs (Akutsu). * [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=8464|Coil inspection report (JGW-T1808464)]] * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=5046]]: note: LVDT1's coil wires were broken. |
|
Line 12: | Line 18: |
* [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=5106]]: note: LVDT6's coil wires were broken. | |
Line 14: | Line 21: |
Be careful! The pin assignment in the Dsub shell or the signal phases would be different from the below, as I needed to once detach the pins when I installed the coils (Akutsu). * [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=8465|Coil inspection report (JGW-T1808465)]] |
|
Line 15: | Line 24: |
* Tanioka-kun's efforts in 2017 * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=3323]] * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=3103]] * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=3009]] * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=2994]] * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=2823]] * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=2821]] * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=2820]] * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=2803]] |
|
Line 17: | Line 35: |
* [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=8466|Data sheets of the geophones]] * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=5024]] |
|
Line 18: | Line 38: |
== Cabling == * LVDT/Act - (coil wires) - Dsub9M - (Dsub9F - PTFE 2m - Dsub9F) - Dsub9M flange - Flipper cable - Dsub Cable * Geophone - (MIL C 26482 - PTFE 0.5m - Dsub9M) - (Dsub9F - 1.5m PTFE - Dsub9F) - Dsub9M flange - Flipper cable - Dsub Cable * [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=8452|PTFE cables]] |
|
Line 22: | Line 46: |
* Place/install the fixed stage. * Needs some shims... but what is the required horizontalness? * Place/install the BRT * What is the references...? |
* |
Transmission Monitor's Vibration Isolation Stage: preparation (TMS-VIS)
- With a fixed stage.
- TMS = BRT (beam reducing telescope) + GPT (Gouy phase telescope)
|
|
Links to knowledge
LVDTs
Be careful! The pin assignment in the Dsub shell or the signal phases would be different from the below for #1 and #2, as I needed to once detach the pins when I installed the LVDTs (Akutsu).
http://klog.icrr.u-tokyo.ac.jp/osl/?r=5046: note: LVDT1's coil wires were broken.
http://klog.icrr.u-tokyo.ac.jp/osl/?r=5106: note: LVDT6's coil wires were broken.
Actuator coils
Be careful! The pin assignment in the Dsub shell or the signal phases would be different from the below, as I needed to once detach the pins when I installed the coils (Akutsu).
- Tanioka-kun's efforts in 2017
Geophones
Cabling
- LVDT/Act - (coil wires) - Dsub9M - (Dsub9F - PTFE 2m - Dsub9F) - Dsub9M flange - Flipper cable - Dsub Cable
- Geophone - (MIL C 26482 - PTFE 0.5m - Dsub9M) - (Dsub9F - 1.5m PTFE - Dsub9F) - Dsub9M flange - Flipper cable - Dsub Cable
Task list
Note: some of the tasks can be done in parallel.
Signal Assign
Pin Name |
Resistance |
Equipment |
Assign |
Comment1 |
Comment2 |
Connection |