1087
Comment:
|
3519
|
Deletions are marked like this. | Additions are marked like this. |
Line 8: | Line 8: |
* | * [[https://gwpo.nao.ac.jp/wiki/ATCstandalone|Standalone Machine in ATC]] * '''Ref''': [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=7663|SR Suspension Diagonalization Matrices (by Mark)]] * '''Ref''': [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=4155|A Study of Low Frequency Vibration Isolation System for Large Scale Gravitational Wave Detectors (by Sekiguchi)]] |
Line 11: | Line 14: |
Be careful! The pin assignment in the Dsub shell or the signal phases would be different from the below for #1 and #2, as I needed to once detach the pins when I installed the LVDTs (Akutsu). * [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=8464|Coil inspection report (JGW-T1808464)]] * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=5046]]: note: LVDT1's coil wires were broken. |
|
Line 12: | Line 18: |
* [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=5106]]: note: LVDT6's coil wires were broken. | |
Line 14: | Line 21: |
Be careful! The pin assignment in the Dsub shell or the signal phases would be different from the below, as I needed to once detach the pins when I installed the coils (Akutsu). * [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=8465|Coil inspection report (JGW-T1808465)]] |
|
Line 16: | Line 25: |
* [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=3323]] * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=3103]] |
|
Line 17: | Line 28: |
* [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=3103]] * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=3323]] |
|
Line 26: | Line 35: |
* [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=8466|Data sheets of the geophones]] * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=5024]] || Serical# of L-4C||Vert/Horiz||Naming of the assembled unit||Assembler|| || 404080975 || Vert || || || || 404080976 || Vert || TMS-VISX: Geo-V2|| Akutsu || || 404080977 || Vert || || || || 404080978 || Vert || || || || 404084240 || Vert || || || || 404084241 || Vert || TMS-VISX: Geo-V3|| Akutsu || || 404084242 || Vert || TMS-VISX: Geo-V1|| Fujii -> Akutsu || || 2 || Horiz|| TMS-VISX: Geo-H3|| Akutsu -> Uraguchi || || 3 || Horiz|| || || || 4 || Horiz|| TMS-VISX: Geo-H1|| Akutsu || || 5 || Horiz|| TMS-VISX: Geo-H2|| Akutsu || || 15 || Horiz|| || || || 16 || Horiz|| || || || 17 || Horiz|| || || |
|
Line 27: | Line 53: |
== Cabling == * LVDT/Act - (coil wires) - Dsub9M - (Dsub9F - PTFE 2m - Dsub9F) - Dsub9M flange - Flipper cable - Dsub Cable * Geophone - (MIL C 26482 - PTFE 0.5m - Dsub9M) - (Dsub9F - 1.5m PTFE - Dsub9F) - Dsub9M flange - Flipper cable - Dsub Cable * [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=8452|PTFE cables]] |
Transmission Monitor's Vibration Isolation Stage: preparation (TMS-VIS)
- With a fixed stage.
- TMS = BRT (beam reducing telescope) + GPT (Gouy phase telescope)
|
|
Links to knowledge
LVDTs
Be careful! The pin assignment in the Dsub shell or the signal phases would be different from the below for #1 and #2, as I needed to once detach the pins when I installed the LVDTs (Akutsu).
http://klog.icrr.u-tokyo.ac.jp/osl/?r=5046: note: LVDT1's coil wires were broken.
http://klog.icrr.u-tokyo.ac.jp/osl/?r=5106: note: LVDT6's coil wires were broken.
Actuator coils
Be careful! The pin assignment in the Dsub shell or the signal phases would be different from the below, as I needed to once detach the pins when I installed the coils (Akutsu).
- Tanioka-kun's efforts in 2017
Geophones
Serical# of L-4C |
Vert/Horiz |
Naming of the assembled unit |
Assembler |
404080975 |
Vert |
|
|
404080976 |
Vert |
TMS-VISX: Geo-V2 |
Akutsu |
404080977 |
Vert |
|
|
404080978 |
Vert |
|
|
404084240 |
Vert |
|
|
404084241 |
Vert |
TMS-VISX: Geo-V3 |
Akutsu |
404084242 |
Vert |
TMS-VISX: Geo-V1 |
Fujii -> Akutsu |
2 |
Horiz |
TMS-VISX: Geo-H3 |
Akutsu -> Uraguchi |
3 |
Horiz |
|
|
4 |
Horiz |
TMS-VISX: Geo-H1 |
Akutsu |
5 |
Horiz |
TMS-VISX: Geo-H2 |
Akutsu |
15 |
Horiz |
|
|
16 |
Horiz |
|
|
17 |
Horiz |
|
|
Cabling
- LVDT/Act - (coil wires) - Dsub9M - (Dsub9F - PTFE 2m - Dsub9F) - Dsub9M flange - Flipper cable - Dsub Cable
- Geophone - (MIL C 26482 - PTFE 0.5m - Dsub9M) - (Dsub9F - 1.5m PTFE - Dsub9F) - Dsub9M flange - Flipper cable - Dsub Cable
Task list
Note: some of the tasks can be done in parallel.
Signal Assign
Pin Name |
Resistance |
Equipment |
Assign |
Comment1 |
Comment2 |
Connection |