Line 6: Line 6:
 * Just observed green beam light in EYT.
  * B
ecause the alignment yesterday was not completed, the beam shape is not so clean but it is a milestone that the light reached and went through the 2nd lens of the BRT.
 * Just observed green beam light in EYT; because the alignment yesterday was not completed, the beam shape is not so clean but it is a milestone that the light reached and went through the 2nd lens of the BRT.

20180321

Today's activities

Workers: Akutsu

  • Just observed green beam light in EYT; because the alignment yesterday was not completed, the beam shape is not so clean but it is a milestone that the light reached and went through the 2nd lens of the BRT.

Next plan

  • Measure the height with a laser leveler?
  • Locate the BRT on the stage base on XXX as references.
  • Make GPT on the optical table
  • Make a model to drive signals from the TMS
  • Check the response of the TMS by swinging BS, PR2, PR3... etc... with commissioning people
  • Endのend用のフランジとりつけ。たぶん最後のほうで。
  • そこのフランジにとりつける透過光用ビューポート。まだ柏にあるはず。
  • 外側の光学定盤の上の取り回しを考えよ。

Wanted!

  • Four M10 eye bolts

  • M8 SDC bolts? to tighten the top plate to the stage body are shortened!

  • Markers (black and white)

From VIS

  • Four clean slings (from Hirata-san)