20180321
Today's activities
Workers: Akutsu
- Just observed green beam light in EYT; because the alignment yesterday was not completed, the beam shape is not so clean but it is a milestone that the light reached and went through the 2nd lens of the BRT.
Next plan
- Measure the height with a laser leveler?
- Locate the BRT on the stage base on XXX as references.
- Make GPT on the optical table
- Make a model to drive signals from the TMS
- Check the response of the TMS by swinging BS, PR2, PR3... etc... with commissioning people
- Endのend用のフランジとりつけ。たぶん最後のほうで。
- そこのフランジにとりつける透過光用ビューポート。まだ柏にあるはず。
- 外側の光学定盤の上の取り回しを考えよ。
Wanted!
Four M10 eye bolts
M8 SDC bolts? to tighten the top plate to the stage body are shortened!
- Markers (black and white)
From VIS
- Four clean slings (from Hirata-san)