20180621

Today's activities

Workers: Akutsu, Simon, Ken Tanaka

  • Unpacked the wooden box and took out the WAB by the aid of crane.
  • Brought the WAB into the clean booth for IXC; located on a desk.
  • Checked oblique of the breadboard in IXC.
  • Installed the WAB traverser and checked the oblique as well.
  • Found the magnets on the dampers were moved probably during the transportation; fixed them.
  • Issue: don't know what should be the references for installation and design... actually those parts are why KAGRA's installation work is so slow!!!

Next plan

  • Install the WAB in IXC.
  • Check heights of several points.
  • Check the balance of the suspended WAB.
  • Test the WAB traverser with the WAB.